{{#Wiki_filter:i~CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIO
{{#Wiki_filter:i
'YSTEM (RIDS)ACCESSION NBR:9807210158 DOC.DATE: 98/06/30 NOTARIZED:
                              ~       CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIO             'YSTEM (RIDS)
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&.Light Co.50-'389 St.Lucie Plant, Unit 2, Florida Power&.Light Co.AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.
ACCESSION NBR:9807210158           DOC.DATE: 98/06/30 NOTARIZED: NO                     DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co.                         05000335 50-'389 St. Lucie Plant, Unit 2, Florida Power &. Light Co.                       05000389 AUTH.NAME             AUTHOR AFFILIATION ROGERS,J.A.           Florida   Power & Light Co.
Florida Power&Light Co.STALL,J.A.
STALL,J.A.           Florida   Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for June 1998 for St Lucie,Units 1&2.W/980713 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD COPIES RECIPIENT LTTR ENCL'D CODE/NAME 1 1 GLEAVES,W COPIES LTTR ENCL 1 1 R INTERNAL: AC FILE CENTER RGN2 1 1 1'1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR NOAC 1 1 D 0 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts         for June 1998   for St Lucie,Units       1 &
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10  
2.W/980713   ltr.
~'t EJ I~1~D I lj V]l I 1 II Florida Power&Light Company, 6351 S.Ocean Drive, Jensen Beach, FL 34957~FIPIL July 13, 1998 L-98-189 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the June 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St.Lucie Units 1 and 2.Please contact us should there be any questions regarding this information.
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 9B07210158 980630 PDR ADOCK 05000335 R.PDR an FPL Group company  
TITLE: Monthly Operating Report (per Tech Specs)
~~I I I~g DOCKET NO 50-335 UNIT NARK ST.LUCIE UNIT 1 BATE'7/07/98 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JUNE 1998 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours 720 720 0.0 4026.2 3976.5 0.0 147552.5 145916.7 0.0 6.Net Electrical Energy (MWH)580886 3309070 118194129  
E NOTES:
ID RECIPIENT CODE/NAME PD2-3 PD COPIES LTTR ENCL 1      1
                                                  'D     RECIPIENT CODE/NAME GLEAVES,W COPIES LTTR ENCL 1     1 R
INTERNAL: AC                         1   '
1       AEOD/SPD/RRAB             1      1 FILE  CENTER              1              OC/DBA/PAD               1     1 RGN2                      1     1 EXTERNAL: LITCO BRYCE,J H                           NOAC                     1     1 NRC PDR D
0 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
        ~ '
t EJ I~
1 ~
D I lj V
]l   I 1 II
 
Florida Power & Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 July 13, 1998
~
FIPIL L-98-189 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:     St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the June 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9B07210158 980630 PDR       ADOCK 05000335 R     .               PDR an FPL Group company
 
      ~     ~
I I
I   ~ g
 
DOCKET NO               50 - 335 BATE   '7/07/98 UNIT NARK COMPLETED BY ST. LUCIE UNIT 1 J. A. ROGERS TELEPHONE               561/467/7296 REPORTING PERIOD:               JUNE 1998
: 1. Design Electrical Rating (Mwe-Net)     830
: 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH   -YTD-   CUMULATIVE
: 3. Number   of Hours Reactor Critical     720    4026.2  147552.5
: 4. Number   of Hours Generator On Line   720    3976.5  145916.7
: 5. Unit Reserve Shutdown Hours             0.0     0.0     0.0
: 6. Net Electrical Energy   (MWH)           580886 3309070 118194129


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE: COMPLETED BY TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.:     50-335 UNIT:          St. Lucie ¹1 DATE:          July 7, 1998 COMPLETED BY    J.A.ROGERS TELEPHONE:      (561) 467-7296 REPORT MONTH June 1998 Unit 1 operated at essentially full power for the entire month of June.
50-335 St.Lucie¹1 July 7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH June 1998 Unit 1 operated at essentially full power for the entire month of June.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT: DATE: COMPLETED BY TELEPHONE:
 
50-335 St.Lucie N1 July 7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH June 1998 Number Date TYPe 1 Duration (Hours)Reason 2 Method of Shutting Down Reactor3 Cause S Corrective Action to Prevent Recurrence Unit l operated at essentially full poimr for the entire month of June.1 F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method l-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET     NO.:             50-335 UNIT:                        St. Lucie N1 DATE:                        July 7, 1998 COMPLETED BY                J.A.ROGERS TELEPHONE:                  (561) 467-7296 REPORT MONTH June 1998 Number       Date TYPe   Duration       Reason     Method   of                     Cause     S Corrective 1      (Hours)          2      Shutting                                Action to Down                        Prevent Recurrence Reactor3 Unit l operated at essentially full poimr for the entire month of June.
DOCKET NO 50-389 UNIT NgvtE ST.LUCIE UNIT 2 O'ATE'7/07/98 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JUNE 1998 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours 720 0.0 4313.9 0.0 720 4343 111584.5 109954.5 0.0 6.Net Electrical Energy (MWH)610743 3692018 89958411  
1 F Forced           Reason                                                  Method S Scheduled         A - Equipment Failure (Explain)                       l - Manual B - Maintenance or Test                                 2 - Manual Scram C - Refueling                                         3 - Automatic Scram D - Regulatory Restriction                             4 - Continued E - Operator Training 4 License Examination           5 - Load Reduction F - Administrative                                     9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain)
 
