ML20099E683

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1984
ML20099E683
Person / Time
Site: Oconee  
Issue date: 10/31/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8411260019
Download: ML20099E683 (17)


Text

y

^t OPERATING DATA REPORT DOCKET NO.

50-269 DATE> 11-15-84 COAIPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name-OC "** 1 N
2. Reporting Period: Ocenhar 1.

1984-Ocenhar 11-1984 Year-to-date and cumulative

3. Licensed Thermal Power (31Wt):

2568 capacity factors are calcu-934 lated using a weighted

4. Namepiste Rating (Gross SIWE):

886 average for maximum

5. Design Electrical Rating (Net SlWe):

dependable capacity.

6. Maximum Dependable Capacity (Gross alWe):

899

7. Stax! mum Dependable Capacity (Net 31We):

860

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted.If Any (Net StWe):

Mnna

10. Reasons For Restrictions.If Any:

This Slonth Yr. to.Date Cumulative I1. Hours in Reporting Period 7A9.0 7 120.0 99 025.0

12. Number Of Houn Reactor Was Critical 121.7 6 671.8 71 212.3
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 119.8 6 661.8 68 051.2
15. Unit Resene Shutdown Hours
16. Cross Thermal Energy Generated (31WH) 303 008 17 076 674 163 374 706
17. Gross Electrical Energy Generated (alWH) 104 110 5 958 410 56 826 640
18. Net Electrical Energy Generated (31WH) 95 935 5 692 862 53 858 413
19. Unit Service Factor 16.1 91.0 68.7
20. Unit Availability Factor 16.1 91.0 68.8
21. Unit Capacity Factor (Using SIDC Net) 15.0 90.4 63.1
22. Unit Capacity Factor (Using DER Net) 14.5 87.8 61.4
23. Unit Forced Outage Rare 0.0 0.5 16.1 i
24. Shutdowns Scheduled Over Nest 6 31onths (Type. Date,and Duration of Eachl:

Currently Refueling

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

Forecast Achiesed INITI \\ L CRITICALITY l

lNITIA L ELECTRICITY CO\\l%IERCIAL OPERATION l

27 Y j (9/7:1 411260019 841031 DR ADOCK 05000269 R

PDR

l AVERAGE DAILY UNIT POWER LEVEL s

DOCKET NO.

50-269 UNIT Oconee 1 DATE 11/15/84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 s

HONTH October, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t)

(MWe-Ne t) 1 844 17 1

2 846 18 i

3 845 19 4

845 20 s

5 753 21 6

22 7

23 4

8 24 9

25 10 26 11 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average dally unit power level In HWc-Het for each day in the reporting month. Compute to the nearest whole megawatt.

O

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-269 UNIT NAME oeonee 1 DATE 11/is/84 REPORT MONTH octcber 1994 COMPLETED BY J. a. neavis TELEPHONE 704-373-7567 "s_

O o o,$

License y

Cause & Corrective cSO "c

uSE h"'

h Action to

=

No.

Date

~.

%h 3

y3c Event US E

US$

R" g"

M o-c:

Imo Report i mo oO Prevent Recurrence 3

84-10-05 s

625.22 C

1 BC FUELXX End of Cycle 8 Refueling Outage l

I.

I h

I t

I l

l i

i L.-

1 2

3 4

Reason:

Method:

Exhibit G - Instmctions FR A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-lhintenance or Test 2-Marnral Scram Entry Sheets for Licensee C-Refueling 3-Autcnatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NLREG-0161)

E-Operater Training 4 License Frartination F-khinistrative 5

G-Operational Error (Explain)

Exhibit I - Sme Source If-Other (Explain) 00/77)

DOCKET NO:

50-269 UNIT:

oconee i DATE:

11/15 /a4 NARRATIVE

SUMMARY

Months october 1984 Tho unit in in a refueling outage.

MONTIILY REFUELING INFORMATION REQUEST 1.

Facility name:

Oconee Unit 1 2.

Scheduled next refueling shutdown:

Currently Refueling 3.

Scheduled restart following refueling:

4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision "J

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A Scheduled date(s)/Afor submitting proposed licensing action and supporting 5.

information:

N i

6.

Important licensing considerations (new or different design or supplier.

?

unroviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pools 1096*

8.

