IR 05000266/1996004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20129H530
| number = ML20129H530
| issue date = 10/25/1996
| issue date = 10/25/1996
| title = Ack Receipt of 961007 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/96-04 & 50-301/96-04
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/96-04 & 50-301/96-04
| author name = Jorgensen B
| author name = Jorgensen B
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9611010092
| document report number = NUDOCS 9611010092
| title reference date = 10-07-1996
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 13:03, 21 August 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/96-04 & 50-301/96-04
ML20129H530
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/25/1996
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9611010092
Download: ML20129H530 (2)


Text

a

e

  • feuf& ZK w.0)

'

October 25, 1996 Mr. Robert Link, Vice President Nuclear Power Wisconsin Electric Power Company 231 West Michigan Street - P379 Milwaukee, WI 53201

Dear Mr. Link:

SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-266/96004; 50-301/96004(DRP))

This will acknowledge receipt of your letter dated October 7,1996, in response to our letter dated September 6,1996, transmitting a Notice of Violation associated with Inspection Report No. 50-266/96004(DRP); 50-301/96004(DRP). We have reviewed y8ur corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections. .,

Sincerely,

/s/ B. L. Jorgensen Bruce L Jorgensen, Acting Chief Reactor Projects Branch 7 Docket No. 50-266 Docket No. 50-301 To receive a copy of this document, indicate in the box 'C" = Copy w/o attach /enct T = Copy w/ attach /enci"N" = No copy 0FFICE DRP lc DRP m 14 l l NAME Kunowski/sntfu Jordett6n DATE 10/. M 96 10/ 2.f96 0FFICIAL RECORD COPY g n. naan A 66 G PDR

'

I .,

- _.. . _ _ . ._ .

__

.

__ _ . . . . _ . . _ _ _ ._

l _ _ _. c s i e * i

1 i

'

l l

l cc: S. A. Patulski, Site General Manager A. J. Cayia, Plant Manager i Virgil Kanable, Chief ,

i Boiler Section .

! Cheryl L. Parrino, Chairman, i Wisconsin Public Service  !

l Commission

! State Liaison Officer l

! i

! i

'

Distribution:  !

l Docket File SRI Point Beach i PUBLIC IE-01 OC/LFDCB l A. B. Beach B. L. Burgess 4

W. L. Axelson

! ,

, ,

l t

',

!

1

!

I i

l i <

[

1 I

i I

{

l I l

l

'

l l

}

_ .. _