^t OPERATING DATA REPORT DOCKET NO. 50-269
> DATE> 11-15-84 COAIPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS
- 1. Unit Name- OC "** 1 N
- 2. Reporting Period: Ocenhar 1. 1984-Ocenhar 11- 1984 Year-to-date and cumulative 2568 capacity factors are calcu-
- 3. Licensed Thermal Power (31Wt):
934 lated using a weighted
- 4. Namepiste Rating (Gross SIWE):
886 average for maximum
- 5. Design Electrical Rating (Net SlWe):
dependable capacity.
- 6. Maximum Dependable Capacity (Gross alWe): 899
- 7. Stax! mum Dependable Capacity (Net 31We): 860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted.If Any (Net StWe): Mnna
- 10. Reasons For Restrictions.If Any:
This Slonth Yr. to.Date Cumulative I1. Hours in Reporting Period 7A9.0 7 120.0 99 025.0
- 12. Number Of Houn Reactor Was Critical 121.7 6 671.8 71 212.3
- 13. Reactor Reserve Shutdown Hours ---
- 14. Hours Generator On.Line 119.8 6 661.8 68 051.2
- 15. Unit Resene Shutdown Hours --- --- ---
- 16. Cross Thermal Energy Generated (31WH) 303 008 17 076 674 163 374 706
- 17. Gross Electrical Energy Generated (alWH) 104 110 5 958 410 56 826 640
- 18. Net Electrical Energy Generated (31WH) 95 935 5 692 862 53 858 413
- 19. Unit Service Factor 16.1 91.0 68.7
- 20. Unit Availability Factor 16.1 91.0 68.8
- 21. Unit Capacity Factor (Using SIDC Net) 15.0 90.4 63.1
- 22. Unit Capacity Factor (Using DER Net) 14.5 87.8 61.4
- 23. Unit Forced Outage Rare 0.0 0.5 16.1 i 24. Shutdowns Scheduled Over Nest 6 31onths (Type. Date,and Duration of Eachl:
Currently Refueling
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITI \ L CRITICALITY l
lNITIA L ELECTRICITY CO\l%IERCIAL OPERATION l
27 Y j (9/7:1 411260019 841031 DR ADOCK 05000269 R PDR
l '
. s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-269 UNIT Oconee 1 DATE 11/15/84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 s
HONTH October, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t) (MWe-Ne t) <
1 844 17 --- -
2 846 18 1
i
- 3 845 19 ---
4 845 20 ---
s 5 753 21 ---
6 ---
22 ---
7 ----
23 ---
4 8 ---
24 ---
9 ---
25 ---
10 --- 26 ---
11 ---
27 ---
12 ---
28 ---
13 ---
29 ---
14 ---
30 ---
15 ---
31 ---
16 ---
INSTRUCTIONS On this format, list the average dally unit power level In HWc-Het for each day in the reporting month. Compute to the nearest whole megawatt.
O
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-269 UNIT NAME oeonee 1 -_
DATE 11/is/84 REPORT MONTH octcber 1994 COMPLETED BY J. a. neavis TELEPHONE 704-373-7567 "s_
O c o o,$ License y Cause & Corrective SO "c uSE =
No. Date ~. %h 3 y3c Event h"' h Action to
$ o-M US E US$ R" g" c: Imo Report i mo oO Prevent Recurrence 3 84-10-05 s 625.22 C 1 BC FUELXX End of Cycle 8 Refueling Outage l
I I
h I
t I
l _
i l i :
L.- - .
1 2 3 4 FR Reason: Method:
A-Equipment Failure (Explain) Exhibit G - Instmctions 1-Manual for Preparation of Data B-lhintenance or Test 2-Marnral Scram Entry Sheets for Licensee C-Refueling 3-Autcnatic Scram D-Regulatory Restriction Event Report (LER) 4-Other (Explain) File (NLREG-0161)
E-Operater Training 4 License Frartination F-khinistrative 5 G-Operational Error (Explain)
If-Other (Explain) Exhibit I - Sme Source 00/77)
- DOCKET NO: 50-269 UNIT: oconee i DATE: 11/15 /a4 NARRATIVE
SUMMARY
Months october 1984 _
Tho unit in in a refueling outage.