Present licensed fuel pool capacity:

1312 Size of requested or planned increase 9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Dates November 15, 1984 Name of Contact J. A. Roavis Phones 704-373-7567

  • Represent n the cor bined total for Unito I and 2.

i OPERATING DATA REPORT DOCKET NO.

50-270 DATE 11-15-84~

CO. lPLETED BY

_J.A. Reavis

\\

TELEPil0NE 704-373-7567 OPERATING STATUS

1. Unit Name:

Oconeo 2 Notes

2. Reporting Period: 0ctober 1. 1984-October 31. 1984 Year-to-dato and cumulativo
3. Licensed Thermal Power ISIWI):

569 capacity factors are calcu-

4. Nameplate Rating (Gross SIWE):

934 lated using a weighted

5. Design Electrical Rating (Net alWe):

886 average for maximum

6. Stasimum Dependable Capacity (Gross 31We):

899 dependablo capacity.

7. Stasimum Dependable Capacity (Net SlWe):
8. If Chan;es occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

11ono

9. Power Level To Which Restricted.lf Any (Net SIWE):

IJono

10. Reasons For Restrictions. lf Any:

This alonth Yr..to Date Cumulative

!!. Ilours in Reporting Period 745.0 7 320.0 88 945.0

12. Number Of flours Reactor Was Critical 745.0 7 320.0 64 633.5
13. Reactor Re=erve Shutdown llours
14. Ilours Generator On.Line 745.0 7 320.0 63 480.2
15. Unit Reserse Shutdown flours
16. Gross Thermal Energy Generated 15tWil) 1 750 062 18 521 725 151 014 392
17. Gross Electrical Energy Generated (SIWil) 590 440 -

6 349 090 51 453 946

18. Net Electrical Energy Generated (31Wil) 561 754 6 079 515 48 891 084
19. Unit Service Factor 100.0 100.0 71,4
20. Unit Asailability Factor 100.0 100.0 71.4
21. Unit Capacity Factor IUsing SIDC Net) 87 7 96.6 63.7
22. Unit Capacity Factor IUsing DER Net) 85.1 93.7 62.0 __
23. Unit Forced Outage Rate 0.0 0.0 14.9
24. Shutdowns Scheduled Oser Nest 6 Slonths IType. Date,and Duration of Fach t:

Refueling - February 4,1985 - 9 Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

l

26. Unitiin fest Status t Prior to Commercial 0peration):

Forecast Achiesed INITI \\ L CRlrlCALITY INITl \\ L ELEC TRICITY CO\\l\\lERCl \\ L OPE R A T10N 10/77)

AVERAGE DAILY UtilT POWER LEVEL t

DOCKET NO.

50-270

/

UNIT _Ocnnee 2 DATE 11/1sfg4 f

COMPLETED BY J.A. Reavis TELEPHONE __704-373-7567 MONTH October. 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAl'i.Y F0WER LEVEL (HWe-Net)

(MWe-Ne t)

I 825 17 376 2

826 18 100 3

824 19 100 O

825 2l) qq3 5

_825 21 g7s 6

820 22 g7s 7

791 23 n7, s

8 825 c

24 p., g 9

826 25 g 7 7..

10 A7%

26 g,,.,

II 825 27 R10 12 813 28 pg, 13 818 29 gyn Ik 826 30 g., g 15 826 31 g,g Ib 827 INSTRUCTl0 tis On this format, list the average daily unit power level in MWe-Net for caci. day s

in the reporting month.

Compute to the nearest whole megawatt.

I

2 -

ij y3 4

  • -p.

UNIT SHUTD06MS AND POWER REDUCTIONS DOCKET NO.

'50-270 UNIT IUWE oconee 2 DATE 11/15/34 REPORT MONTH october C0plETED BY J. A. meavis.

TELEP M 703-373-7567 e

m o

gj License y

Cauw & Corrective ~ *

^

eSO "e

uSE h'a 3

Action to No.

Date

%g

3 Event

~

o ge, t

=a 28 ni si Emo Prevent Recurrence-Report #

mu uo F

o, a:

B CC VALVEX Control & Stop Valve Movement PT's; 16-P 84-10-06 S

~

17-P' 84-10-12 S

CC VALVEX Turbine Control Valve Movement PT B

A HC XXXXXX Drain Water from Air Ejector'. Lines 18-P 84-10-13 F

19-P 84-10-17 F

A HB IrfEXCH Moisture Separator Reheater Drain Leak 20-P 84-10-23 P

A HC~

XXXXXX Drain Water from Air Ejector Lines s

w w

C.

