{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511 June 30, 2015 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839
ARLINGTON, TX 76011-4511 June 30 , 2 0 15 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839 SUB J ECT:


==SUBJECT:==
==SUMMARY==
SUMMARY OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WOLF CREEK GENERATING STATION 20 PERFORMANCE
OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WO LF C REEK GENERATING STATION 20 P ERFORMANCE


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==
This refers to the public Category 3 Open House and Annual Assessment meeting conducted at the New Strawn Community Center, New Strawn, Kansas on June 24, 2015, between the NRC and your staff. Approximately seven members of the public attended and participated in this meeting. During the meeting, the participants discussed the NRC's assessment of WCNOC performance during 2015 at the Wolf Creek Generating Station.
This refers to the public Category 3 Open House and Annual Assessment meeting conducted at the New Strawn Community Center, New Strawn, Kansas on June 24, 2015, between the NRC and your staff. Approximately seven members of the public attended and participated in this meeting. During the meeting, the participants discussed the NRC's assessment o f WCNOC performance during 2015 at t he Wolf Creek Generating Station.
Specifically, NRC staff provided an overview of our inspection ac
Specifically, NRC staff provided an overview of ou r i nspection ac tivities, findings, and ov erall per formance as s essment for t he s tation. During the m eeting, y ou and y our s taff di scussed station performance during 20, and the NRC had informal i nteraction with members o f t he public and local elected officials. In accordance wit h 10 CFR 2.390 o f t he NRC's "Rules of Practice," a copy of this l etter w ill be made ava il a ble electro ni ca lly f or pub lic i ns pection i n t he NR C Public D ocumen t Room or from t he NRC's Agency wi de D ocuments Access and Management Syste m (ADAMS), accessibl e fr o m t he NRC We b sit e a t h ttp://www.nrc.gov/reading-rm/adams.h tm l. Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, /RA/ Andrew Rosebrook, Acting Branc h C hief Project Branch B Division of Reactor Projects D ocket No.:  50-482  License N o.:  NPF-42 June 30 , 2 0 15 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 SUB J ECT:
: tivities, findings, and overall performance assessment for the station.
During the meeting, you and your staff discussed station performance during 20, and the NRC had informal interaction with members of the public and local elected officials. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.h tml. Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely,
/RA/ Andrew Rosebrook, Acting Branch Chief Project Branch B Division of Reactor Projects Docket No.:  50-482  License No.:  NPF-42   


SUNSI ReviewBy: ARNon-SensitiveSensitive Publicly AvailableNon-Publicly Available OFFICE PBB: SPE PBB: BC NAME DProulx ARosebrook SIGNATURE /RA/ARosebrook for /RA/ DATE 6/30/15 6/30/15 Letter to Adam C. Heflin from Andrew Rosenbrook dated June 30, 2015
==SUMMARY==
OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WO LF CREEK GENERATING STATION 2015 PERFORMANCE


==SUBJECT:==
==Dear Mr. Heflin:==
SUMMARY OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WO LF CREEK GENERATING STATION 2015 PERFORMANCE DISTRIBUTION
This refers to the public Category 3 Open House and Annual Assessment meeting conducted at the New Strawn Community Center, New Strawn, Kansas on June 24, 2015, between the NRC and your staff. Approximately seven members of the public attended and participated in this meeting. During the meeting, the participants discussed the NRC's assessment of WCNOC performance during 2015 at the Wolf Creek Generating Station. Specifically, NRC staff provided an overview of our inspection activities, findings, and overall performance assessment for the station.
During the meeting, you and your staff discussed station performance during 2015 , and the NRC had informal interaction with members of the public and local elected officials.
In accordance wit h 10 CFR 2.390 o f t he NRC's "Rules of Practice," a copy of this l etter w ill be made ava il a ble electro ni ca lly f or pub lic i ns pection i n t he NR C Public D ocumen t Room or from t he NRC's Agency wi de D ocuments Access and Management Syste m (ADAMS), accessibl e fr o m t he NRC We b sit e a t  h ttp://www.nrc.gov/reading-rm/adams.h tm l. Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, /RA/ Andrew Rosebrook, Acting Branc h C hief Project Branch B Division of Reactor Projects D ocket No.:  50-482  License N o.:  NPF-42 DISTRIBUTION
:  See next page ADAMS ACCESSION NUMBE R:  SU N SI Re v ie w B y: AR N o n-S e n si t i v eS en s i t i v e  P ub l i c l y A vaila b l eNo n-P ub l i c l y A vaila b l e O F FICE PBB: SPE PBB: BC N A M E DProulx ARosebrook SIGNA T U RE /RA/ARosebrook for /RA/ DA T E 6/30/15 6/30/15 OFFICIAL RECORD COPY Letter to Adam C. Heflin from Andrew Rosenbrook dated June 30, 2015,  S UB J EC T:
 