,' MONTIILY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 1 ,
- 2. Scheduled next refueling shutdown: Currently Refueling ,
- 3. Scheduled restart following refueling: .
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes .
If yes, what will these be? Technical Specification Revision "J
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,
5.
Scheduled information:date(s)/Afor N submitting proposed licensing action and supporting i 6. Important licensing considerations (new or different design or supplier.
?
unroviewed design or performance analysis methods, significant changes in design or new operating procedures) .
- 7. Number of fuel assemblies (a) in the core: 177 .
(b) in the spent fuel pools 1096* ,
- 8. Present licensed fuel pool capacity: 1312 ,
Size of requested or planned increase .
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 .
DUKE POWER COMPANY Dates November 15, 1984 ,
Name of Contact J. A. Roavis Phones 704-373-7567
- Represent n the cor bined total for Unito I and 2.
i .
OPERATING DATA REPORT DOCKET NO. 50-270 DATE 11-15-84~
CO.\ lPLETED BY _J.A. Reavis TELEPil0NE 704-373-7567 OPERATING STATUS
- 1. Unit Name: Oconeo 2 Notes
- 2. Reporting Period: 0ctober 1. 1984-October 31. 1984 Year-to-dato and cumulativo
- 3. Licensed Thermal Power ISIWI): 569 capacity factors are calcu-
- 4. Nameplate Rating (Gross SIWE): 934 lated using a weighted
- 5. Design Electrical Rating (Net alWe): 886 average for maximum
- 6. Stasimum Dependable Capacity (Gross 31We): 899 dependablo capacity.
- 7. Stasimum Dependable Capacity (Net SlWe): *
- 8. If Chan;es occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
11ono
- 9. Power Level To Which Restricted.lf Any (Net SIWE): IJono
- 10. Reasons For Restrictions. lf Any:
This alonth Yr..to Date . Cumulative
!!. Ilours in Reporting Period 745.0 7 320.0 88 945.0
- 12. Number Of flours Reactor Was Critical 745.0 7 320.0 64 633.5
- 13. Reactor Re=erve Shutdown llours --- --- ---
- 14. Ilours Generator On.Line 745.0 7 320.0 63 480.2
- 15. Unit Reserse Shutdown flours --- ---
- 16. Gross Thermal Energy Generated 15tWil) 1 750 062 18 521 725 151 014 392
- 17. Gross Electrical Energy Generated (SIWil) 590 440 - 6 349 090 51 453 946
- 18. Net Electrical Energy Generated (31Wil) 561 754 6 079 515 48 891 084 100.0
- 19. Unit Service Factor 100.0 71,4
- 20. Unit Asailability Factor 100.0 100.0 71.4
- 21. Unit Capacity Factor IUsing SIDC Net) 87 7 96.6 63.7
- 22. Unit Capacity Factor IUsing DER Net) 85.1 93.7
- 23. Unit Forced Outage Rate 62.0 __
0.0 .
0.0 14.9
- 24. Shutdowns Scheduled Oser Nest 6 Slonths IType. Date,and Duration of Fach t:
Refueling - February 4,1985 - 9 Weeks l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Unitiin fest Status t Prior to Commercial 0peration): Forecast Achiesed INITI \ L CRlrlCALITY INITl \ L ELEC TRICITY CO\l\lERCl \ L OPE R A T10N ,
10/77)
. AVERAGE DAILY UtilT POWER LEVEL t
DOCKET NO. 50-270
/
UNIT _Ocnnee 2 f DATE 11/1sfg4 COMPLETED BY J.A. Reavis TELEPHONE __704-373-7567 MONTH October. 1994 .,
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAl'i.Y F0WER LEVEL (HWe-Net) (MWe-Ne t)
I 825 17 376 2 826 18 100 3 824 19 100 O 825 2l) qq3 .
