|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:.. 0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel ' *-This Event has been retracted!!! ***This Event has been retracted !!! Part 21 (PAR) . Event#, 52502 Rep Org: C&D TECHNOLOGIES, INC. Notification Date I Time: 01/20/2017 16:01 (EST) Supplier: C&D TECHNOLOGIES Event Date I Time: 11/23/2016 (EST) Last Modification: 03/20/2017 Region: 1 Docket#: City: BLUE BELL Agreement State: Yes County: License#: State: PA NRC Notified by: ARMAND LAUZON Notifications: SILAS KENNEDY R1DO HQ Ops Officer: JEFF HERRERA LADONNA R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section: GREG WERNER R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 -PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 re.ceived via email: "The purpose of this letter is to provide the NRG an interim report in general conformity to the requirements of 1 OCFR Part 21.21 (a)(2). During an internal audit in November 2016, the sampling plan for dedication of plastic jars used in 1 E battery cells was reviewed. Two lot numbers are associated with each plastic jar, a material lot number and a molding number. A material lot may encompass several molding lots. The dedication sampling plan was based on the material lot, and may not have properly sampled variations in critical characteristics generated b) molding lots. An analysis of historical data is underway to determine whether any deviations to specifications for critical characteristics may have occurred, and whether these possible deviations could represent a defect as defined by Part 21. C&D expects that this analysis will be completed by March 20, 2017. The facilities where the components have been supplied are: Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades, Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, FLCalhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley | | {{#Wiki_filter:.. 0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel ' *-This Event has been retracted!!! |
| * VP Quality and Process Engineering bmalley@cdtechno.com 0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Page2 (215) 619-7830" ***RETRACTION ON 3/20/17 AT 1602 EDT FROM ROBERT MALLEY TO DONG PARK*** The following is an excerpt of a part 21 received via email: "Based on this review the Interim. Report (NRC Log No. 2016-00-06) dated January 20, 2017 is retracted. If you have any questions or wish to discuss this matter, please contact * "Robert Malley VP Quality and Process Engi'neering bmalley@cdtechno.com (215) 619-7830" Notified R1 DO (Bickett), R2DO (Ernstes), R3DO (Orlikowski), R4DO (Drake), Part 21/50.55 Reactors group, and Part 21 Materials group. *********************************************************************************************************************************** | | ***This Event has been retracted |
| | !!! Part 21 (PAR) . Event#, 52502 Rep Org: C&D TECHNOLOGIES, INC. Notification Date I Time: 01/20/2017 16:01 (EST) Supplier: |
| | C&D TECHNOLOGIES Event Date I Time: 11/23/2016 (EST) Last Modification: |
| | 03/20/2017 Region: 1 Docket#: |
| | City: BLUE BELL Agreement State: Yes County: License#: |
| | State: PA NRC Notified by: ARMAND LAUZON Notifications: |
| | SILAS KENNEDY R1DO HQ Ops Officer: |
| | JEFF HERRERA LADONNA R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section: |
| | GREG WERNER R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 -PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 re.ceived via email: "The purpose of this letter is to provide the NRG an interim report in general conformity to the requirements of 1 OCFR Part 21.21 (a)(2). During an internal audit in November 2016, the sampling plan for dedication of plastic jars used in 1 E battery cells was reviewed. |
| | Two lot numbers are associated with each plastic jar, a material lot number and a molding number. A material lot may encompass several molding lots. The dedication sampling plan was based on the material lot, and may not have properly sampled variations in critical characteristics generated b) molding lots. An analysis of historical data is underway to determine whether any deviations to specifications for critical characteristics may have occurred, and whether these possible deviations could represent a defect as defined by Part 21. C&D expects that this analysis will be completed by March 20, 2017. The facilities where the components have been supplied are: Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades, |
| | : Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, FLCalhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley |
| | * VP Quality and Process Engineering bmalley@cdtechno.com 0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Page2 (215) 619-7830" |
| | ***RETRACTION ON 3/20/17 AT 1602 EDT FROM ROBERT MALLEY TO DONG PARK*** The following is an excerpt of a part 21 received via email: "Based on this review the Interim. |
| | Report (NRC Log No. 2016-00-06) dated January 20, 2017 is retracted. |
| | If you have any questions or wish to discuss this matter, please contact * "Robert Malley VP Quality and Process Engi'neering bmalley@cdtechno.com (215) 619-7830" Notified R1 DO (Bickett), |
| | R2DO (Ernstes), |
| | R3DO (Orlikowski), |
| | R4DO (Drake), |
| | Part 21/50.55 Reactors group, and Part 21 Materials group. *********************************************************************************************************************************** |
| C:DTECHNOLOGIES, INC. Power Solutions March 20, 2017 VIA ELECTRONIC TRANSMISSION Nuclear Regulatory Commission Operations Center hoo.hoc@nrc.gov 1400 Union Meeting Road Blue Bell, PA 19422 Phone: (215) 619-2700 Fax: (215) 619-7887 | | C:DTECHNOLOGIES, INC. Power Solutions March 20, 2017 VIA ELECTRONIC TRANSMISSION Nuclear Regulatory Commission Operations Center hoo.hoc@nrc.gov 1400 Union Meeting Road Blue Bell, PA 19422 Phone: (215) 619-2700 Fax: (215) 619-7887 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Retraction of Interim Report -Plastic Jar Dedication Sampling On January 20, 2017 C&D Technologies submitted an interim Part 21 report regarding the issue of dedication of plastic containers used in nuclear safety related battery systems. In the interim report C&D reported that an internal audit had discovered an issue with lot numbers used to perform sample selection for parts dedication. Dedication sampling and testing had been based on larger material lots vs smaller molding lots. A detailed review of plastics dedication testing has been performed by C&D. )"his review concludes that the sampling issue does not pose a substantial safety for Class 1 E products in the field. This review included analysis of field and return data (cracked jar incidence rate below 0.002% and no operability failures), confirmation that the critical characteristics of material identification and strength were properly sampled, and confirmation that the dimensional analysis that was performed from 2011 to present never resulted in the rejection of any plastic lots. Based on this review the Interim Report (NRG Log No. 2016-00-06) dated January 20, 2017 is retracted. If you have any questions or wish to discuss this matter, please contact Robert Malley VP Quality and Process Engineering bmalley@cdtechno.com (215) 619-7830 .. Armand Lauzon Jr. Chairman and Chief Executive Officer C&D Technologies Cc: D. Anderson R. Malley S. DiMauro L. Carson 'J. Anderson J. Link}} | | |
| | Retraction of Interim Report -Plastic Jar Dedication Sampling On January 20, 2017 C&D Technologies submitted an interim Part 21 report regarding the issue of dedication of plastic containers used in nuclear safety related battery systems. |
| | In the interim report C&D reported that an internal audit had discovered an issue with lot numbers used to perform sample selection for parts dedication. |
| | Dedication sampling and testing had been based on larger material lots vs smaller molding lots. A detailed review of plastics dedication testing has been performed by C&D. )"his review concludes that the sampling issue does not pose a substantial safety for Class 1 E products in the field. This review included analysis of field and return data (cracked jar incidence rate below 0.002% and no operability failures), |
| | confirmation that the critical characteristics of material identification and strength were properly |
| | : sampled, and confirmation that the dimensional analysis that was performed from 2011 to present never resulted in the rejection of any plastic lots. Based on this review the Interim Report (NRG Log No. 2016-00-06) dated January 20, 2017 is retracted. |
| | If you have any questions or wish to discuss this matter, please contact Robert Malley VP Quality and Process Engineering bmalley@cdtechno.com (215) 619-7830 .. Armand Lauzon Jr. Chairman and Chief Executive Officer C&D Technologies Cc: D. Anderson R. Malley S. DiMauro L. Carson 'J. Anderson J. Link}} |
Part 21 - Plastic Jar Dedication SamplingML17081A453 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Perry, Indian Point, Fermi, Harris, Saint Lucie, Point Beach, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Brunswick, Limerick, River Bend, Vermont Yankee, Diablo Canyon, Vogtle, Waterford, Farley, Robinson, Clinton, Cook, Fort Calhoun, FitzPatrick, LaSalle, 05000001 |
