Summary of Telephone Conference Call Held Between NRC and Pg&Amp;E Concerning the RAIs Pertaining to the DCPP LRA Environmental Review
ML15310A069
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/24/2015
From: Michael Wentzel
License Renewal Projects Branch 2
To:
Pacific Gas & Electric Co
Michael Wentzel
References
TAC MF4019, TAC MF4020, FOIA/PA-2016-0438
Download: ML15310A069 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 24, 2015 LICENSEE: Pacific Gas and Electric Co.

FACILITY: Diablo Canyon Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 4, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC CO. CONCERNING THE DRAFT REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (CAC NOS. MF4019 AND MF4020)

The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Pacific Gas and Electric Co. (PG&E) held a telephone conference call on November 4, 2015, to discuss and clarify the NRC staffs request for additional information (RAI) concerning the Diablo Canyon Power Plant, Units 1 and 2, license renewal application environmental review. The draft RAI was transmitted to PG&E by email dated October 21, 2015.

The following draft RAIs were discussed during the call:

SSH-13(g) - PG&E stated that the document requested in draft RAI SSH-13(g), Observations of the gray whale migration in the vicinity of Diablo Canyon, California: 1981-1994 migrations is not available. As such, the NRC staff agreed to delete the request.

SWR PG&E stated that the annual environmental reports submitted to the California Energy Commission are transmitted electronically; therefore, the correspondence requested in draft RAI SWR-1 is not available. The NRC staff agreed to delete Include associated transmittal correspondence with the CEC from the request.

SWR PG&E stated that the portion of the RAI requesting an evaluation of trends in the frequency of operating with two auxiliary saltwater pump trains is incorrect in that the plant does not operate with two auxiliary saltwater pumps. Rather, in accordance with Technical Specification Limiting Conditions for Operation 3.7.9, a second heat exchanger is placed in service when inlet temperature exceeds 64 degrees Fahrenheit. As such, the NRC staff modified the statement to read, As part of the response address whether there is any apparent trend in the frequency or annual hours of operation in accordance with Technical Specifications Limiting Conditions for Operation 3.7.9, Condition A.

Enclosure 1 provides a listing of the participants.

PG&E had an opportunity to comment on this summary.

/RA/

Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

As stated cc w/encl: Listserv

ML15310A069 *concurrence via email OFFICE LA:DLR* PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME IBetts MWentzel JDanna MWentzel (JDanna for MWentzel DATE 11/23/15 11/2/15 11/24/15 11/24/15

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 4, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC CO. CONCERNING THE DRAFT REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (CAC NOS. MF4019 AND MF4020)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource RidsNrrPMDiabloCanyon Resource MWentzel JDanna RPlasse DWrona SLingam CKanatas, OGC JLindell, OGC THipschman, SRI JReynoso, RI GMiller, RIV DMcIntyre, OPA LUselding, OPA WMaier, RIV AMoreno, OCA

TELEPHONE CONFERENCE CALL DIABLO CANYON POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS NOVEMBER 4, 2015 PARTICIPANTS ORGANIZATION Michael Wentzel U.S. Nuclear Regulatory Commission Terry Grebel Pacific Gas and Electric Co.

Michelle Olsofsky Pacific Gas and Electric Co.

ENCLOSURE