ML17229A664: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DISTRIBUTION YSTEM (RIDS)ACCESSION NBR:9803180016 DOC.DATE: 98/02/28 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAT       INFORMATION DISTRIBUTION YSTEM (RIDS)
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.50"389 St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.
ACCESSION NBR:9803180016           DOC.DATE: 98/02/28 NOTARIZED: NO                     DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.                           05000335 50"389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.                         05000389 AUTH. NAME           AUTHOR AFFILIATION ROGERS,J.A.           Florida   Power & Light Co.
Florida Power&Light Co.STALL, J.A.Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
STALL, J.A.           Florida   Power 6 Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Feb 1998 for St Lucie,Units 1&.2.W/980310 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E INTERNAL: RECIPIENT ID CODE/NAME PD2-3 PD R 01 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME GLEAVES,W AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 0 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts         for Feb 1998   for St Lucie,Units       1 &.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415"2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 r
2.W/980310     ltr.
Florida Power&Light Company, 6351 S.Ocean Drive, Jensen Beach, FL 34957 March 10, 1998 L-98-71 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC.20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us.Very trul yours, J.A.Stall Vice President St.Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 980$i800ih 980228 PDR ADQCK 05000335 R.'DR IIIIIII!llfllfllllllf Ill lf illill f fff ff f f an FPL Group company  
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
,h DOCKET NO 50-335 UNI'f NAME'T.LUCIE UNIT 1 DATE 03/05/98 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: FEBRUARY 1998 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours 510.4 504.0 0.0 1099.2 1049.5 0.0 144625.5 142989.7 0.0 6.Net Electrical Energy (MWH)423686 798515 115683574 UMMARY OF PERAT EXP IE E DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
TITLE: Monthly Operating Report (per Tech Specs)
50-335 St.Lucie g1 March 5, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH eb 1 Unit 1 operated at full power through February 16.On February 17, the unit downpowered and was removed from service at 0334 to replace seals on the 1B2 reactor coolant pump.The unit was returned'to service at 0333 on February 24, and reached full power at 1837.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
E NOTES:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: 50-335 ST.LUCIE UNIT 1 March 5, 1998 J.A.Rogers Number Date Type'uration (Hours)Reason'ethod of Shutting Down Reactor'ause
RECIPIENT            COPIES              RECIPIENT             COPIES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME         LTTR ENCL              0 PD2-3 PD                   1     1       GLEAVES,W                1     1 INTERNAL:                              1     1       AEOD/SPD/RRAB             1    1 R  01        1    1      OC/DBA/PAD               1     1 1     1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1 NRC PDR                    1     1 D
&Corrective Action to Prevent Recurrence 2/17/98 0.0 Unit I downpowered to replace 1B2 reactor coolant pump seals.2/17/98 S 168.0 Unit I offline to replace 1B2 reactor coolant pump seals.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)091S47 PN DOCKET NO 50-389 UNIT NAME ST.LUCIE UNIT 2 DATE 03/05/98 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: FEBRUARY 1998 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours 672 672 0.0 1416 1416 0.0 108657.5 107056.6 0.0 6.Net Electrical Energy (MWH)577194 1212163 87478556 Y OPERATI EXPERIE E DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
NOTE TO ALL "RIDS" RECIPIENTS:
50-389 St.Lucie 52 March 5, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of February.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415 "2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
 
50-389 ST LUCIE UNIT 2 March 5;1998 J.A.Rogers (561)467-7296 REPORT MONTH Number Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'ause
r Florida Power & Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 March 10, 1998 L-98-71 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC.20555 Re:     St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
&Corrective Action to Prevent Recurrence Unit 2 operated at essentially full power for the entire month of February.1 F Forced S Scheduled 2 Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)}}
Should there be any questions on this information, please contact us.
Very trul yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 980$ i800ih 980228 PDR R       .         'DR ADQCK 05000335 IIIIIII!llfllfllllllf Illlfillillffffffff an FPL Group company
 
,h DOCKET NO             50 - 335 UNI'fNAME            'T. LUCIE UNIT   1 DATE                   03/05/98 COMPLETED BY           J. A. ROGERS TELEPHONE             561/467/7296 REPORTING PERIOD:             FEBRUARY 1998
: 1. Design Electrical Rating (Mwe-Net)       830
: 2. Maximum Dependable Capacity (Mwe-Net)     839 MONTH -YTD-   CUMULATIVE
: 3. Number   of Hours Reactor Critical         510.4  1099.2  144625.5
: 4. Number of Hours   Generator On Line       504.0  1049.5  142989.7
: 5. Unit Reserve Shutdown Hours               0.0     0.0     0.0
: 6. Net Electrical Energy (MWH)               423686 798515 115683574
 
UMMARY OF   PERAT     EXP IE E DOCKET NO.:   50-335 UNIT:          St. Lucie   g1 DATE:          March 5, 1998 COMPLETED BY:  J.A.ROGERS TELEPHONE:      (561) 467-7296 REPORT MONTH   eb     1 Unit 1 operated at full power through February 16. On February 17, the unit downpowered and was removed from service at 0334 to replace seals on the 1B2 reactor coolant pump. The unit was returned 'to service at 0333 on February 24, and reached   full power at 1837.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
 