~

1 2

3 4

Reason:

Method:

Exhibit G Instructions

[N A-Equipment Failure (Explain) 1-Manual for Prewration of Data g

B-Maintenance or Test 2-Manual Scrami Entry Swets for Licensee C-Refueling 3-Automaatic Scramt.

Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) -

File (MREG-0161)

E-Operator Training 6 License Ernmination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain) e (9/771

fi[

~

y Q' PIN '

~

DOCKET NO:

50-270

/-

UNIT:

oconee 2' r

s.

DATE:

11/15/84

..).

NARRATIVE

SUMMARY

Month: Ocbober'1984 b

The unit reduced power on 10/06 and '10/12 to perform PT's.

On 10/13 and 10/23, the unit drained Air Ejector lines that were filled with water'to' improve condenser efficiency. The unit was forced to reduce power to 25% because of a leaking Moisture Seperator Reheater drain line. The drop in. output caused

- the drop in pressure on the line needed to effect repairs.

j.

J t

]

q,f.

MONTHLY REFUELING INFORMATION REQUEST'

1.. Facility name:

Oconee Unit 2

2.. Scheduled next refor1.ing shutdown:

February, 1985 3.

Scheduled restart following refueling:. April, 1985 t

4.

Will refueling or resumption of' operation thereafter require a technical specification change or other license amendment?

Yes If yes, what will these be?

-Technical Specification Revisicn If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

1096*

8.

Present licensed fuel pool capacity:

1312 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August. 1991 November 15, 1984 DUKE POWER COMPANY Date:

704-373-7567 Name of

Contact:

J. A. Reavis Phone:

  • Represents the combined total for Units 1 and 2.

_,.m.__r.

_.,..-_-___._-._-..-..__._.,.y

,.y

,p.,o

'N L

w w

L

- f' OPERATING DATA REPOR,T k<

' DOCKET NO.

50-287-7 DATE 11-13-54 CO31PLETED BY J.A. Reavis~

. TELEPHONE 704-373-7567.

OPERATING STATUS

1. Unit Name:

oconee 3 Notes -

2. Reportirag Period: October 1.1984-October 31. 1984

' Year-to-date and cumulative

3. Licensed Thermal Power (alWt):

2568-capacity factors are calcu-

4. Nameplate Rating (Gross SIWE):

934 lated. using a.weigided 886 average for maximum

5. Design Electrical Rating (Net SIWE):

dependable capacity.

6. Staximum Dependable Capacity (Gross 31We):

899

7. Sf aximum Dependable Capacity (Net alwe)i 860
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

~

None

9. Power Level To which Restricted.lf Any (Net alwe):
10. Reasons For Restrictions.If Any:

This alonth Yr..to.Date Cumulative II. Hours in Reporting Period 745.0 7 320.0 86 592.0

12. Number Of Hours Reactor Was Critical 745.0 5 371.6 62 081.5-
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 745.0 5 312.4 60 915.0-
15. Unit Reserve Shutdown Hours l
16. Gross Thermal Energy Generated (AlWH) 1'920 142 11 405 250 148 897 814 l
17. Gross Electrical Energy Generated (SIWH) 656 300 4 612 690 51 427 284
18. Net Electrical Energy Generated (31WH) 627 689 4 403 166 48 970 284 i
19. Unit Service Factor 100.0

-72.9 70.4

20. Unit Assilability Factor 100.0 72.9 70.4
21. Unit Capacity Factor (Using alDC Net) 4R n 60.9 65.6
22. Unit Capacity Factor (Using DER Net) 95.1 67.9 63.8
23. Unit Forced Outage Rate 0.0 1.6 14.2

[

24. Shutdowns Scheduled Over Next 6 Slonths (Type.Date.and Duration of Eacht:

None l

25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units In Test Status iPrior to Commercial Operationi:

Forecast Achieved l.

INITIA L CRITICA LITY INITIA L ELECTRICITY CO\\lNIERCIAL OPERATION (9/771

=

~

6.,

^

+

AVERAGE DAILY UNIT POWER LEVEL (

[

DOCKET NO.

50-287-s.

UNIT. 0c' onee 3.

DATE-il fi s /ga --

?

COMPLETED BY - ~J A...Reavis.