DOCKET NO               50 - 389 O'ATE   '7/07/98 UNIT NgvtE COMPLETED BY ST. LUCIE UNIT 2 J. A. ROGERS TELEPHONE               561/467/7296 REPORTING PERIOD:               JUNE 1998
: 1. Design Electrical Rating (Mwe-Net)     830
: 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH   -YTD-   CUMULATIVE
: 3. Number   of Hours Reactor Critical       720  4343      111584.5
: 4. Number   of Hours Generator On Line     720  4313.9    109954.5
: 5. Unit Reserve Shutdown Hours             0.0   0.0       0.0
: 6. Net Electrical Energy   (MWH)           610743 3692018   89958411


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.:     50-389 UNIT:          St. Lucie ¹2 DATE            July 7, 1998 COMPLETED BY:  J.A.ROGERS TELEPHONE:      (561) 467-7296 REPORT MONTH June 1998 Unit 2 operated at essentially full power for the entire month of June.
50-389 St.Lucie¹2 July 7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH June 1998 Unit 2 operated at essentially full power for the entire month of June.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS
 
'r~DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
                                                                                                                                                      '
50-389 St.Lucie$2 July 7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH June 1998 Number Date TYPe 1 Duration (Hours)Reason 2 Method of Shutting Down Reactor3 Cause 6 Corrective Action to Prevent Recurrence Unit 2 operated at essentially full power for the entire month of June.1 F Forced S Scheduled 2 Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training (License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)0115$  
r    ~
)~Y}}
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET     NO.:             50-389 UNIT:                        St. Lucie $ 2 DATE:                        July 7, 1998 COMPLETED BY:                J.A.ROGERS TELEPHONE:                  (561) 467-7296 REPORT MONTH June 1998 Number       Date TYPe   Duration     Reason     Method   of                       Cause 6       Corrective 1    (Hours)        2        Shutting                                Action to Down                          Prevent Recurrence Reactor3 Unit 2 operated at essentially full power for the entire month of June.
1                   2                                                    3 F Forced           Reason                                                 Method A - Equipment                                           1 - Manual S Scheduled
                          - MaintenanceFailure (Explain) 2 - Manual Scram B
C - Refueling or Test                                   3 - Automatic Scram D - Regulatory Restriction                             4 - Continued E - Operator Training ( License Examination           5 - Load Reduction F - Administrative                                     9 - Other (Explain)
G - Operational Error (Explain)
H - Other (Explain) 0115$
 
)
  ~ Y}}

Revision as of 20:48, 29 October 2019

Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr
ML17229A798
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/30/1998
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-189, NUDOCS 9807210158
Download: ML17229A798 (11)


Text

i

~ CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIO 'YSTEM (RIDS)

ACCESSION NBR:9807210158 DOC.DATE: 98/06/30 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co. 05000335 50-'389 St. Lucie Plant, Unit 2, Florida Power &. Light Co. 05000389 AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

STALL,J.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1998 for St Lucie,Units 1 &

2.W/980713 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

ID RECIPIENT CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1

'D RECIPIENT CODE/NAME GLEAVES,W COPIES LTTR ENCL 1 1 R

INTERNAL: AC 1 '

1 AEOD/SPD/RRAB 1 1 FILE CENTER 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H NOAC 1 1 NRC PDR D

0 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~ '

t EJ I~

1 ~

D I lj V

]l I 1 II

Florida Power & Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 July 13, 1998

~

FIPIL L-98-189 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the June 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9B07210158 980630 PDR ADOCK 05000335 R . PDR an FPL Group company

~ ~

I I

I ~ g

DOCKET NO 50 - 335 BATE '7/07/98 UNIT NARK COMPLETED BY ST. LUCIE UNIT 1 J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JUNE 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 720 4026.2 147552.5
4. Number of Hours Generator On Line 720 3976.5 145916.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 580886 3309070 118194129

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: July 7, 1998 COMPLETED BY J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH June 1998 Unit 1 operated at essentially full power for the entire month of June.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie N1 DATE: July 7, 1998 COMPLETED BY J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH June 1998 Number Date TYPe Duration Reason Method of Cause S Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit l operated at essentially full poimr for the entire month of June.

1 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) l - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training 4 License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO 50 - 389 O'ATE '7/07/98 UNIT NgvtE COMPLETED BY ST. LUCIE UNIT 2 J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JUNE 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 720 4343 111584.5
4. Number of Hours Generator On Line 720 4313.9 109954.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 610743 3692018 89958411

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE July 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH June 1998 Unit 2 operated at essentially full power for the entire month of June.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

'

r ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie $ 2 DATE: July 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH June 1998 Number Date TYPe Duration Reason Method of Cause 6 Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full power for the entire month of June.

1 2 3 F Forced Reason Method A - Equipment 1 - Manual S Scheduled

- MaintenanceFailure (Explain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training ( License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 0115$

)