Summary of 9/25/13 Pre-Application Meeting to Discuss Emergency Core Cooling System Evaluations for License Amendment Request at Diablo Canyon, Units 1 and 2
ML13269A007
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/01/2013
From: Jennivine Rankin
Plant Licensing Branch IV
To:
Pacific Gas & Electric Co
Rankin J
References
TAC MF2627, TAC MF2628
Download: ML13269A007 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 O:tober 1. 2013 LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Power Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF SEPTEMBER 25,2013, PRE-APPLICATION MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY RELATED TO EMERGENCY CORE COOLING SYSTEM EVALUATIONS (TAC NOS. MF2627 AND MF2628)

On September 25, 2013, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss Emergency Core Cooling System (ECCS) evaluations including leak-before-break (LBB) assumptions used in Section 50.46 of Title 10 of the Code of Federal Regulations (10 CFR) cool able geometry evaluation for Diablo Canyon Power Plant, Unit Nos. 1 and 2 (DCPP). The meeting notice and agenda, dated September 5, 2013, are available in the Agencywide Documents Access and Management (ADAMS) at Accession No. ML13246A407. The licensee's meeting slide presentation is available at ADAMS Accession No. ML13268A002. A list of attendees is provided in the Enclosure.

The meeting was a follow-up to a December 18, 2012, public meeting on the same subject. The December 18, 2012, meeting summary is available at ADAMS Accession No. ML12355A150.

PG&E indicated that it would be providing the license amendment request (LAR) in the December 2013 time frame. PG&E described the non-conforming condition that was identified during the licensing basis verification project for DCPP. Specifically, the licensee did not perform a 10 CFR 50.59 review for a change where LBB methodology was implemented to exclude the dynamic effects of a break in the main loop piping in the fuel assembly structural analysis. The results of the fuel assembly structural analyses are used in part to demonstrate compliance with the 10 CFR 50.46(b)(4) fuel coolable geometry requirements. In addition, PG&E provided the DCPP loss-of-coolant accident (LOCA) and fuel structural qualification timeline, and summarized the proposed LAR scope and technical evaluation, The NRC suggested that PG&E consider the following during preparation of the proposed LAR:

Ensure the proposed LAR includes the mechanical testing results in comparison to the analytical results. In addition, include the fuel assembly seismic and LBB LOCA loads, Ensure the proposed LAR includes the results of grid crush from large break LOCA fuel analysis for comparison purposes, Verify Information Notice 2012-09, "Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength" concerning Standard Review Plan Section 4.2 has been considered in regards to the irradiation impacts from grid strength.

- 2 Ensure that General Design Criterion 2, "Design bases for protection against natural phenomena," of Appendix A to 10 CFR Part 50 is included in the regulatory evaluation.

No Public Meeting Feedback Forms were received for this meeting.

Please direct any inquiries to me at 301-415-1530 or at Jennivine.Rankin@nrc.gov.

2P'ruL livMl/G Jennie K. Rankin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES SEPTEMBER 25, 2013, MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING DIABLO CANYON POWER PLANT. UNITS 1 AND 2 EMERGENCY CORE COOLING SYSTEM EVALUATIONS DOCKET NOS. 50-275 AND 50-323 NAME ORGANIZATION Brandy Lopez Pacific Gas and Electric Kenneth Schrader Pacific Gas and Electric Mark Sharp Pacific Gas and Electric James Andrachek Westinghouse Tim Lupoid U.S. Nuclear Regulatory Commission Chris Jackson U.S. Nuclear Regulatory Commission Paul Clifford U.S. Nuclear Regulatory Commission Ben Parks*

U.S. Nuclear Regulatory Commission Jeremy Dean U.S. Nuclear Regulatory Commission Neil O'Keefe*

U.S. Nuclear Regulatory Commission (Region IV)

John Tsao U.S. Nuclear Regulatory Commission Leonard Ward U.S. Nuclear Regulatory Commission Jennie Rankin U.S. Nuclear Regulatory Commission Sherry Lewis

  • San Luis Obispo Mothers for Peace Jane Swanson
  • San Luis Obispo Mothers for Peace Linda Seeley
  • San Luis Obispo Mothers for Peace
  • participated via telephone Enclosure

- 2 Ensure that General Design Criterion 2, "Design bases for protection against natural phenomena," of Appendix A to 10 CFR Part 50 is included in the regulatory evaluation.

No Public Meeting Feedback Forms were received for this meeting.

Please direct any inquiries to me at 301-415-1530 or at Jennivine.Rankin@nrc.qov.

IRA!

Jennie K. Rankin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC VDricks, OPA RIV LPLIV Reading TWertz, NRR RidsAcrsAcnw_MailCTR Resource WMaier, RIV RidsNrrDeEpnb Resource BParks, NRR/DSS/SRXB RidsNrrDorl Resource CJackson. NRRlDSS/SRXB RidsI'JrrDorlLpl4 Resource PClifford, NRR/DSS RidsNrrDssSnbp Resource TLupold, NRRlDElEPNB RidsNrrDssSrxb Resource JTsao, NRRlDElEPNB RidsNrrLAJBurkhardt Resource JDean, I'JRRlDSS/SNPB RidsNrrPMDiabloCanyon Resource LWard, NRRlDSS/SNPB RidsOpaMaii Resource NO'Keefe, RIV/DPRlPRB-B RidsRgn4MailCenter Resource THipschman, SRI, RIV DRich, EDO RIV ADAMS Accession Nos. Meeting Notice ML13246A407; Meeting Summary ML13269A007 Slides ML 113268A002

  • via email

~~~~~----~====------~

OFFICE NRRlDORLlLPL4/BC NRRlDORLlLPL4/PM NAME MMarkley JRankin DATE 9/30/13 10/1/13 10/1/13 OFFICIAL RECORD COpy