---|
Issue date: |
03/20/2017 |
---|
From: |
Lauzon A C&D Technologies |
---|
To: |
Jeffrey Herrera Office of Nuclear Reactor Regulation |
---|
References |
---|
52502 |
Download: ML17081A453 (3) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Perry, Indian Point, Fermi, Harris, Saint Lucie, Point Beach, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Brunswick, Limerick, River Bend, Vermont Yankee, Diablo Canyon, Vogtle, Waterford, Farley, Robinson, Clinton, Cook, Fort Calhoun, FitzPatrick, LaSalle, 05000001 |
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARJAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24211A0872024-07-27027 July 2024 EN 57079 Paragon Energy Solutions Final - No Active Links ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24053A3932024-02-22022 February 2024 Final Report of a Deviation or Failure to Comply - Crompton Instruments Type 077 Ammeter ML24040A1712024-02-0909 February 2024 Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l ML22098A1172022-03-29029 March 2022 Engine Systems, Inc. Report No. 10CFR21-0134, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance - (Emo Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485) ML22075A2192021-11-29029 November 2021 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0133, Rev. 0 - Swing Check Valve, P/N ESl50359 JAFP-21-0029, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2021-04-29029 April 2021 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues ML21096A1142021-04-0606 April 2021 Ametek Solidstate Controls - Updated Interim Notifcation 1CAN012101, Interim Report Concerning an Evaluation of Deviation2021-01-18018 January 2021 Interim Report Concerning an Evaluation of Deviation ML20279A5772020-11-23023 November 2020 U.S. Nuclear Regulatory Commission'S Analysis of Public Service Enterprise Group Nuclear, LLC Decommissioning Plans Update for Salem Generating Station, Hope Creek Generating Station and Peach Bottom Independent Sfsis ML20296A2762020-10-0606 October 2020 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 DCL-20-047, 10 CFR Part 21 Notification: Inadequate Dedication of Replacement Thermocouples2020-06-16016 June 2020 10 CFR Part 21 Notification: Inadequate Dedication of Replacement Thermocouples ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML20021A0452020-01-0303 January 2020 Lake Engineering Co. - Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19323C9712019-11-15015 November 2019 Interim 10 CFR 21 Report for Masoneilan Model 8005N Transducer ML19325C0942019-11-0707 November 2019 Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch ZJS1518 Final Report Per 10 CFR Part 21 ML19304B6072019-10-31031 October 2019 Written Defect Notification for GE-Hitachi Stationary Primary Contact Finger Q0114C5382P002 ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19263A6662019-09-0909 September 2019 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19261A1942019-09-0606 September 2019 Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified Employee ML19246A1022019-08-22022 August 2019 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No 10CFR21-0126, Rev 0 - Emd Fuel Injector - Cracked Spray Tip, Pin 5229250 ML19213A0252019-07-26026 July 2019 Ultra Electronics - Update to ML19155A084 10CFR21 Interim Report ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A1302019-05-31031 May 2019 Curtiss-Wright Nuclear Division - Notification Report for Potential Part 21 Update ML19155A0842019-05-31031 May 2019 Ultra Electronics - Interim Notification Per 10CFR21 ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19106A1062019-04-12012 April 2019 Ametek Solidstate Controls - Notification of Potential Defect - 10 CFR Part 21 ML19087A2522019-03-21021 March 2019 Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19078A0872019-03-0808 March 2019 Curtiss-Wright - Interim Notification Report for Potential Part 21 Update ML19008A0432019-01-0404 January 2019 Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML19029A1552018-12-27027 December 2018 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML18332A1222018-11-15015 November 2018 Curtiss-Wright - Interim Notification Report for Potential Part 21 Update ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18270A3352018-09-26026 September 2018 Interim 10 CFR 21 Report for General Electric Hitachi (GEH) Relay Contact Cartridge DJ148C6159P001 ML18263A2812018-09-20020 September 2018 (Waterford 3) - Part 21 Report of Westinghouse 7300 Circuit Card Increased Failure Rate ML18243A5112018-08-28028 August 2018 Curtiss-Wright Nuclear Division - Senasys Selector Switch P/N 910CMC-5240X, Part 21 Notification 2024-09-12 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Harris]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Diablo Canyon]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:Cook]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:05000001]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Harris]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Diablo Canyon]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:Cook]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:05000001]] </code>. Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification DCL-24-056, Part 21 Interim Report Re Emergency Diesel Generator Fuel Snubber Valve Assembly2024-05-28028 May 2024 Part 21 Interim Report Re Emergency Diesel Generator Fuel Snubber Valve Assembly ML24127A0892024-05-0202 May 2024 57079-EN57079-1 - Redline Strikethrough e-mail Re Part 21 Interim Notification of Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24057A3382024-02-25025 February 2024 EN 56993 - Fairbanks Morse ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves ML24088A1142024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator ML24057A3372024-02-25025 February 2024 56992-EN 56992 - Fairbanks Morse Defense ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24008A0692024-01-0404 January 2024 Part 21 Report No. 10CFR21-0137, Rev. 0 for Reportable Notification for an Emo Cylinder Liner with Bore Deficiency, P/N 9318833 (Component of Power Assembly P/N 40124897), S/N 20M0938 ML24002A7112023-12-28028 December 2023 Interim Part 21 Report of a Deviation or Failure to Comply - Lube Oil Scavenging and Fuel Oil Engine Driven Pump NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils RBG-48245, Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay2023-08-24024 August 2023 Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23187A4722023-06-30030 June 2023 56603-EN 56603 - Engine Systems, Inc., Report No. 10CFR21-0136, Rev. 0 Re Voltage Regulator Chassis ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23094A1252023-03-31031 March 2023 Talen Part 21 Final Notification P21-03032023-FN R0 Re Defect Identified in Automatic Transfer Switch ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23087A1292023-03-23023 March 2023 Trillium Valves USA - Part 21 Written Notification - Event Number: 56420 ML23082A1122023-03-17017 March 2023 10 CFR Part 21 Report Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003 ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 ML23060A0412023-03-0101 March 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors ML23025A2532023-01-25025 January 2023 Part 21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML23024A0292023-01-24024 January 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator ML23011A0622023-01-11011 January 2023 Written Part 21 Notification of a Defect Associated with Imi CCI Supplied Main Steam and Main Feedwater Isolation Valves 2024-09-09 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Harris]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Diablo Canyon]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:Cook]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:05000001]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Harris]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Diablo Canyon]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:Cook]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:05000001]] </code>. |
Text
.. 0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel ' *-This Event has been retracted!!!
- This Event has been retracted
!!! Part 21 (PAR) . Event#, 52502 Rep Org: C&D TECHNOLOGIES, INC. Notification Date I Time: 01/20/2017 16:01 (EST) Supplier:
C&D TECHNOLOGIES Event Date I Time: 11/23/2016 (EST) Last Modification:
03/20/2017 Region: 1 Docket#:
City: BLUE BELL Agreement State: Yes County: License#:
State: PA NRC Notified by: ARMAND LAUZON Notifications:
SILAS KENNEDY R1DO HQ Ops Officer:
JEFF HERRERA LADONNA R2DO Emergency Class: NON EMERGENCY AARON McGRAW R3DO 10 CFR Section:
GREG WERNER R4DO 21.21 (a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART 21 MATERIALS EMAIL PART 21 -PLASTIC JAR DEDICATION SAMPLING The following is an excerpt of a part 21 re.ceived via email: "The purpose of this letter is to provide the NRG an interim report in general conformity to the requirements of 1 OCFR Part 21.21 (a)(2). During an internal audit in November 2016, the sampling plan for dedication of plastic jars used in 1 E battery cells was reviewed.
