Docket Nos. 50-348, 50-364
A
ma Powe- Company
N:
Mr. R. P. Mcdonald
' Senior Vice President-
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-04 AND 50-364/88-04
The NRC Systematic Assessmant of Licensee Performance (SALP) Board has
completed its periodic. evaluation of the performance of your Farley facility.
This facility. was evaluated for the period August 1,1986 through March 31,
1988. The results of the evaluation are documented in the enclosed SALP Board
Report. This report will be discussed with you at the Farley facility on
July 7, 1988, at 10:30 a.m.
The performance of your Farley facility was evaluated in the functional areas
of - plant ~ operations, radiological controls, maintenance, surveillance, fire
protection, emergency preparedness, security, outages, training, quality
programs and administrative controls affecting quality, licensing activities
and engineering support.
A high level of performance has continued at your Farley facility. There was
an aggressive management posture towards nuclear safety. Strengths were noted
by;the SALP. Board in the functional areas of plant operations, radiological
-controls, fire protection, outages and licensing activities.
~
However, there were weaknesses identified in the functional areas of quality
program and administrative controls and engineering support. These weaknesses
were principally 'noted in areas of environment. qualification of electrical
equipment and in vendor interface program and procurement.
In addition, a
common problem of failure to follow procedures was noted in many functional
areas.
Any comments you have concerning our evaluation of the performance of your
facility should be submitted to this office within 30 days following the date
of -our meeting at your Faricy facility. Your comments (if any), a summary of
our July 7,1988 meeting, and my disposition of your comments will be issued as
an appendix to the enclosed SALP Board Report.
- 8806200315 880608
[N
PDR- ADOCK 05000348
'
-,- .,
- /
o
'Fr
. , _
f
.
WUN0419
-
s
s
Alabama Power Company
2
Should you have any questions concerning this letter, we will be glad to
discuss them with e:u.
Sincerely,
/5
J. Nelson Grace
Regional Administrator
E,1cl o sure :
SALP Board Report - Farley Units 1
and 2
cc / encl:
. Guthrie, Executive Vice President
D. Woodard, General Manager -
Nuclear Plant
y G. Hairston, III, Vice President -
,N; clear Support
'
V. W. McGowan, Manager-Safety Audit
and Engineering Review
M ulmer, Supervisor-Safety
Audit and Engineering Review
bec w/ encl:
M esident Inspector
DRS Technical Assistant
g Reeves, Project Manager, NRR
State of Alabama
W)
h;f[/
6,'/R "
RI
RII
I3
RII
RI
/
fatJPStohr
H nce:lb
DMVerrelli
L yes
06/l /88
06/{/88
06/ k/88
06///88
RII
RI
RII
,
AGib o
GJenkiis
rnst
06/g/88
06/[f /88
6/'l/88