– Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information
ML23352A234
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/18/2023
From: Vincent Gaddy
NRC/RGN-IV/DORS/EB1
To: Gerfen P
Pacific Gas & Electric Co
References
IR 2024014
Download: ML23352A234 (8)


See also: IR 05000275/2024014

Text

December 18, 2023

Paula A. Gerfen, Senior Vice President

Generation and Chief Nuclear Officer

Pacific Gas and Electric Company

P.O. Box 56

Mail Code 104/6

Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF AGE-

RELATED DEGRADATION INSPECTION (05000275/2024014 AND

05000323/2024014) AND REQUEST FOR INFORMATION

Dear Paula Gerfen:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the age-related degradation baseline inspection at Diablo Canyon, beginning

on June 10, 2024. The inspection team will be led by Dustin Reinert from the NRC Region 4

Office. The team will be composed of three personnel from the NRC Region 4 Office. The

inspection will be conducted in accordance with NRC inspection procedure (IP) 71111.21N.04.

The inspection will include an onsite information gathering visit by the team lead and two weeks

of onsite inspection by the team. The schedule for the inspection is as follows:

Onsite Information Gathering Visit: March 4-7, 2024

Offsite Preparation Week: June 3-7, 2024

Onsite Inspection Weeks: June 10-14, 2024, and June 24-27, 2024

The purpose of the information gathering visit is to become familiar with the station

maintenance, surveillance, testing, inspection, and condition monitoring programs, become

familiar with plant layout, support identification of structures, systems, and components (SSCs)

that will be reviewed during the inspection, and, as necessary, obtain plant specific site access

training and badging for unescorted site access. An initial list of documents that the team will

review during the information gathering visit are listed in enclosure 1.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location; specific documents requested to be made

available to the team in their office spaces; arrangements for reactor site access (including

radiation protection training, security, safety, and fitness for duty requirements); and the

availability of knowledgeable plant staff and licensing organization personnel to serve as points

of contact during the inspection.

P. Gerfen

2

For SSCs that the inspection will review, an initial list of the documents the team will review

during the conduct of the inspection are listed in enclosure 2. (Enclosure 3 lists the team

members and their contact information.) The team leader will contact you with identified SSCs.

Also, personnel should be available at the site during the inspection who are knowledgeable

regarding maintenance, surveillance, testing, inspection, and condition monitoring programs.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC public document

room or from the publicly available records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Dustin Reinert, the team leader, in the Region 4 Office at 817-200-1534.

Sincerely,

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Signed by Gaddy, Vincent

on 12/18/23

P. Gerfen

3

Docket Nos. 05000275, 05000323

License Nos. DPR-80, DPR-82

Enclosures:

1.

Documents Requested Prior to

Information Gathering Visit

2.

Documents Requested Prior to

Inspection Preparation Week

3.

Inspection Team Contact Information

cc w/ encl: Distribution via LISTSERV

ML23352A234

X

SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

SRI:DORS/EB1

BC:DORS/EB1

NAME

DReinert

VGaddy

SIGNATURE

/RA/

/RA/

DATE

12/18/2023

12/18/2023

Enclosure 1

Enclosure 1

Documents Requested Prior to Information Gathering Visit

The documents and information requested below should generally be made available to the

inspection team for the team's use both onsite and offsite during the information gathering visit.

Electronic format is the preferred media. If electronic media is made available via an internet

based remote document management system, then the remote document access must allow

inspectors to download, save, and print the documents in the NRC's regional office. Electronic

media on compact disc or paper records (hardcopy) are acceptable. At the end of the

inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all the

listed documents. In addition, your plant-specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below.

Documents requested by February 23, 2023:

1) A list of 50.65 (a)(1) SSCs from the past 5 years

2) A list of maintenance rule functional failures from the past 5 years

3) The two most recent evaluations of maintenance effectiveness required per Title 10 CFR

50.65(a)(3)

4) Maintenance rule scoping and performance criteria document

5) List of preventative maintenance deferrals and preventative maintenance change requests in

the last 5 years

6) Equipment reliability characterization and preventative maintenance program procedures

7) A list of Title 10 CFR Part 21 Reports that were determined to be applicable to the site from

the past 5 years

8) List of corrective action documents associated with component failures, applicable corrective

action program trend codes, or keyword search of aging, age-related, wear, accelerated

wear, corrosion, abnormal wear, accelerated degradation, and abnormal degradation

from the past 5 years. Please include a short description of the issue in the system generated

listing.

9) A list of top 100 most risk-significant structures and components according to the site-specific

probabilistic risk assessment (PRA). If possible, designate the component as active or passive

in the risk ranking.

10) The most recent system health status for each plant system and the associated Plant Health

Committee (PHC) package if presented to the PHC and any applicable PHC procedure

documents.

Enclosure 2

11) Aging management programs and basis documents. Please also include any plant-specific

or industry operating experience reviews that have been used to update aging management

activities.

12) Any self-assessments or quality assurance assessments of the aging management

programs performed since January 1, 2021

13) Copy of the updated final safety analysis report, technical specifications, and technical

requirements manual, including applicable bases documents

14) List of systems (system numbers/designators and corresponding names)

Enclosure 3

Enclosure 2

Documents Requested Prior to Inspection Preparation Week

For the samples identified by the team lead, the documents and information requested below

should generally be made available to the inspection team for the team's use both onsite and

offsite during the inspection. Electronic format is the preferred media. If electronic media is

made available via an internet based remote document management system, then the remote

document access must allow inspectors to download, save, and print the documents in the

NRC's regional office. Electronic media on compact disc or paper records (hardcopy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all the

listed documents. In addition, your plant-specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below for

each sample.

Documents requested by May 28, 2024:

1) List of corrective action documents associated with each selected SSC for the last 5 years

2) Maintenance, surveillance, testing, inspection, and condition monitoring testing requirements,

acceptance criteria, and periodicities for the selected SSC samples

3) The bases documents associated with maintenance, surveillance, testing, inspection, and

condition monitoring testing requirements, acceptance criteria, and periodicities

4) The last two years of maintenance, surveillance, testing, inspection, and condition monitoring

testing results for the selected SSC samples. For periodicities greater than two years, provide

the last two test results.

5) Vendor manuals and self-imposed vendor recommendations

6) If available,

(a) Equipment reliability category/characterization (e.g., non-critical, run-to-maintenance,

etc.)

(b) Preventative maintenance templates for the maintenance strategy

(c) System design basis documents and the specific Updated Final Safety Analysis

Report section that describes the function

(d) PI&Ds and electrical one-line drawings

(e) Control circuit drawings

(f) Design/procurement specifications

(g) List of applicable modifications for the component

Enclosure 4

Enclosure 3

Inspection Team Contact Information

Dustin Reinert (Lead)

Senior Reactor Inspector

817-200-1534

Dustin.Reinert@nrc.gov

Dustin Bryen

Reactor Inspector

817-200-1078

Dustin.Bryen@nrc.gov

Jonathan Braisted