IR 05000341/2010011: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams|number = ML102390072}} | {{Adams | ||
| number = ML102390072 | |||
| issue date = 08/26/2010 | |||
| title = IR 05000341-10-011 (DRS) on 07/21/2010 08/06/2010 for Fermi Power Plant, Unit 2, Refueling and Other Outage Activities Inspection | |||
| author name = Hills D E | |||
| author affiliation = NRC/RGN-III/DRS/EB1 | |||
| addressee name = Davis J M | |||
| addressee affiliation = Detroit Edison | |||
| docket = 05000341 | |||
| license number = NPF-043 | |||
| contact person = | |||
| document report number = IR-10-011 | |||
| document type = Inspection Report, Letter | |||
| page count = 12 | |||
}} | |||
{{IR-Nav| site = 05000341 | year = 2010 | report number = 011 }} | {{IR-Nav| site = 05000341 | year = 2010 | report number = 011 }} | ||
Line 7: | Line 21: | ||
[[Issue date::August 26, 2010]] | [[Issue date::August 26, 2010]] | ||
Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2- 210 NOC 6400 North Dixie Highway Newport, MI 48166 | Mr. Jack Senior Vice President and | ||
Chief Nuclear Officer Detroit Edison Company Fermi 2- 210 NOC 6400 North Dixie Highway Newport, MI 48166 | |||
SUBJECT: FERMI POWER PLANT, UNIT 2 NRC INSPECTION REPORT 05000341/2010-011(DRS) | SUBJECT: FERMI POWER PLANT, UNIT 2 NRC INSPECTION REPORT 05000341/2010-011(DRS) | ||
==Dear Mr. Davis:== | ==Dear Mr. Davis:== | ||
On August 6, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Fermi Power Plant, Unit 2. The enclosed inspection report documents the inspection results, which were discussed on August 6, 2010, with you and other members of your staff. This inspection report documents a review of the control of heavy loads specific to the reactor building crane, reactor building crane support structure and reactor building superstructure conducted in conjunction with Operating Experience Smart Sample (OpESS) FY2007-03, "Crane And Heavy Lift Inspection, Supplemental Guidance for Inspection | On August 6, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Fermi Power Plant, Unit 2. The enclosed inspection report documents the inspection results, which were discussed on August 6, 2010, with you and other members of your staff. This inspection report documents a review of the control of heavy loads specific to the reactor building crane, reactor building crane support structure and reactor building superstructure conducted in conjunction with Operating Experience Smart Sample (OpESS) FY2007-03, "Crane And Heavy Lift Inspection, Supplemental Guidance for Inspection | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available | Procedure (IP) 71111.20," Revision 2. Based on the results of this inspection, no findings were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No.: 50-341 License No.: NPF-43 | David E. Hills, Chief Engineering Branch 1 | ||
Division of Reactor Safety Docket No.: 50-341 License No.: NPF-43 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Line 24: | Line 44: | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplemental Information cc w/encl: Distribution via ListServ U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-341 License No: NPF-43 Report No: 05000341/2010-011(DRS) Licensee: Detroit Edison Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Dates: July 21 through August 6, 2010 Inspectors: J. Bozga, Reactor Inspector Approved by: David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Enclosure | Supplemental Information cc w/encl: Distribution via ListServ U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-341 License No: NPF-43 Report No: 05000341/2010-011(DRS) Licensee: Detroit Edison Company Facility: | ||
