ML20073D662: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~  - - . - - - - -                  -- -        -    -          -    -    --                --
I. *  ,
h: L Ccmmenwealth Ediscn C  di1400 opus Place
    =        C'      Downses Groveilllinoia 60515 '                                                                            _q TApril 22,1991
                                                                                                                                    ~
Mr. A. Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Rill Glen Ellyn,-ll 60137-
 
==Subject:==
Braidwood Station Unit 1
                              .Second Refueling Outage                                                ,
Steam Generator Inservice Inspection.Results
                                                                                                                        >,_ t NRC'DochemotSO 456
 
==Reference:==
(a) NUREG 1276, Technical Specification
 
==Dear Mr. Davls:==
=                                                                                                      1 The' steam generator eddy current surveillance BwVS 4.5.01 was completed                                    3 on April 9,1991. Braidwood Technical Specification 4.4.5.5.a states that a Special                  .
i Report of steam generator inservice inspection (ISI) results be prepared and submitted-to the commission, pursuant to specification 6.9.2 within 15 days following completion of examinations, According!y, Attachment A provides a summary of the number of .
n tubes plugged in each steam generator based on the ISI results.; Attachment B is a summary _of tubes plugged to date. This information is being provided in_accordance i                                    s with the Technical Specification. requirements.
Please direct any questions regarding this submittal to this' office. .
                                                              ~
                                                                                                                                .i
                                                            - Very Truly Yours,;              ,
                                                              &f" Allen R. Checca
                                                      ' Nuclear Licensing Administrator.
5.
t 1
Attachments al cc: R.! Pulsifer-NRR-.                                                    '
i S. Du aont-Braidwood' NRC Jocument Control Deskt I
        /scl:lD627:3                                                                                                            1 a
9104290166 910422            4 go /"L , , a
                                              'PDR- ADOCK 05000456'
                                            -Q-                    PDR-'  W          , , _ ,
                                                                                                  ,, . __ J/[j          t . q
 
ATTACMMENT A air 02 PLU3GIMS LfRT ETEAM GENERATOR A ROW          COL      IND                      LOC                                  RPC IND 10          05      dim                      3-H                                  SAI 16          07        18%                      3-H                                  MAI 17          35      '25X                      3-H                                  SAI 24          48      dis                      3-H                                  SAI 08          52        68%                      3-H                                  MAI 39          64        DI*                      3-H                                  SAI 11          108        DIa                      3-H                                  SAI 01          42        SAI                    11-H                                  SAI 43          59        43%                      AV1 46          59        46%                      AV2 18          35        NDD                      TUBE WAS MISTAKENLY PLUGGED A TOTAL 7 TUBES SHOWED AXIAL INDICATIONS AT 3-H STEAM GENERATOR R ROW          COL      IND                      LOC.                                RPC IND 46          59        42%                      AV2 41%                      AV3 12          5        TUBE PLUGGED AFTER INSTALLING CABLE DAMPENER IN ACCORDANCE WITH NRC BULLETIN 88-02 No TUBES SHOWED AXIAL INDICATIONS
 
4 ATTACMMEXT E TUBES PLUGGED            TOTAL TUBES:
STEAM GENERATOR                        THIS OUTAGE              PLUGGED TO DATE 1RC01BA                                10                                        '
1 MISPLUGGED 11 TOTAL                20 1RC01BB                                1 1 CABLE DAMPENER 2 TOTAL-                4 1RC01BC                                19                      27 1RC01BD                                4                        5 i
 
1
        .  +
ETEAM GENERATOR C R0W          COL              IND    LOC                                            RPC IND 13              10            62%    3-H                                            SAI 23              13            53%    3-H                                            SAI 32              16            37%    3-H                                            SAI 29              17            86%    3-H                                            SAI 33              19            43%    3-H                                            SAI 44              43            dim    3-H                                            SAI 46              47            dis    3-H                                            SAI 38              51            dim    3-H,                                          SAI 39              51            dim    3-H                                            SAI 39              53            dim    3-H-                                          SAI 40                53            dim    3-H                                            SAI 39                61            dis    3-H                                          SAI 39              70-          dis    3-H                                          SAI 46              70            DI*      3-H                                          SAI 23              90            din      3-H                                          SAI' 30                95          77%      3-H-                                        SAI 32                27          74%      3-H                                        heI 58%        5-H                                        SAI 28                76          60%        5-H                                        SAI 46                59          42%          AV1 A TOTAL OF 17 TUBES SHOWED AXIAL INDICATIONS AT 3-H A TOTAL OF 2 TUBES SHOWED AXIAL INDICATIONS AT 3-H ETEAM GENERATOR EL ROW                COL        IND            LOC                                    RPC IND 32                  20        59%            3-H                                  SAI 33                  25        39%            3-H                                  SAI 34                  25        dim            3-H                                  'J-H 46                  33        din              3-H                                  SAI A TOTAL OF 4 TUBES SHOWED AXIAL.I),= ?. CATIONS AT 3-H a DI IS A DISTORTED INDICATION SAI INDICATES A SINGLE AXIAL INDICATION FOUND WITH RPC MAI INDICATES MULTIPLE AXIAL INDICATIONS
___ ____ _ _ _ ____- _ _ _ -___ _ ________ ___              -_ _ - _ ___ -A}}

