Line 13: Line 13:
| document type = Letter, Meeting Summary
| document type = Letter, Meeting Summary
| page count = 5
| page count = 5
| project = TAC:MF4019, TAC:MF4020
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001  October 7, 2015 
Mr. Edward D. Halpin Senior Vice President and  Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA  93424 SUBJECT: SUMMARY OF THE SEVERE ACCIDENTS MITIGATION ALTERNATIVES SITE AUDIT RELATED TO THE ENVIRONMENTAL REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MF4019 AND MF4020)  Dear Mr. Halpin:
On September 21-23, 2015, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC) and contractors from the Pacific Northwest National Laboratory participated in a site audit in San Luis Obispo, California, related to the severe accidents mitigation alternatives (SAMA) environmental review of the Diablo Canyon Power Plant (DCPP), Units 1 and 2, license renewal application. The primary goal of the site visit was to review documentation and gather information to ensure that the environmental requirements for license renewal, as codified in Title 10 of the Code of Federal Regulations Part 51 were met, in accordance with the issued audit plan (ML15233A518). The enclosure is a list of representatives from NRC and personnel from Pacific Gas and Electric (PG&E) and its contractors who participated in the site audit.
The audit began on September 21, 2015, with an entrance meeting to introduce participants and discuss logistics of the audit. Following the entrance meeting, the NRC environmental review team and PG&E discussed the following topics relative to the SAMA analysis:  (1) Level 1 Probabilistic Risk Assessment (PRA), (2) Level 2 model PRA, (3) external events, (4) Level 3 consequence analysis, (5) SAMA identification and screening, (6) cost-benefit analysis, and (7) consideration of potentially lower cost alternative SAMAs. 
During the exit meeting at the conclusion of the site audit, the NRC environmental review team summarized the status of the review with PG&E. Most of the team's questions identified in the audit plan or during the audit were answered through the conduct of the audit.
E. Halpin - 2 -
NRC staff is preparing requests for additional information (RAIs), which will be issued in a subsequent letter. While the NRC review team did not identify any significant environmental issues during its site audit, the environmental review of the DCPP license renewal application is ongoing, and thus, any additional information necessary to support the review would be formally requested via the RAI process.
Sincerely,        /RA/  Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323  Enclosure:
As stated
cc w/encl:  Listserv
E. Halpin - 2 -  NRC staff is preparing requests for additional information (RAIs), which will be issued in a subsequent letter. While the NRC review team did not identify any significant environmental issues during its site audit, the environmental review of the DCPP license renewal application is ongoing, and thus, any additional information necessary to support the review would be formally requested via the RAI process.
Sincerely,        /RA/  Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323  Enclosure:
As stated
cc w/encl:  Listserv
DISTRIBUTION:  See next page  ADAMS Accession No.: ML15275A094          *concurrence via email OFFICE LA:DLR* PM:RPB2:DLRBC:RPB2:DLR PM:RPB2:DLR NAME IBetts MWentzel JDanna MWentzel DATE 10/ 5 /15 10/ 6 /15 10/ 7 /15 10/ 7 /15    OFFICIAL RECORD COPY Letter from M. Wentzel to E. Halpin dated October 7, 2015  SUBJECT: SUMMARY OF THE SEVERE ACCIDENTS MITIGATION ALTERNATIVES SITE AUDIT RELATED TO THE ENVIRONMENTAL REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MF4019 AND MF4020)  DISTRIBUTION:  HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource RidsNrrPMDiabloCanyon Resource ---------------------
MWentzel JDanna RPlasse YDiaz-Sanabria SLingam CKanatas, OGC JLindell, OGC THipschman, SRI JReynoso, RI GMiller, RIV DMcIntyre, OPA LUselding, OPA WMaier, RIV AMoreno, OCA ENCLOSURE  LIST OF PARTICIPANTS  DIABLO CANYON POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW SEVERE ACCIDENTS MITIGATION ALTERNATIVES SITE AUDIT  September 21-23, 2015  PARTICIPANTS ORGANIZATION Jerry Dozier U.S. Nuclear Regulatory Commission (NRC)
Michael Wentzel NRC Bruce Schmitt Pacific Northwest National Laboratory (PNNL)
Bob Schmidt PNNL Nathan Barker Pacific Gas and Electric (PG&E) Al Bates PG&E Terry Grebel PG&E Tom Jones PG&E Dave Miklash PG&E Michelle Olsofsky PG&E John Pyo PG&E Jearl Strickland PG&E David Bidwell ERIN Engineering and Research, Inc. (ERIN)
Alex Duvall ERIN Donald MacLeod ERIN 
}}
}}