Fermi Power Plant, Unit 2 Location: Newport, MI Dates: July 21 through August 6, 2010 Inspectors: J. Bozga, Reactor Inspector Approved by: David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Enclosure | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
Line 30: | Line 51: | ||
===A. NRC-Identified=== | ===A. NRC-Identified=== | ||
and Self-Revealed Findings | and Self-Revealed Findings | ||
===Cornerstone: | ===Cornerstone: Initiating Events No violations of significance were identified.=== | ||
Initiating Events No violations of significance were identified. | |||
===B. Licensee-Identified Violations=== | ===B. Licensee-Identified Violations=== | ||
No violations of significance were identified.Enclosure | |||
No violations of significance were identified.Enclosure | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
Line 59: | Line 80: | ||
=====Description:===== | =====Description:===== | ||
The inspectors reviewed Calculation No. CN-23934, "Reactor Building Crane for Enrico Fermi Atomic Power Plant No. 2 Bridge and Trolley Structural Calculations," dated March 8, 1973, Calculation No. 4.02.09, "Reactor Building Superstructure Steel Girt and Column Framing Design," Volume I, Revision A, Calculation No. DC-6019, "Assessment of the Interior Columns for the Reactor Building Steel Superstructure Including Crane Lifted Load," Volume IA, Revision 0, and Calculation No. 4.02.04, "Superstructure Roof Framing Bracing System," Volume I, Revision A. Enclosure | The inspectors reviewed Calculation No. CN-23934, "Reactor Building Crane for Enrico Fermi Atomic Power Plant No. 2 Bridge and Trolley Structural Calculations," dated March 8, 1973, Calculation No. 4.02.09, "Reactor Building Superstructure Steel Girt and Column Framing Design," Volume I, Revision A, Calculation No. DC-6019, "Assessment of the Interior Columns for the Reactor Building Steel Superstructure Including Crane Lifted Load," Volume IA, Revision 0, and Calculation No. 4.02.04, "Superstructure Roof Framing Bracing System," Volume I, Revision A. Enclosure The inspectors were concerned that the reactor building crane and reactor building crane support structure/superstructure had been evaluated using acceptance criteria that were not contained within UFSAR Table 3.8-18, Loading Combinations for Steel Structures Elastic Design. Also, inspectors were concerned that the reactor building crane and reactor building crane support structure/superstructure had not been evaluated for the applied loads that were part of the design and licensing basis load cases/load combinations specified in UFSAR Table 3.8-18, Loading Combinations for Steel Structures Elastic Design. In response to the inspectors concern, the licensee initiated corrective action program documents related to the reactor building crane and reactor building crane support structure/superstructure. The licensee entered these items into their corrective action program (CAP) as the following condition assessment and resolution documents (CARD): 1. CARD 10-22393; "NRC-ISFSI Issue Calculation Issues"; dated March 19, 2010 | ||
=== | ===2. CARD 10-22723; "NRC ISFSI Issue Need to Revise Calculation CN-23934"; dated === | ||
March 29, 2010 | |||
===3. CARD 10-22958; "NRC ISFSI Issue - Calculation 4.02.04"; dated April 6, 2010 === | |||
===4. CARD 10-22979; "NRC ISFSI Issue-Inspector's Questions About Calculations DC-6019 and 4.02.04"; dated April 7, 2010 === | |||
===5. CARD 10-22979; "NRC ISFSI Issue-Inspector's Questions About Calculations DC-6019 and 4.02.04"; dated April 7, 2010 === | |||
===6. CARD 10-22981; "NRC ISFSI Issue-Calculation CN-23934; dated April 7, 2010 === | |||
===7. CARD 10-23797; "NRC ISFSI Issue-Revise Calculation 4.02.04"; dated May 5, 2010 === | |||
===8. CARD 10-23882; "NRC ISFSI Issue-RB5 Crane Calculation"; dated May 7, 2010 === | |||
