ML20206N788: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000348/1985008]]
{{Adams
| number = ML20206N788
| issue date = 04/14/1987
| title = Discusses Review of Util 850320 Denial of Violation Noted in Insp Repts 50-348/85-08 & 50-364/85-08.Violation Occurred as Noted in Notice of Violation Due to Reasons Presented in Encl Ltr.Ltr Withheld
| author name = Grace J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Mcdonald R
| addressee affiliation = ALABAMA POWER CO.
| docket = 05000348, 05000364
| license number =
| contact person =
| document report number = TAC-65285, TAC-65286, NUDOCS 8704210021
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000348/1985008]]
 
=Text=
{{#Wiki_filter:-
                                SAFEGUARDSAPR 141987
                                                                        INFORMATION
  Docket Nos. 50-348 and 50-364
  License Nos. NPF-2 and NPF-8
  Alabama Power Company
  ATTN:  Mr. R. P. Mcdonald
          Senior Vice President
  P. O. Box 2641
  Birmingham, AL 35291
  Gentlemen:
  SUBJECT:  NRC INSPECTION REPORT NOS. 50-348/85-08 AND 50-364/85-08
  Reference is made to your letter of March 6,1987, concerning our evaluation of
  your denial of Violation 3(B) which is documented in the above referenced
  inspection report. Your denial, dated March 20, 1985, has been extensively
  reviewed by my Safeguards staff in coordination with the NRC's Division of
  Safeguards, Office of Nuclear Materials Safety and Safeguards (ONMSS) and the
  Office of the Executive Legal Director (OELD). Certain unavoidable delays were
  incurred in our evaluation of your denial; however, the violation warranted a
  further review by the ONMSS Regulatory Effectiveness Review team which visited
  your facility in February 1986. By letter dated August 28, 1986, the Office of
  Nuclear Reactor Regulation (0NRR) furnished you the results of that visit.
  After careful review of your denial we have concluded, for the reasons presented
  in the enclosure to this letter, that the violation occurred at stated in our
  Notice of Violation. We have also concluded that your proposed corrective
  actions appear adequate as found in your October 13, 1986, correspondence in
  response to the August 28, 1986, ONRR letter.
  Should you have any questions concerning this letter, please contact us.
                                          Sincerely,
                                              -
                                                      :-        .D 3 n
                                            J. L ;j CM
                                          J. Nelson Grace
                                          Regional Administrator
  Enclosure:
  Staff Assessment of Licensee Response
    (Safeguards Information)
  cc w/ encl:  (See page 2)
                                                                            ENC 1,05URE CONTAINS
        h4210021      e7
              ADOCK050ho$4g
                                                                            SAFEGUARDS INFORMATION
        Q                                                                  UPON St?AHATION T!!!S
                          PDR                                              P!.GE 13 DC00llTFOLLCD.
                              SAFEGUARDS INFORK.                          ON                        -
                                                                        .
                                                                                  1
                                                                                .\ ! 0
                                                                                                      1 cR
                                                  _ _ _ _ _ _ _                      - - _ - - - -    -
 
"                                                                                          ._
  ,
                                  SAFEGUARDS INFORMATION
    Alabama Power Company                    2                      APR 141987
    cc w/ enc 1:
    W. O. Whitt, Executive Vice President
    J. O. Woodard, General Manager-
      Nuclear Plant
    W. G. Hairston, III, General Manager-
      Nuclear support
    J. W. McGowan, Manager-Safety Audit
      and Engineering Review
    J. K. Osterholtz, Supervisor-Safety
      Audit and Engineering Review
    bec w/ enc 1:
    IE File
    NMSS/SGPL
    NRR/DL/ SSP 8
    bec w/o enc 1:
    Document Control Desk, 016
    NRC Resident Inspector
    State of Alabama
                                                                                    o ,
            I                                                                      b
              k,
    RII              RII          /          R 1      RII      RII        RI
                                                                                      k
    Tobin:1b        DM  ire        line            HDance  OVerrelli  ' Reyes
                                    04/p/8
                                          / sto
                                            04/' r/87 04/$ /87 04/j/87
                                                                            .
                                                                            04/g/87
    04/(/87          04/G/87
    RII
          87                                                              L r        # 08
                              SAFEG''' ~ 'NFORWTl0N                        "*'*"""
}}

Latest revision as of 06:11, 6 December 2021

Discusses Review of Util 850320 Denial of Violation Noted in Insp Repts 50-348/85-08 & 50-364/85-08.Violation Occurred as Noted in Notice of Violation Due to Reasons Presented in Encl Ltr.Ltr Withheld
ML20206N788
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/14/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
TAC-65285, TAC-65286, NUDOCS 8704210021
Download: ML20206N788 (2)


See also: IR 05000348/1985008

Text

-

SAFEGUARDSAPR 141987

INFORMATION

Docket Nos. 50-348 and 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/85-08 AND 50-364/85-08

Reference is made to your letter of March 6,1987, concerning our evaluation of

your denial of Violation 3(B) which is documented in the above referenced

inspection report. Your denial, dated March 20, 1985, has been extensively

reviewed by my Safeguards staff in coordination with the NRC's Division of

Safeguards, Office of Nuclear Materials Safety and Safeguards (ONMSS) and the

Office of the Executive Legal Director (OELD). Certain unavoidable delays were

incurred in our evaluation of your denial; however, the violation warranted a

further review by the ONMSS Regulatory Effectiveness Review team which visited

your facility in February 1986. By letter dated August 28, 1986, the Office of

Nuclear Reactor Regulation (0NRR) furnished you the results of that visit.

After careful review of your denial we have concluded, for the reasons presented

in the enclosure to this letter, that the violation occurred at stated in our

Notice of Violation. We have also concluded that your proposed corrective

actions appear adequate as found in your October 13, 1986, correspondence in

response to the August 28, 1986, ONRR letter.

Should you have any questions concerning this letter, please contact us.

Sincerely,

-

- .D 3 n

J. L ;j CM

J. Nelson Grace

Regional Administrator

Enclosure:

Staff Assessment of Licensee Response

(Safeguards Information)

cc w/ encl: (See page 2)

ENC 1,05URE CONTAINS

h4210021 e7

ADOCK050ho$4g

SAFEGUARDS INFORMATION

Q UPON St?AHATION T!!!S

PDR P!.GE 13 DC00llTFOLLCD.

SAFEGUARDS INFORK. ON -

.

1

.\ ! 0

1 cR

_ _ _ _ _ _ _ - - _ - - - - -

" ._

,

SAFEGUARDS INFORMATION

Alabama Power Company 2 APR 141987

cc w/ enc 1:

W. O. Whitt, Executive Vice President

J. O. Woodard, General Manager-

Nuclear Plant

W. G. Hairston, III, General Manager-

Nuclear support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/ SSP 8

bec w/o enc 1:

Document Control Desk, 016

NRC Resident Inspector

State of Alabama

o ,

I b

k,

RII RII / R 1 RII RII RI

k

Tobin:1b DM ire line HDance OVerrelli ' Reyes

04/p/8

/ sto

04/' r/87 04/$ /87 04/j/87

.

04/g/87

04/(/87 04/G/87

RII

87 L r # 08

SAFEG ~ 'NFORWTl0N "*'*"""