{{#Wiki_filter:4.'AC'CELERATED D1OR1E1UT1ON DEMO.'i TTIOY SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)ACCESSION NBR:8904270201 DOC.DATE: 89/04/18 NOTARIZED:
{{#Wiki_filter:4
NO FAClL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME AUTHOR AFFILIATION FOX,C.H.Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
  .'AC'CELERATED           D1OR1E1UT1ON           DEMO.'i   TTIOY           SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:8904270201           DOC.DATE:   89/04/18   NOTARIZED: NO               DOCKET  I FAClL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee                     05000260 AUTH. NAME           AUTHOR AFFILIATION FOX,C.H.             Tennessee   Valley Authority RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document         Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards Unit 2 ASME Section XI 80 month insp rept.DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: TXTLE: OR Submittal:
Forwards Unit     2 ASME   Section XI   80 month insp rept.
Inservice Inspection/Testing/Relic from AS E NOTES:1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw,L.Watson R.Pierson DOCKET I 05000260 I Co 05000260 8 RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS NRR/DEST/MEB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: EGGG BROWN,B LPDR NRC PDR NOTES'OPXES LTTR ENCL 1 0 1 1 6 6 ,1 1 1 1 1 0 1 1 1'1 1 1 1 5 5 RECIPIENT ID CODE/NAME PD AEOD/DSP/TPAB NRR/DEST/MTB 9H OC XL 01 EGGG ROCKHOLD I H NL 007 HEMMING NSIC COPIES LTTR ENCL 5 5 1 1 1 1 1 0 1 1 1 1 1 1 1 1 h HOIK'IO ALL"RIDS" RECIPXENIS:
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR               ENCL       SIZE:                   I TXTLE: OR Submittal: Inservice Inspection/Testing/Relic               from AS E Co NOTES:1 Copy each     to: S.Black,D.M.Crutchfield,B.D.Liaw,L.Watson                   05000260 8
PIZASE HELP US IO REDUCE WASTE!CONI'ACT THE DOCX3NEÃZ CotfIBDL DESK, RXM Pl-37 (EXT.20079)TO ELKBQTE KM'AME PROM DISTRIBUTION LISTS FOR DOVIMEMIS KKJ DOIN'T NEED>TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 29 W~r I~~TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 87401 5N 157B Lookout Place AP,R 18 1989 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Nashington, D.C.20555 Gentlemen:
R.Pierson RECIPIENT                               RECIPIENT            COPIES ID  CODE/NAME        LTTR ENCL        ID CODE/NAME       LTTR ENCL                h SIMMS,M                 1      0      PD                      5    5 GEARS,G                 1      1 INTERNAL: ACRS                       6      6      AEOD/DSP/TPAB            1    1 NRR/DEST/MEB 9H         ,1      1      NRR/DEST/MTB 9H          1    1 NOTES'OPXES NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB 1
In the Matter of Tennessee Valley Authority Docket No.50-260-.BRONNS FERRY NUCLEAR PLANT (BFN)UNIT 2-AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), SECTION XI, 80 MONTH INSPECTION REPORT As required by 10 CFR 50.55a(2), TVA is providing BFN's unit 2, cycle 5, NIS-1/90-day inservice inspection report, which list the examinations performed from September 18, 1984 until July 7, 1988, and completes the 80-month inspection cycle (enclosure 2).As a result of the current extended outage and the expansion of the workscope during this outage, a subsequent 120-month inspection cycle (cycle 5B inspection plan)has been established.
1 1
A second NIS-1/90-day report addressing the cycle 5B inspections will be provided to NRC, within 90 days after unit 2 restart.In addition, TVA will provide,, NRC..wi.th.a.
1 0
report of repairs and/or replacements of parts to the reactor coolant pressure boundary, that have occurred since the end of cycle 4.This report will be included with the 120-month NIS-1/90-day inservice inspection report.The enclosure contains a list of all commitments made in this submittal.
1 OC XL      01 1
If you have any questions, please telephone Patrick P.Carier, BFN, Site Licensing, at (205)729-3570.Very truly yours TE SE A AU HORITY Enclosure cc: See page 2.H.Fox, J., ice President and Nuclear Techn cal Director S9'0427020l 890418 PDR ADOCK 05000260 Q PDC An Equal Opportunity Employer 8~~~s/j  
1 0
~~l I 0 I' U.S.Nuclear Regulatory Commission cc (Enclosure):
1
Ms.S.C.Black, Assistant Director for Projects TVA Projects Division U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockvi lie Pike Rockville, Maryland 20852 Ms.L.J.'atson, Acting Assistant Director for Inspection Programs TVA Projects Division U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000}}
                                          '       EGGG ROCKHOLD I H       1     1 EXTERNAL: EGGG BROWN,B                1 LPDR                    1     1     NL 007 HEMMING          1     1 NRC PDR                  1     1     NSIC                    1     1 5      5 HOIK 'IO ALL "RIDS" RECIPXENIS:
PIZASE HELP US IO REDUCE WASTE! CONI'ACT THE DOCX3NEÃZ CotfIBDL DESK, RXM Pl-37 (EXT. 20079) TO ELKBQTE KM'AME PROM DISTRIBUTION LISTS FOR DOVIMEMIS KKJ DOIN'T NEED>
TOTAL NUMBER OF COPIES REQUIRED: LTTR             32   ENCL   29
 