===9. CARD 10-24045; "NRC ISFSI Issue-Calculation DC-6019 Load Combinations"; dated May 14, 2010 === | |||
10. CARD 10-24166; "NRC ISFSI Issue-CMTRs used in calculation 4.02.09"; dated May 19, 2010 11. CARD 10-26275; "NRC ISFSI Issue-Clarification of Analysis in DC-6019"; dated July 24, 2010 12. CARD 10-26276; "NRC ISFSI Issue"; dated July 24, 2010 13. CARD 10-26277; "NRC ISFSI Issue-Licensing Basis for Allowable Axis Stresses in 4.02.04"; dated July 24, 2010 14. CARD 10-26278; "NRC ISFSI Issue-Stresses is DC-6019 and 4.02.09"; dated July 24, 2010 Enclosure 4 15. CARD 10-26279; "NRC ISFSI Issue-Extraction of Loads Used in 4.02.04"; dated July 24, 2010 16. CARD 10-26280; "NRC ISFSI Issue-Acceptance Criteria in Calc. 4.02.09"; dated July 24, 2010 17. CARD 10-26282; "NRC ISFSI Issue-Use of CMTRs in EDP-34473"; dated July 24, 2010 18. CARD 10-26415; "NRC ISFSI Question on Design Basis for Response Spectra used in Design Calculation DC-6019"; dated July 28, 2010 19. CARD 10-26545; "NRC Question- ISFSI-RB5 Structure Corner Column Buckling Calculation Compliance with AISC Code"; dated July 30, 2010 20. CARD 10-26548; "NRC Questions-ISFSI-RB5 Structure Corner Column Peak Critical Yield Analysis Not Evaluated as Plastic According to AISC requirements"; | |||
dated July 30, 2010 21. CARD 10-26691; "ISFSI NRC Issue - Crane Runway Girder Splice"; dated August 4, 2010 This item is being held as an unresolved item (URI 05000341/2010011-01) pending evaluation of these concerns by the licensee and subsequent inspector review and discussion with the licensee. The licensee indicated that they would provide the inspectors multiple revised analyses addressing the issues relevant to the reactor building crane, reactor building crane support structure and reactor building superstructure on September 10, 2010. | |||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
Line 69: | Line 107: | ||
==4OA6 Management Meetings== | ==4OA6 Management Meetings== | ||
===.1 Exit Meeting Summary | ===.1 Exit Meeting Summary=== | ||
Licensee personnel acknowledged the inspection results presented. The inspector asked the licensee whether any materials examined during the inspection are considered proprietary. ATTACHMENT: | The inspector presented the results of the inspection including discussing URI 05000341/2010011-01 and planned actions to resolve the related issues with Mr. M. Caragher and other members of the licensee's staff via telephone on August 6, 2010. | ||
Licensee personnel acknowledged the inspection results presented. The inspector asked the licensee whether any materials examined during the inspection are | |||
considered proprietary. ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
Licensee | Licensee | ||
: [[contact::C. Walker]], Nuclear Organizational Effectiveness Director | : [[contact::C. Walker]], Nuclear Organizational Effectiveness Director | ||
Line 85: | Line 128: | ||
: [[contact::B. Keck]], Nuclear Engineering Manager | : [[contact::B. Keck]], Nuclear Engineering Manager | ||
: [[contact::G. Abdallah]], Lead Civil Engineer | : [[contact::G. Abdallah]], Lead Civil Engineer | ||
: [[contact::E. Odar]], Consultant Nuclear Regulatory Commission | : [[contact::E. Odar]], Consultant | ||
Nuclear Regulatory Commission | |||
: [[contact::D. Hills]], Chief, Division of Reactor Safety, Engineering Branch 1 | : [[contact::D. Hills]], Chief, Division of Reactor Safety, Engineering Branch 1 | ||
: [[contact::M. Morris]], Senior Resident Inspector | : [[contact::M. Morris]], Senior Resident Inspector | ||
==LIST OF ITEMS== | ==LIST OF ITEMS== | ||
OPENED, CLOSED AND DISCUSSED | |||
===OPENED, CLOSED AND DISCUSSED=== | |||
===Opened=== | ===Opened=== | ||