Latest revision as of 11:31, 20 May 2020

Forwards Results of Steam Generator Inservice Insp Performed During Second Refueling Outage,Consisting of Table Listing Tubes Plugged in Steam Generators A,B,C & D
ML20073D662
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 04/22/1991
From: Checca A
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9104290166
Download: ML20073D662 (4)


Text

~ - - . - - - - - -- - - - - - -- --

I. * ,

h: L Ccmmenwealth Ediscn C di1400 opus Place

= C' Downses Groveilllinoia 60515 ' _q TApril 22,1991

~

Mr. A. Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Rill Glen Ellyn,-ll 60137-

Subject:

Braidwood Station Unit 1

.Second Refueling Outage ,

Steam Generator Inservice Inspection.Results

>,_ t NRC'DochemotSO 456

Reference:

(a) NUREG 1276, Technical Specification

Dear Mr. Davls:

= 1 The' steam generator eddy current surveillance BwVS 4.5.01 was completed 3 on April 9,1991. Braidwood Technical Specification 4.4.5.5.a states that a Special .

i Report of steam generator inservice inspection (ISI) results be prepared and submitted-to the commission, pursuant to specification 6.9.2 within 15 days following completion of examinations, According!y, Attachment A provides a summary of the number of .

n tubes plugged in each steam generator based on the ISI results.; Attachment B is a summary _of tubes plugged to date. This information is being provided in_accordance i s with the Technical Specification. requirements.

Please direct any questions regarding this submittal to this' office. .

~

.i

- Very Truly Yours,; ,

&f" Allen R. Checca

' Nuclear Licensing Administrator.

5.

t 1

Attachments al cc: R.! Pulsifer-NRR-. '

i S. Du aont-Braidwood' NRC Jocument Control Deskt I

/scl:lD627:3 1 a

9104290166 910422 4 go /"L , , a

'PDR- ADOCK 05000456'

-Q- PDR-' W , , _ ,

,, . __ J/[j t . q

ATTACMMENT A air 02 PLU3GIMS LfRT ETEAM GENERATOR A ROW COL IND LOC RPC IND 10 05 dim 3-H SAI 16 07 18% 3-H MAI 17 35 '25X 3-H SAI 24 48 dis 3-H SAI 08 52 68% 3-H MAI 39 64 DI* 3-H SAI 11 108 DIa 3-H SAI 01 42 SAI 11-H SAI 43 59 43% AV1 46 59 46% AV2 18 35 NDD TUBE WAS MISTAKENLY PLUGGED A TOTAL 7 TUBES SHOWED AXIAL INDICATIONS AT 3-H STEAM GENERATOR R ROW COL IND LOC. RPC IND 46 59 42% AV2 41% AV3 12 5 TUBE PLUGGED AFTER INSTALLING CABLE DAMPENER IN ACCORDANCE WITH NRC BULLETIN 88-02 No TUBES SHOWED AXIAL INDICATIONS

4 ATTACMMEXT E TUBES PLUGGED TOTAL TUBES:

STEAM GENERATOR THIS OUTAGE PLUGGED TO DATE 1RC01BA 10 '

1 MISPLUGGED 11 TOTAL 20 1RC01BB 1 1 CABLE DAMPENER 2 TOTAL- 4 1RC01BC 19 27 1RC01BD 4 5 i

1

. +

ETEAM GENERATOR C R0W COL IND LOC RPC IND 13 10 62% 3-H SAI 23 13 53% 3-H SAI 32 16 37% 3-H SAI 29 17 86% 3-H SAI 33 19 43% 3-H SAI 44 43 dim 3-H SAI 46 47 dis 3-H SAI 38 51 dim 3-H, SAI 39 51 dim 3-H SAI 39 53 dim 3-H- SAI 40 53 dim 3-H SAI 39 61 dis 3-H SAI 39 70- dis 3-H SAI 46 70 DI* 3-H SAI 23 90 din 3-H SAI' 30 95 77% 3-H- SAI 32 27 74% 3-H heI 58% 5-H SAI 28 76 60% 5-H SAI 46 59 42% AV1 A TOTAL OF 17 TUBES SHOWED AXIAL INDICATIONS AT 3-H A TOTAL OF 2 TUBES SHOWED AXIAL INDICATIONS AT 3-H ETEAM GENERATOR EL ROW COL IND LOC RPC IND 32 20 59% 3-H SAI 33 25 39% 3-H SAI 34 25 dim 3-H 'J-H 46 33 din 3-H SAI A TOTAL OF 4 TUBES SHOWED AXIAL.I),= ?. CATIONS AT 3-H a DI IS A DISTORTED INDICATION SAI INDICATES A SINGLE AXIAL INDICATION FOUND WITH RPC MAI INDICATES MULTIPLE AXIAL INDICATIONS

___ ____ _ _ _ ____- _ _ _ -___ _ ________ ___ -_ _ - _ ___ -A