~

TELEPHONE:

704-373-7567 MONTH ~

October. 1984

~

DAY AVERAGE DAILY.' POWER LEVEL'

' DAY

AVERAGE _ DAILY' POW 5R LEVEL

-(MWe-Net)

~ (MWe-Ne t) 1 841 17 844 2-841 18 845 3

842 19-845 -841 20

- 845 5

g41 21 845 6

g43 22 845 7-gol 23 844

~

m 8

gal 24 844 9

g4?

25

844 10 gm 26 845 11 842 27 845 12 ga?

28 880 13 g?7 29 844-14 ga, 30 844 15 gai 31 844 16-agg INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

.-y

--,e.

.w-

,-w

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-287 UNIT NAME oconee 3 DATE 11/15/s4 REPORT MONTH october 1984 COMPLETED BY J.

A.

Reavis TELEPHONE 704-373-7567 ~

"s.

O gj License g

Cause & Corrective c32 "e

o28 m

o No.

Date

% i; g

.g g c Event

,&r,

' Action to-

~

., n, a

a-s-o m

ewx mo N 53

$55 Report #

  1. 8

$o Prevent Recurrence 8

14-P 84-10-12 S

B CC VALVEX Turbine Control & Stop Valve Movement PT s-15-P 84-10-16 F

A HC XXXXXX Drain Water from Air Ejector Lines 4

s 1

1 2

3 4

Reason:

Method:

Exhibit G - Instnictions A-Equipment Failure (Explain) 1-Manual for Preparation of Data S

led B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report- (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161).

E-Operator Training 6 License Examination F-Administrative 5

G-Operational-Error (Explain)

Exhibit I - Same-Source II-Other (Explain)

^

(0/771

g

. 8 r.

~

.c m:

j

' j l

r u.

' DOCKET NO; 50-287~

~ -

-UNIT: Oconee 3~

4 e

DATE: 11/15/84

- + '

NARRATIVE

SUMMARY

rn Month: ~ october 1984-4 "

i -

A power reduction was made on110/12 for a PT and on 10/16 to drain water-from 1

Air. Ejector lines that were affecting;conden,ser efficiency.

1 s

Y

'l P

4

_s t

4 E

4 9

I

]

4 e

1 1

g

+

. - -.,, ~.

.=

M s

~

MONTHLY REFUELING INFORMATION REQUEST-J Oconee Unit 3

'1.

Facility name:

2.

Scheduled next refueling shutdown:

September 1985 November 1985

~

3.. Scheduled restart following refueling:

1 4.

Will refueling or resumption of operation-thereafter require a technical.

specification change or other licenae amendment?

Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: - N/A 6.

Important licensing considerations (new or different design or supplier,

~

unreviewed design or. performance analysis methods, significant changes in design or new operating procedures).

1 i

1 E

a 7.

Number of fuel assemblies (a) in the core:

177 f

(b) in the spent fuel pool:

158 8.

Present licensed fuel pool capacity:

825 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Date:

November 15, 1984 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

l '?

)

1;l "

3 s.

he

  • ~

4 OCONEE NUCLEAR STATION MonthliOperating.StatusReport

~

x.

-1.

Personnel Exposure

/

. o For the month <of September, no individuals exceeded 10 percent of.their-allowable annual radition dose limit.

e 2.

The total station liquid release for September has been compared withL

" - the Technical Specifications maximum annual dose commitment and was

(

less than 10 percent of this limit.

The total station gaseous release for September has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of.this limit.

P s

i 4

-<n

)

DUKE POWER GOMPANY P.O. BOX 33189 CHARLOf!TE, N.C. 28942 HALB. TUCKER 1 Tatarnown wwuroaminent

.(704) 373-4531

= = = - =.o.

November 15, 1984 Director T office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Document Control Desk Re: Oconee Nuclear Station-Docket Nos.'50-269,' -270, -287

Dear Sir:

q Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of October, 1984.

Very truly yours, Odk<

Hal B. Tucker JAR:scs Attachments cc: Regional Administrator Ms. Helen Nicolaras, Project Manager U.. S. Nuclear Regulatory Counission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101+Marietta Street, NW, Suite 2900 Washington, D. C.

20555 Atlanta, Georgia 30323 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 circle 75 Parkway Washington, D. C.

20555 Atlanta, Georgia 30339 American Nuclear Insurers Senior Resident Inspector c/o Dottie Sherman, ANI Library Oconee Nuclear Station The Exchange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032 d

i i

./

-m s \\

1