==SUMMARY==
OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WO LF CREEK GENERATING STATION 2015 PERFORMANCE DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov)
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan. Lantz@nrc.gov)
DRP Deputy Director (Ryan. Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting Senior Resident Inspector (Chris
Acting Senior Resident Inspector (Chris
.Speer@nrc.gov)
.Speer@nrc.gov) Resident Inspector (Raja.Stroble@nrc.gov)
Resident Inspector (Raja.Stroble@nrc.gov)
WC Administrative Assistant (Carey.Spoon@nrc.gov
WC Administrative Assistant (Carey.Spoon@nrc.gov
) Acting Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)
) Acting Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov
) Project Engineer, DRP/B (Steven.Janicki@nrc.gov
) Project Engineer, DRP/B (Steven.Janicki@nrc.gov
Line 48: Line 49:
) Public Affairs Officer (Lara.Uselding@nrc.gov)
) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/TSS(Donald.Allen@nrc.gov)
Team Leader, DRS/TSS(Donald.Allen@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Michael.Waters.@nrc.gov)
RIV/ETA: OEDO (Michael.Waters.@nrc.gov)   Electronic Distribution via Listserv for Wolf Creek Station}}
Electronic Distribution via Listserv for Wolf Creek Station}}

Revision as of 02:05, 9 July 2018

Summary of Annual Assessment Meeting with Wolf Creek Nuclear Operating Corporation (Wcnoc) Regarding Wolf Creek Generating Station 2014 Performance
ML15182A095
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/30/2015
From: Andrew Rosebrook
NRC/RGN-IV/DRP/RPB-B
To: Heflin A C
Wolf Creek
Andrew Rosenbrook
References
Download: ML15182A095 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 June 30 , 2 0 15 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 SUB J ECT:

SUMMARY

OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WO LF C REEK GENERATING STATION 20 P ERFORMANCE

Dear Mr. Heflin:

This refers to the public Category 3 Open House and Annual Assessment meeting conducted at the New Strawn Community Center, New Strawn, Kansas on June 24, 2015, between the NRC and your staff. Approximately seven members of the public attended and participated in this meeting. During the meeting, the participants discussed the NRC's assessment o f WCNOC performance during 2015 at t he Wolf Creek Generating Station.

Specifically, NRC staff provided an overview of ou r i nspection ac tivities, findings, and ov erall per formance as s essment for t he s tation. During the m eeting, y ou and y our s taff di scussed station performance during 20, and the NRC had informal i nteraction with members o f t he public and local elected officials. In accordance wit h 10 CFR 2.390 o f t he NRC's "Rules of Practice," a copy of this l etter w ill be made ava il a ble electro ni ca lly f or pub lic i ns pection i n t he NR C Public D ocumen t Room or from t he NRC's Agency wi de D ocuments Access and Management Syste m (ADAMS), accessibl e fr o m t he NRC We b sit e a t h ttp://www.nrc.gov/reading-rm/adams.h tm l. Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, /RA/ Andrew Rosebrook, Acting Branc h C hief Project Branch B Division of Reactor Projects D ocket No.: 50-482 License N o.: NPF-42 June 30 , 2 0 15 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 SUB J ECT:

SUMMARY

OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WO LF CREEK GENERATING STATION 2015 PERFORMANCE

Dear Mr. Heflin:

This refers to the public Category 3 Open House and Annual Assessment meeting conducted at the New Strawn Community Center, New Strawn, Kansas on June 24, 2015, between the NRC and your staff. Approximately seven members of the public attended and participated in this meeting. During the meeting, the participants discussed the NRC's assessment of WCNOC performance during 2015 at the Wolf Creek Generating Station. Specifically, NRC staff provided an overview of our inspection activities, findings, and overall performance assessment for the station.

During the meeting, you and your staff discussed station performance during 2015 , and the NRC had informal interaction with members of the public and local elected officials.

In accordance wit h 10 CFR 2.390 o f t he NRC's "Rules of Practice," a copy of this l etter w ill be made ava il a ble electro ni ca lly f or pub lic i ns pection i n t he NR C Public D ocumen t Room or from t he NRC's Agency wi de D ocuments Access and Management Syste m (ADAMS), accessibl e fr o m t he NRC We b sit e a t h ttp://www.nrc.gov/reading-rm/adams.h tm l. Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, /RA/ Andrew Rosebrook, Acting Branc h C hief Project Branch B Division of Reactor Projects D ocket No.: 50-482 License N o.: NPF-42 DISTRIBUTION

See next page ADAMS ACCESSION NUMBE R: SU N SI Re v ie w B y: AR N o n-S e n si t i v eS en s i t i v e P ub l i c l y A vaila b l eNo n-P ub l i c l y A vaila b l e O F FICE PBB: SPE PBB: BC N A M E DProulx ARosebrook SIGNA T U RE /RA/ARosebrook for /RA/ DA T E 6/30/15 6/30/15 OFFICIAL RECORD COPY Letter to Adam C. Heflin from Andrew Rosenbrook dated June 30, 2015, S UB J EC T:

SUMMARY

OF ANNUAL ASSESSMENT MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) REGARDING WO LF CREEK GENERATING STATION 2015 PERFORMANCE DISTRIBUTION

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan. Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Acting Senior Resident Inspector (Chris

.Speer@nrc.gov) Resident Inspector (Raja.Stroble@nrc.gov)

WC Administrative Assistant (Carey.Spoon@nrc.gov

) Acting Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov

) Project Engineer, DRP/B (Steven.Janicki@nrc.gov

) Public Affairs Officer (Victor.Dricks@nrc.gov

) Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/TSS(Donald.Allen@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Michael.Waters.@nrc.gov) Electronic Distribution via Listserv for Wolf Creek Station