5 _825 21 g7s 6 820 22 g7s 7 791 23 n7, s 8 825 c 24 p ., g 9 826 25 g 7 7..
10 A7% 26 g ,, .,
II 825 27 R10 .
12 813 _
28 pg, 13 818 29 gyn Ik 826 30 g ., g 15 826 31 g,g Ib 827 INSTRUCTl0 tis s
On this format, list the average daily unit power level in MWe-Net for caci. day in the reporting month. Compute to the nearest whole megawatt.
I
- 2 - ij y3 4 ,
-p.
UNIT SHUTD06MS AND POWER REDUCTIONS DOCKET NO. '50-270 UNIT IUWE oconee 2 -
. DATE 11/15/34 REPORT MONTH october - C0plETED BY J. A. meavis.
TELEP M 703-373-7567 e m o ,
e
^
gj License y Cauw & Corrective ~
- SO "eo uSE ~
3 Action to No. Date % %g ;3 Event h'a ge, tF o, =a :
a:
28 Emo Report #
' ni mu si uo Prevent Recurrence-16-P 84-10-06 S - B -
CC VALVEX Control & Stop Valve Movement PT's;
~
17-P' 84-10-12 S ,
B - CC VALVEX Turbine Control Valve Movement PT 18-P 84-10-13 F --
A - HC XXXXXX Drain Water from Air Ejector'. Lines 19-P 84-10-17 F -
A - HB IrfEXCH Moisture Separator Reheater Drain Leak 20-P 84-10-23 P -
A -
HC~ XXXXXX Drain Water from Air Ejector Lines s
w w
, C.
~
1 2 3 4 Reason: Method: Exhibit G Instructions
[N g A-Equipment Failure (Explain) 1-Manual for Prewration of Data '
B-Maintenance or Test , 2-Manual Scrami Entry Swets for Licensee C-Refueling 3-Automaatic Scramt. Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) - File (MREG-0161)
E-Operator Training 6 License Ernmination ' '
F-Administrative 5 G-Operational Error (Explain) '
Exhibit I - Same Source H-Other (Explain) e (9/771
~
fi[ ,,. ,
__,. y .
Q' PIN '
."%, ~
DOCKET NO: 50-270
r
/-;
UNIT: oconee 2' s.
DATE: 11/15/84
.).
- NARRATIVE
SUMMARY
Month: Ocbober'1984 ,.
b The unit reduced power on 10/06 and '10/12 to perform PT's. On 10/13 and 10/23, the unit drained Air Ejector lines that were filled with water'to' improve condenser efficiency. The unit was forced to reduce power to 25% because of a leaking Moisture Seperator Reheater drain line. The drop in. output caused
- the drop in pressure on the line needed to effect repairs.
j.
J t
]
q,f. ,
MONTHLY REFUELING INFORMATION REQUEST'
- 1. . Facility name: Oconee Unit 2 , _
- 2. . Scheduled next refor1.ing shutdown: February , 1985 ,
- 3. Scheduled restart following refueling:. April, 1985 ,
t
- 4. Will refueling or resumption of' operation thereafter require a technical specification change or other license amendment? Yes ,
If yes, what will these be? -Technical Specification Revisicn 1
If no, has reload design and core configuration been reviewed by Safety '
Review Committee regarding unreviewed safety questions? N/A ,
! 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core: 177 ,
(b) in the spent fuel pool: 1096* ,
- 8. Present licensed fuel pool capacity: 1312 .
Size of requested or planned increase: .
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August. 1991 .
DUKE POWER COMPANY Date: November 15, 1984 ,
Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined total for Units 1 and 2.