Revision as of 16:57, 21 March 2018

Summary of the Severe Accident Mitigation Alternatives Site Audit Related to the Diablo Canyon Power Plant, Units 1 and 2 License Renewal Review
ML15275A094
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/07/2015
From: Wentzel M J
License Renewal Projects Branch 2
To: Halpin E D
Pacific Gas & Electric Co
Wentzel M J, NRR/DLR,415-6459
References
DLR-15-0458, TAC MF4019, TAC MF4020, FOIA/PA-2016-0438
Download: ML15275A094 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 7, 2015

Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 SUBJECT: SUMMARY OF THE SEVERE ACCIDENTS MITIGATION ALTERNATIVES SITE AUDIT RELATED TO THE ENVIRONMENTAL REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MF4019 AND MF4020) Dear Mr. Halpin:

On September 21-23, 2015, a review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC) and contractors from the Pacific Northwest National Laboratory participated in a site audit in San Luis Obispo, California, related to the severe accidents mitigation alternatives (SAMA) environmental review of the Diablo Canyon Power Plant (DCPP), Units 1 and 2, license renewal application. The primary goal of the site visit was to review documentation and gather information to ensure that the environmental requirements for license renewal, as codified in Title 10 of the Code of Federal Regulations Part 51 were met, in accordance with the issued audit plan (ML15233A518). The enclosure is a list of representatives from NRC and personnel from Pacific Gas and Electric (PG&E) and its contractors who participated in the site audit.

The audit began on September 21, 2015, with an entrance meeting to introduce participants and discuss logistics of the audit. Following the entrance meeting, the NRC environmental review team and PG&E discussed the following topics relative to the SAMA analysis: (1) Level 1 Probabilistic Risk Assessment (PRA), (2) Level 2 model PRA, (3) external events, (4) Level 3 consequence analysis, (5) SAMA identification and screening, (6) cost-benefit analysis, and (7) consideration of potentially lower cost alternative SAMAs.

During the exit meeting at the conclusion of the site audit, the NRC environmental review team summarized the status of the review with PG&E. Most of the team's questions identified in the audit plan or during the audit were answered through the conduct of the audit.

E. Halpin - 2 -

NRC staff is preparing requests for additional information (RAIs), which will be issued in a subsequent letter. While the NRC review team did not identify any significant environmental issues during its site audit, the environmental review of the DCPP license renewal application is ongoing, and thus, any additional information necessary to support the review would be formally requested via the RAI process.

Sincerely, /RA/ Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 Enclosure:

As stated

cc w/encl: Listserv

E. Halpin - 2 - NRC staff is preparing requests for additional information (RAIs), which will be issued in a subsequent letter. While the NRC review team did not identify any significant environmental issues during its site audit, the environmental review of the DCPP license renewal application is ongoing, and thus, any additional information necessary to support the review would be formally requested via the RAI process.

Sincerely, /RA/ Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 Enclosure:

As stated

cc w/encl: Listserv

DISTRIBUTION: See next page ADAMS Accession No.: ML15275A094 *concurrence via email OFFICE LA:DLR* PM:RPB2:DLRBC:RPB2:DLR PM:RPB2:DLR NAME IBetts MWentzel JDanna MWentzel DATE 10/ 5 /15 10/ 6 /15 10/ 7 /15 10/ 7 /15 OFFICIAL RECORD COPY Letter from M. Wentzel to E. Halpin dated October 7, 2015 SUBJECT: SUMMARY OF THE SEVERE ACCIDENTS MITIGATION ALTERNATIVES SITE AUDIT RELATED TO THE ENVIRONMENTAL REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MF4019 AND MF4020) DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource RidsNrrPMDiabloCanyon Resource ---------------------

MWentzel JDanna RPlasse YDiaz-Sanabria SLingam CKanatas, OGC JLindell, OGC THipschman, SRI JReynoso, RI GMiller, RIV DMcIntyre, OPA LUselding, OPA WMaier, RIV AMoreno, OCA ENCLOSURE LIST OF PARTICIPANTS DIABLO CANYON POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW SEVERE ACCIDENTS MITIGATION ALTERNATIVES SITE AUDIT September 21-23, 2015 PARTICIPANTS ORGANIZATION Jerry Dozier U.S. Nuclear Regulatory Commission (NRC)

Michael Wentzel NRC Bruce Schmitt Pacific Northwest National Laboratory (PNNL)

Bob Schmidt PNNL Nathan Barker Pacific Gas and Electric (PG&E) Al Bates PG&E Terry Grebel PG&E Tom Jones PG&E Dave Miklash PG&E Michelle Olsofsky PG&E John Pyo PG&E Jearl Strickland PG&E David Bidwell ERIN Engineering and Research, Inc. (ERIN)

Alex Duvall ERIN Donald MacLeod ERIN