r I W~                           ~                                         ~
TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 87401 5N 157B   Lookout Place AP,R   18   1989 U.S. Nuclear Regulatory Commission ATTN:   Document Control Desk Nashington, D.C. 20555 Gentlemen:
In the Matter of                                                       Docket No. 50-260 Tennessee  Valley Authority
        -. BRONNS FERRY NUCLEAR PLANT   (BFN) UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), SECTION   XI, 80 MONTH INSPECTION REPORT As required by 10 CFR 50.55a(2), TVA is providing BFN's unit 2, cycle 5, NIS-1/90-day inservice inspection report, which list the examinations performed from September 18, 1984 until July 7, 1988, and completes the 80-month inspection cycle (enclosure 2).
As a result of the current extended outage and the expansion of the workscope during this outage, a subsequent 120-month inspection cycle (cycle 5B inspection plan) has been established. A second NIS-1/90-day report addressing the cycle 5B inspections will be provided to NRC, within 90 days after unit 2 restart. In addition, TVA will provide,, NRC..wi.th.a. report of repairs and/or replacements of parts to the reactor coolant pressure boundary, that have occurred since the end of cycle 4. This report will be included with the 120-month NIS-1/90-day inservice inspection report.
The enclosure contains   a list of all   commitments made in     this submittal.
If you have any questions, please telephone Patrick P. Carier,         BFN, Site Licensing, at (205) 729-3570.
Very   truly yours TE       SE A     AU HORITY
                                                                  . H. Fox, J ., ice President and Nuclear Techn cal Director Enclosure cc: See page    2 S9'0427020l       890418 PDR       ADOCK   05000260 Q                     PDC 8~~~
An Equal Opportunity Employer                           s/j
 
l
    ~ ~I 0
I'
 
U.S. Nuclear Regulatory Commission cc (Enclosure):
Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockvi lie Pike Rockville, Maryland 20852 Ms. L. J.'atson, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000}}

Latest revision as of 00:46, 22 October 2019

Forwards Unit 2 ASME Section XI 80 Month Insp Rept,Listing Exams Performed from 840918 to 880707.Second 90-day Rept Addressing Cycle 5B Insps Will Be Provided to NRC within 90 Days After Unit 2 Restart
ML18033A721
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/18/1989
From: Fox C
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8904270201
Download: ML18033A721 (4)


Text

4

.'AC'CELERATED D1OR1E1UT1ON DEMO.'i TTIOY SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)

ACCESSION NBR:8904270201 DOC.DATE: 89/04/18 NOTARIZED: NO DOCKET I FAClL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH. NAME AUTHOR AFFILIATION FOX,C.H. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Unit 2 ASME Section XI 80 month insp rept.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: I TXTLE: OR Submittal: Inservice Inspection/Testing/Relic from AS E Co NOTES:1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw,L.Watson 05000260 8

R.Pierson RECIPIENT RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL h SIMMS,M 1 0 PD 5 5 GEARS,G 1 1 INTERNAL: ACRS 6 6 AEOD/DSP/TPAB 1 1 NRR/DEST/MEB 9H ,1 1 NRR/DEST/MTB 9H 1 1 NOTES'OPXES NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB 1

1 1

1 0

1 OC XL 01 1

1 0

1

' EGGG ROCKHOLD I H 1 1 EXTERNAL: EGGG BROWN,B 1 LPDR 1 1 NL 007 HEMMING 1 1 NRC PDR 1 1 NSIC 1 1 5 5 HOIK 'IO ALL "RIDS" RECIPXENIS:

PIZASE HELP US IO REDUCE WASTE! CONI'ACT THE DOCX3NEÃZ CotfIBDL DESK, RXM Pl-37 (EXT. 20079) TO ELKBQTE KM'AME PROM DISTRIBUTION LISTS FOR DOVIMEMIS KKJ DOIN'T NEED>

TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 29

r I W~ ~ ~

TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 87401 5N 157B Lookout Place AP,R 18 1989 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Nashington, D.C. 20555 Gentlemen:

In the Matter of Docket No. 50-260 Tennessee Valley Authority

-. BRONNS FERRY NUCLEAR PLANT (BFN) UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), SECTION XI, 80 MONTH INSPECTION REPORT As required by 10 CFR 50.55a(2), TVA is providing BFN's unit 2, cycle 5, NIS-1/90-day inservice inspection report, which list the examinations performed from September 18, 1984 until July 7, 1988, and completes the 80-month inspection cycle (enclosure 2).

As a result of the current extended outage and the expansion of the workscope during this outage, a subsequent 120-month inspection cycle (cycle 5B inspection plan) has been established. A second NIS-1/90-day report addressing the cycle 5B inspections will be provided to NRC, within 90 days after unit 2 restart. In addition, TVA will provide,, NRC..wi.th.a. report of repairs and/or replacements of parts to the reactor coolant pressure boundary, that have occurred since the end of cycle 4. This report will be included with the 120-month NIS-1/90-day inservice inspection report.

The enclosure contains a list of all commitments made in this submittal.

If you have any questions, please telephone Patrick P. Carier, BFN, Site Licensing, at (205) 729-3570.

Very truly yours TE SE A AU HORITY

. H. Fox, J ., ice President and Nuclear Techn cal Director Enclosure cc: See page 2 S9'0427020l 890418 PDR ADOCK 05000260 Q PDC 8~~~

An Equal Opportunity Employer s/j

l

~ ~I 0

I'

U.S. Nuclear Regulatory Commission cc (Enclosure):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockvi lie Pike Rockville, Maryland 20852 Ms. L. J.'atson, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000