. - , - _ _ _,.m.__r. - , _ _ . , _.,..-_-___._-._-..-..__._.,.y - _ _ , , . , _ _ , . ,, , _. , ,. ,.y -
., ,-. _ , _ . , ,..., , ,p.,o
'N L '
w" w L
- f' .
OPERATING DATA REPOR,T k<
7 ' DOCKET NO. 50-287- -
DATE 11-13-54 CO31PLETED BY J.A. Reavis~
-- . TELEPHONE 704-373-7567.
OPERATING STATUS oconee 3 Notes -
- 1. Unit Name: ,
- 2. Reportirag Period: October 1.1984-October 31. 1984 ' Year-to-date and cumulative 2568- capacity factors are calcu-
- 3. Licensed Thermal Power (alWt):
- 4. Nameplate Rating (Gross SIWE): 934 lated. using a .weigided 886 average for maximum
- 5. Design Electrical Rating (Net SIWE):
899 dependable capacity. *
- 6. Staximum Dependable Capacity (Gross 31We):
- 7. Sf aximum Dependable Capacity (Net alwe)i 860
~
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
, None
- 9. Power Level To which Restricted.lf Any (Net alwe):
- 10. Reasons For Restrictions.If Any:
This alonth Yr..to.Date Cumulative ..
II. Hours in Reporting Period 745.0 7 320.0 86 592.0
- 12. Number Of Hours Reactor Was Critical 745.0 5 371.6 62 081.5-
- 13. Reactor Reserve Shutdown Hours --- --- ---
- 14. Hours Generator On Line 745.0 5 312.4 60 915.0-
- 15. Unit Reserve Shutdown Hours ---
l 16. Gross Thermal Energy Generated (AlWH) 1'920 142 11 405 250 148 897 814 l 17. Gross Electrical Energy Generated (SIWH) 656 300 4 612 690 51 427 284
- 18. Net Electrical Energy Generated (31WH) 627 689 4 403 166 48 970 284 i 19. Unit Service Factor 100.0 -72.9 70.4
- 20. Unit Assilability Factor 100.0 72.9 70.4
- 21. Unit Capacity Factor (Using alDC Net) 4R n 60.9 65.6
- 22. Unit Capacity Factor (Using DER Net) 95.1 67.9 63.8
- 23. Unit Forced Outage Rate 0.0 1.6 14.2
[ 24. Shutdowns Scheduled Over Next 6 Slonths (Type.Date.and Duration of Eacht:
- None l 25. If Shut Down At End Of Report Period Estimated Date of Startup
- 26. Units In Test Status iPrior to Commercial Operationi: Forecast Achieved
- l. INITIA L CRITICA LITY INITIA L ELECTRICITY CO\lNIERCIAL OPERATION (9/771
= ,.
~ '
^
. 6 ., . , ,
+
AVERAGE DAILY UNIT POWER LEVEL (
[ '
DOCKET NO. 50-287-s.
UNIT. 0c' onee 3 .
il fi s /ga --
DATE-
?
' COMPLETED BY - ~J A. ..Reavis.
~
TELEPHONE: 704-373-7567 MONTH ~ October. 1984 ~
DAY AVERAGE DAILY.' POWER LEVEL' ' DAY
- AVERAGE _ DAILY' POW 5R LEVEL
-(MWe-Net)
~ (MWe-Ne t) 1 841 17 844 2- 841 18 845 3 842 19- 845
-841 20 - 845 5 g41 21 845 6 g43 22 845 7- gol m 23 -
844 ~
8 gal 24 _ 844 9 g4?
25 : 844 10 gm 26 845 11 842 27 845 12 ga? 28 880 13 g?7 29 844-14 ga, 30 844 15 gai 31 844 16- agg INSTRUCTIONS On this format, list in the reporting month. the average daily unit power level in MWe-Net for each day Compute to the nearest whole megawatt.
