ML20155H592: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:'
r.    ,                                                                              .      .,
f            '%                              g q q g.,
.      3.
              Docket Nos. 50-348, 50-364
              License Nos. NPF-2 and NPF-8
              A      ma Powe- Company
                  N:  Mr. R. P. Mcdonald
                      ' Senior Vice President-
              P. O. Box 2641
              Birmingham, AL 35291-0400
              Gentlemen:
              SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-04 AND 50-364/88-04
              The NRC Systematic Assessmant of Licensee Performance (SALP) Board has
              completed its periodic. evaluation of the performance of your Farley facility.
              This facility. was evaluated for the period August 1,1986 through March 31,
              1988. The results of the evaluation are documented in the enclosed SALP Board
              Report. This report will be discussed with you at the Farley facility on
              July 7, 1988, at 10:30 a.m.
              The performance of your Farley facility was evaluated in the functional areas
              of - plant ~ operations, radiological controls, maintenance, surveillance, fire
              protection, emergency preparedness, security, outages, training, quality
              programs and administrative controls affecting quality, licensing activities
              and engineering support.
              A high level of performance has continued at your Farley facility. There was
              an aggressive management posture towards nuclear safety. Strengths were noted
              by;the SALP. Board in the functional areas of plant operations, radiological
              -controls, fire protection, outages and licensing activities.
                                                                                    ~
              However, there were weaknesses identified in the functional areas of quality
              program and administrative controls and engineering support. These weaknesses
              were principally 'noted in areas of environment. qualification of electrical
              equipment and in vendor interface program and procurement. In addition, a
              common problem of failure to follow procedures was noted in many functional
              areas.
              Any comments you have concerning our evaluation of the performance of your
              facility should be submitted to this office within 30 days following the date
              of -our meeting at your Faricy facility. Your comments (if any), a summary of
              our July 7,1988 meeting, and my disposition of your comments will be issued as
              an appendix to the enclosed SALP Board Report.
        :8806200315 880608
          PDR- ADOCK 05000348
                                                                                                [N  : /
          o                  DCD        '
                                                                                                  -,- .,
. , _                                                                                                'Fr
 
f
    .
  s
          -                                                          WUN0419
      s
        Alabama Power Company                    2
        Should you have any questions concerning this letter, we will be glad to
        discuss them with e:u.
                                                  Sincerely,
                                                      /5
                                                  J. Nelson Grace
                                                  Regional Administrator
        E,1cl o sure :
        SALP Board Report - Farley Units 1
            and 2
        cc / encl:
              . Guthrie, Executive Vice President
            D. Woodard, General Manager -
            Nuclear Plant
        y G. Hairston, III, Vice President -
            ,N;
            '
                clear Support
        V. W. McGowan, Manager-Safety Audit
            and Engineering Review
        M ulmer, Supervisor-Safety
            Audit and Engineering Review
        bec w/ encl:
        M esident Inspector
        DRS Technical Assistant
        g Reeves, Project Manager, NRR
        State of Alabama
        RI                    RII                      RI                RII
                /I3              W)                          h;f[/          6,'/R "
        H nce:lb              DMVerrelli                L yes
                                                                        fatJPStohr
                                                        06/ k/88
        06/l /88              06/{/88                                      06///88
        RII                  RI        ,              RII
        AGib o                GJenkiis                      rnst
        06/g/88              06/[f /88                  6/'l/88
}}
}}

Latest revision as of 06:07, 17 December 2020

Forwards SALP Insp Repts 50-348/88-04 & 50-364/88-04 for 860801-880331.Weaknesses in Functional Areas of Quality Program & Administrative Controls & Engineering Support Noted.Failure to Follow Procedures Noted in Many Areas
ML20155H592
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/08/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20155H595 List:
References
NUDOCS 8806200315
Download: ML20155H592 (2)


See also: IR 05000348/1988004

Text

'

r. , . .,

f '% g q q g.,

. 3.

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

A ma Powe- Company

N: Mr. R. P. Mcdonald

' Senior Vice President-

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-04 AND 50-364/88-04

The NRC Systematic Assessmant of Licensee Performance (SALP) Board has

completed its periodic. evaluation of the performance of your Farley facility.

This facility. was evaluated for the period August 1,1986 through March 31,

1988. The results of the evaluation are documented in the enclosed SALP Board

Report. This report will be discussed with you at the Farley facility on

July 7, 1988, at 10:30 a.m.

The performance of your Farley facility was evaluated in the functional areas

of - plant ~ operations, radiological controls, maintenance, surveillance, fire

protection, emergency preparedness, security, outages, training, quality

programs and administrative controls affecting quality, licensing activities

and engineering support.

A high level of performance has continued at your Farley facility. There was

an aggressive management posture towards nuclear safety. Strengths were noted

by;the SALP. Board in the functional areas of plant operations, radiological

-controls, fire protection, outages and licensing activities.

~

However, there were weaknesses identified in the functional areas of quality

program and administrative controls and engineering support. These weaknesses

were principally 'noted in areas of environment. qualification of electrical

equipment and in vendor interface program and procurement. In addition, a

common problem of failure to follow procedures was noted in many functional

areas.

Any comments you have concerning our evaluation of the performance of your

facility should be submitted to this office within 30 days following the date

of -our meeting at your Faricy facility. Your comments (if any), a summary of

our July 7,1988 meeting, and my disposition of your comments will be issued as

an appendix to the enclosed SALP Board Report.

8806200315 880608

PDR- ADOCK 05000348

[N  : /

o DCD '

-,- .,

. , _ 'Fr

f

.

s

- WUN0419

s

Alabama Power Company 2

Should you have any questions concerning this letter, we will be glad to

discuss them with e:u.

Sincerely,

/5

J. Nelson Grace

Regional Administrator

E,1cl o sure :

SALP Board Report - Farley Units 1

and 2

cc / encl:

. Guthrie, Executive Vice President

D. Woodard, General Manager -

Nuclear Plant

y G. Hairston, III, Vice President -

,N;

'

clear Support

V. W. McGowan, Manager-Safety Audit

and Engineering Review

M ulmer, Supervisor-Safety

Audit and Engineering Review

bec w/ encl:

M esident Inspector

DRS Technical Assistant

g Reeves, Project Manager, NRR

State of Alabama

RI RII RI RII

/I3 W) h;f[/ 6,'/R "

H nce:lb DMVerrelli L yes

fatJPStohr

06/ k/88

06/l /88 06/{/88 06///88

RII RI , RII

AGib o GJenkiis rnst

06/g/88 06/[f /88 6/'l/88