UNIT     SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:   50-335 UNIT NAME:     ST. LUCIE UNIT 1 DATE:          March 5, 1998 COMPLETED BY: J.A. Rogers Number         Date Type'uration       Reason'ethod of                                       & Corrective (Hours)
Reactor'ause Shutting Down Action to Prevent Recurrence 2/17/98           0.0                                 Unit I downpowered to replace 1B2 reactor coolant pump seals.
2/17/98 S       168.0                                 Unit I offline to replace 1B2 reactor coolant pump seals.
F   Forced             Reason                                                  Method S   Scheduled         A - Equipment failure (explain)                       1 - Manual B - Maintenance or Test                                 2 - Manual Scram C - Refueling                                           3 - Automatic Scram D - Regulatory restriction                             4  - Continued E - Operator Training & License Examination             5  - Load Reduction F - Administrative                                     9  - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 091S47 PN
 
DOCKET NO             50 - 389 UNIT NAME             ST. LUCIE UNIT 2 DATE                   03/05/98 COMPLETED BY           J. A. ROGERS TELEPHONE             561/467/7296 REPORTING PERIOD:             FEBRUARY 1998
: 1. Design Electrical Rating (Mwe-Net)       830
: 2. Maximum Dependable Capacity (Mwe-Net)     839 MONTH   -YTD-   CUMULATIVE
: 3. Number of Hours Reactor Critical         672    1416      108657.5
: 4. Number of Hours   Generator On Line       672    1416    107056.6
: 5. Unit Reserve Shutdown Hours                 0.0   0.0       0.0
: 6. Net Electrical Energy (MWH)               577194 1212163   87478556
 
Y     OPERATI   EXPERIE   E DOCKET NO.:     50-389 UNIT:            St. Lucie   52 DATE:            March 5, 1998 COMPLETED BY:    J.A.ROGERS TELEPHONE:        (561) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of February.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
 
UNIT SHUTDOWNS AND               POWER REDUCTIONS DOCKET NO.:             50-389 UNIT NAME:             ST LUCIE UNIT   2 DATE:                  March 5; 1998 COMPLETED BY:          J. A. Rogers TELEPHONE:              (561) 467-7296 REPORT MONTH Number         Date   Type       Duration     Reason'ethod of                                 & Corrective (Hours)
Reactor'ause Shutting Down Action to Prevent Recurrence Unit 2 operated at essentially full power for the entire month of February.
1                     2                                                  3 F Forced           Reason                                                Method S Scheduled       A - Equipment failure (explain)                       1 - Manual B - Maintenance or Test                               2 - Manual Scram C - Refueling                                         3 - Automatic Scram D - Regulatory restriction                           4  - Continued E - Operator Training & License Examination           5  - Load Reduction F - Administrative                                     9  - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain)}}

Latest revision as of 21:50, 29 October 2019

Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr
ML17229A664
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/28/1998
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-71, NUDOCS 9803180016
Download: ML17229A664 (10)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTION YSTEM (RIDS)

ACCESSION NBR:9803180016 DOC.DATE: 98/02/28 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co. 05000335 50"389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

STALL, J.A. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1998 for St Lucie,Units 1 &.

2.W/980310 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 GLEAVES,W 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 R 01 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415 "2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

r Florida Power & Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 March 10, 1998 L-98-71 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC.20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the February 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us.

Very trul yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 980$ i800ih 980228 PDR R . 'DR ADQCK 05000335 IIIIIII!llfllfllllllf Illlfillillffffffff an FPL Group company

,h DOCKET NO 50 - 335 UNI'fNAME 'T. LUCIE UNIT 1 DATE 03/05/98 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: FEBRUARY 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 510.4 1099.2 144625.5
4. Number of Hours Generator On Line 504.0 1049.5 142989.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 423686 798515 115683574

UMMARY OF PERAT EXP IE E DOCKET NO.: 50-335 UNIT: St. Lucie g1 DATE: March 5, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH eb 1 Unit 1 operated at full power through February 16. On February 17, the unit downpowered and was removed from service at 0334 to replace seals on the 1B2 reactor coolant pump. The unit was returned 'to service at 0333 on February 24, and reached full power at 1837.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST. LUCIE UNIT 1 DATE: March 5, 1998 COMPLETED BY: J.A. Rogers Number Date Type'uration Reason'ethod of & Corrective (Hours)

Reactor'ause Shutting Down Action to Prevent Recurrence 2/17/98 0.0 Unit I downpowered to replace 1B2 reactor coolant pump seals.

2/17/98 S 168.0 Unit I offline to replace 1B2 reactor coolant pump seals.

F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091S47 PN

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 03/05/98 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: FEBRUARY 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 672 1416 108657.5
4. Number of Hours Generator On Line 672 1416 107056.6
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 577194 1212163 87478556

Y OPERATI EXPERIE E DOCKET NO.: 50-389 UNIT: St. Lucie 52 DATE: March 5, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Unit 2 operated at essentially full power for the entire month of February.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: March 5; 1998 COMPLETED BY: J. A. Rogers TELEPHONE: (561) 467-7296 REPORT MONTH Number Date Type Duration Reason'ethod of & Corrective (Hours)

Reactor'ause Shutting Down Action to Prevent Recurrence Unit 2 operated at essentially full power for the entire month of February.

1 2 3 F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)