- .-y -,, - . - . ,--- , ,- - --,e. .w- . , ,-w -- ,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-287 UNIT NAME oconee 3 -
DATE 11/15/s4 REPORT MONTH october 1984 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 ~
"s.
O c gj License g . Cause & Corrective 32 "e o28 m o
& ' Action to-No. Date ~
a % i; g .g g c Event ,&r, . , n, a- s- o m ewx mo N 53 $ $55 Report # #8 $o8 Prevent Recurrence 14-P 84-10-12 S --
B -- CC VALVEX Turbine Control & Stop Valve Movement PT s-15-P 84-10-16 F --
A -- HC XXXXXX Drain Water from Air Ejector Lines 4 s
1 1 2 3 _ 4 Reason: Method: Exhibit G - Instnictions '
S led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee
- C-Refueling 3-Automatic Scram Event Report- (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161).
E-Operator Training 6 License Examination F-Administrative 5 G-Operational- Error (Explain) Exhibit I - Same-Source II-Other (Explain)
^
(0/771 ,
. 8 g
r.
~
. ,. .c .;
.; m: j
'j
%& l r .
- u. l
, . ; .I
~ -
. ' DOCKET NO; 50-287~
-UNIT: Oconee 3~ 4 e -
DATE: 11/15/84
-+'
NARRATIVE
SUMMARY
rn ,,,
Month: ~ october 1984-4" i- A power reduction was made on110/12 for a PT and on 10/16 to drain water-from 1
' Air. Ejector lines that were affecting;conden,ser efficiency. 1 .
- s Y
'l P
4
_s t
4 4 E 9
I
]
4 e
1 1
- g ,
+ - -, ,, -- . - - . , , ~ . _ ,. - , , ,,- --- - --- , - - . , ,- . - - - - , -
, - - . .= .
M '. s
~
MONTHLY REFUELING INFORMATION REQUEST- J ,
'1. Facility name: Oconee Unit 3 ,
- 2. Scheduled next refueling shutdown: September 1985 ,
~
- 3. . Scheduled restart following refueling: November 1985
- 1
- 4. Will refueling or resumption of operation-thereafter require a technical.
specification change or other licenae amendment? Yes .
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ..
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: - N/A ,
- 6. Important licensing considerations (new or different design or supplier,
~
unreviewed design or. performance analysis methods, significant changes in design or new operating procedures).
1 i
1 E
a 7. Number of fuel assemblies (a) in the core: 177 .
f (b) in the spent fuel pool: 158 .
- 8. Present licensed fuel pool capacity: 825 .
Size of requested or planned increase: .
- 9. Projected date of last refueling which can be accommodated by present
, licensed capacity: August 1991 .
DUKE POWER COMPANY Date: November 15, 1984 ,
Name of
Contact:
J. A. Reavis Phone: 704-373-7567
l '? , ) <
1;l " 3 he
. s. ,
- ~
4 OCONEE NUCLEAR STATION ,
MonthliOperating.StatusReport ~
- x. -
-1. Personnel Exposure / <
.o For the month <of September, no individuals exceeded 10 percent of.their-allowable annual radition dose limit. -
e ,
- 2. The total station liquid release for September has been compared withL
(
" - the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit. > '
The total station gaseous release for September has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of.this limit.
P s
i 4
-<n -
)
DUKE POWER GOMPANY P.O. BOX 33189 CHARLOf!TE, N.C. 28942 HALB. TUCKER 1 Tatarnown wwuroaminent . .(704) 373-4531
= = = - =.o. ..
November 15, 1984 Director ,
T office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk Re: Oconee Nuclear Station-Docket Nos.'50-269,' -270, -287
Dear Sir:
q Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of October, 1984. -
Very truly yours, Odk<
Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Ms. Helen Nicolaras, Project Manager U. . S. Nuclear Regulatory Counission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101+Marietta Street, NW, Suite 2900 Washington, D. C. 20555 Atlanta, Georgia 30323 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 circle 75 Parkway