ML17332A254: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/31/1994
| issue date = 07/31/1994
| title = Monthly Operating Rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 Ltr
| title = Monthly Operating Rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 Ltr
| author name = BLIND A A, JANISSE J D
| author name = Blind A, Janisse J
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  

Revision as of 15:04, 18 June 2019

Monthly Operating Rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 Ltr
ML17332A254
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1994
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9408220059
Download: ML17332A254 (9)


Text

ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)ACCESSION NBR:9408220059 DOC.DATE: 94/07/31 NOTARIZED:

No DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAME AUTHOR AFFXLIATION JANXSSE,J.D.

Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele P BLXND,A;A.

Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Jul 1994 for DC Cook Nuclear Plant.W/940808 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Spec~s NOTES: 0 RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DS P/TPAB NRR/DRI L/RPEB RGN3 EXTERNAL EGGG BRYCE I J~H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HXCKMAN,J RR/D-S OEAB REG FIGE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D 0 C N NOTE To ALL"RIDS" RECIPIENTS:

PLEASE HELP US To REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.504-2083)To ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 August 8, 1994 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1994 is submitted.

Respectfully,.A.Blind Plant Manager Attachment cr NRC Region III D.R.Hahn R.C.Callen S.Hamming J.G.Keppler INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick R.L.Simms W.G.Smith, Jr.S.J.Brewer D.W.Paul S.H.Steinhart J.L.Leichner J.A.Isom D.G.Turner E.A.Smarrella J.C.Krieger D.F.Krause M.E.Russo prhAQj g~4v~~8(graf 9408220059

'74073i PDR ADDCK 05000313 R PDR N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS l.Unit Name D.C.Cook Unit 1 2.Reporting Period July notes 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net HWe)1020 6.Maximum Dependable Capacity (GROSS HWe)1056 7.Maximum Dependable Capacity (Net HWe)1000 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.ower eve o ic estricte.ny et e 10.Reasons For Restrictions.

If Any: ll.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(HWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (HDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None is o.r.to ate 744.0 5088.0 744.0 2584.5 0.0 0.0 744.0 2547.1 0.0 0.0 2402696 6903109 765140 2190460 738097 2101539 100.0 50.1 100.0 50.1 99.2 41.3 97.3 , 40.5 0.0 0.0 Months (Type, Date,and UIMl.171648.0 128238.9 463.0 126155.7 321.0 370428884 120213120 115623337 74.4 74.4 67.1 65.3 5.9 Duration):

25.ut own t n o eport erio , stimate ate o tartup: 26.nits in est tatus rior to ommercia INITIAL CRITICALITY INITIAL ELECTRICITY COMHERC IAL OPERATION peration: Forcast Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)MONTH DOCKET NO.50-315 UNIT ONE DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 July DAY 94/07/01 94/07/02 94/07/03 94/07/04 94/07/05 94/07/06 94/07/07 94/07/08 94/07/09 94/07/10 94/07/11 94/07/12 94/07/13 94/07/14 94/07/15 94/07/16 AVERAGE DAILY POWER LEVEL 996 999 999 995 994 988 985 985 1004 1002 1002 999 1001 1003 1004 1000 DAY 94/07/17 94/07/18 94/07/19 94/07/20 94/07/21 94/07/22 94/07/23 94/07/24 94/07/25" 94/07/26 94/07/27 94/07/28 94/07/29 94/07/30 94/07/31 AVERAGE DAILY POWER LEVEL 995 1002 1002 990 991 988 915 988 983 985 988 996 996 993 987

DOCKET UNIT NAME: COMPLETED BY: TELEPHONE:

DATE PAGE: 50-315 D.C.Cook Unit 1 D.L.Bublick (616)465-5901 August 4, 1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES

-JULY 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 99%RTP.The unit exited this reporting period in Mode 1 at 100%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross Electrical generation for the month of July was 765140 MWH.DETAILS 7-22-94 7-23-94 2200 0300 1015 1640 Commenced reactor power reduction to 854 RTP for main turbine valve testing.Reactor power stabilized at 85~o RTP.Commenced power increase to 100%RTP.Reactor power stabilized at 1004 RTP.

A UNZT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JULY 1994 UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

Page 1 of 1 D.C COOK UNIT 1 August 4, 1994~D.L.Bublic'k (616)465-5901 DURATZON NO DATE TYPES'OURS METHOD OF SHUTTING DOWN REASON~REACTOR~LICENSEE EVENT REPORT NO.SYSTEM CODE COMPONENT CODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or~significant power reductions fron~100%RTP this month.1 F S Forced Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 1061)5 Exhibit Z: Same Source