Two lot numbers are associated with each plastic jar, a material lot number and a molding number. A material lot may encompass several molding lots. The dedication sampling plan was based on the material lot, and may not have properly sampled variations in critical characteristics generated b) molding lots. An analysis of historical data is underway to determine whether any deviations to specifications for critical characteristics may have occurred, and whether these possible deviations could represent a defect as defined by Part 21. C&D expects that this analysis will be completed by March 20, 2017. The facilities where the components have been supplied are: Arkansas Nuclear One, Limerick, Beaver Valley, Millstone, Braidwood, Monticello, Browns Ferry, Nine Mile Point, Byron, Oconee, Clinton, Palisades,
- Columbia, Perry, Cook, Point Beach, Cooper, Prairie Island, Crystal River, River Bend, Diablo Canyon, Robinson, Duane Arnold, Salem, Farley, Sequoyah, Fermi, St. Lucie, Fitzpatrick, Summer, FLCalhoun, Susquehanna, Grand Gulf, Three Mile Island, Harris, US Navy, Hatch, Vogtle, Hope Creek, Vermont Yankee, Indian Point, Waterford, Watts Bar, LaSalle "If you have any questions or wish to discuss this matter or this report, please contact "Robert Malley
- VP Quality and Process Engineering bmalley@cdtechno.com 0312012017 U.S. Nuclear Regulatory Commission Operations Center Event Report Page2 (215) 619-7830"
- RETRACTION ON 3/20/17 AT 1602 EDT FROM ROBERT MALLEY TO DONG PARK*** The following is an excerpt of a part 21 received via email: "Based on this review the Interim.
Report (NRC Log No. 2016-00-06) dated January 20, 2017 is retracted.
If you have any questions or wish to discuss this matter, please contact * "Robert Malley VP Quality and Process Engi'neering bmalley@cdtechno.com (215) 619-7830" Notified R1 DO (Bickett),
R2DO (Ernstes),
R3DO (Orlikowski),
R4DO (Drake),
Part 21/50.55 Reactors group, and Part 21 Materials group. ***********************************************************************************************************************************
C:DTECHNOLOGIES, INC. Power Solutions March 20, 2017 VIA ELECTRONIC TRANSMISSION Nuclear Regulatory Commission Operations Center hoo.hoc@nrc.gov 1400 Union Meeting Road Blue Bell, PA 19422 Phone: (215) 619-2700 Fax: (215) 619-7887
Subject:
Retraction of Interim Report -Plastic Jar Dedication Sampling On January 20, 2017 C&D Technologies submitted an interim Part 21 report regarding the issue of dedication of plastic containers used in nuclear safety related battery systems.
In the interim report C&D reported that an internal audit had discovered an issue with lot numbers used to perform sample selection for parts dedication.
Dedication sampling and testing had been based on larger material lots vs smaller molding lots. A detailed review of plastics dedication testing has been performed by C&D. )"his review concludes that the sampling issue does not pose a substantial safety for Class 1 E products in the field. This review included analysis of field and return data (cracked jar incidence rate below 0.002% and no operability failures),
confirmation that the critical characteristics of material identification and strength were properly
- sampled, and confirmation that the dimensional analysis that was performed from 2011 to present never resulted in the rejection of any plastic lots. Based on this review the Interim Report (NRG Log No. 2016-00-06) dated January 20, 2017 is retracted.
If you have any questions or wish to discuss this matter, please contact Robert Malley VP Quality and Process Engineering bmalley@cdtechno.com (215) 619-7830 .. Armand Lauzon Jr. Chairman and Chief Executive Officer C&D Technologies Cc: D. Anderson R. Malley S. DiMauro L. Carson 'J. Anderson J. Link