: 05000341/2010011-01 URI Reactor Building Crane and Reactor Building Crane Support Structure/Superstructure Design Calculation Issue Closed and Discussed | : 05000341/2010011-01 URI Reactor Building Crane and Reactor Building Crane Support Structure/Superstructure Design Calculation Issue Closed and | ||
===Discussed=== | |||
None 1 Attachment | |||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
Line 97: | Line 146: | ||
: Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. | : Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. | ||
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | : Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. | ||
: 1R20 Outage Activities Crane and Heavy Lift Inspection (OpESS FY2007-03) Calculation No. | : 1R20 Outage Activities Crane and Heavy Lift Inspection (OpESS FY2007-03) | ||
: Calculation No. | |||
: CN-23934; "Reactor Building Crane for Enrico Fermi Atomic Power Plant No. 2 Bridge and Trolley Structural Calculations"; dated March 8, 1973 Calculation No. | : CN-23934; "Reactor Building Crane for Enrico Fermi Atomic Power Plant No. 2 Bridge and Trolley Structural Calculations"; dated March 8, 1973 Calculation No. | ||
: DC-6019; "Assessment of the Interior Columns for the Reactor Building Steel Superstructure Including Crane Lifted Load"; Volume IA, Revision 0 Calculation No. 4.02.04; "Superstructure Roof Framing Bracing System"; Volume I, Revision A Calculation No. 4.02.09; "Reactor Building Superstructure Steel Girt and Column Framing Design"; Volume I, Revision A Corrective Action Program Documents Initiated as a Result of NRC Inspection (OpESS FY2007-03) CARD 10-22393; "NRC-ISFSI Issue Calculation Issues"; dated March 19, 2010 | : DC-6019; "Assessment of the Interior Columns for the Reactor Building Steel Superstructure Including Crane Lifted Load"; Volume IA, Revision 0 Calculation No. 4.02.04; "Superstructure Roof Framing Bracing System"; Volume I, Revision A Calculation No. 4.02.09; "Reactor Building Superstructure Steel Girt and Column Framing Design"; Volume I, Revision A Corrective Action Program Documents Initiated as a Result of NRC Inspection (OpESS | ||
: FY2007-03) CARD 10-22393; "NRC-ISFSI Issue Calculation Issues"; dated March 19, 2010 | |||
: CARD 10-22430; "NRC ISFSI Issue Correct Calculation Title"; dated March 19, 2010 CARD 10-22723; "NRC ISFSI Issue Need to Revise Calculation | : CARD 10-22430; "NRC ISFSI Issue Correct Calculation Title"; dated March 19, 2010 CARD 10-22723; "NRC ISFSI Issue Need to Revise Calculation | ||
: CN-23934"; dated March 29, 2010 CARD 10-22958; "NRC ISFSI Issue - Calculation 4.02.04"; dated April 6, 2010 | : CN-23934"; dated March 29, 2010 CARD 10-22958; "NRC ISFSI Issue - Calculation 4.02.04"; dated April 6, 2010 | ||
Line 106: | Line 157: | ||
: CN-23934"; dated April 7, 2010 CARD 10-23330; "NRC ISFSI Issue-Request for Crane Bumper/Stop Calculations," dated April 20, 2010 CARD 10-23797; "NRC ISFSI Issue-Revise Calculation 4.02.04"; dated May 5, 2010 | : CN-23934"; dated April 7, 2010 CARD 10-23330; "NRC ISFSI Issue-Request for Crane Bumper/Stop Calculations," dated April 20, 2010 CARD 10-23797; "NRC ISFSI Issue-Revise Calculation 4.02.04"; dated May 5, 2010 | ||
: CARD 10-23882; "NRC ISFSI Issue-RB5 Crane Calculation"; dated May 7, 2010 CARD 10-24045; "NRC ISFSI Issue-Calculation | : CARD 10-23882; "NRC ISFSI Issue-RB5 Crane Calculation"; dated May 7, 2010 CARD 10-24045; "NRC ISFSI Issue-Calculation | ||
: DC-6019 Load Combinations"; dated May 14, 2010 CARD 10-24166; "NRC ISFSI Issue-CMTRs used in calculation 4.02.09"; dated May19, 2010 | : DC-6019 Load Combinations"; dated May 14, 2010 CARD 10-24166; "NRC ISFSI Issue-CMTRs used in calculation 4.02.09"; dated May19, 2010 | ||
: Attachment Attachment CARD 10-26275; "NRC ISFSI Issue-Clarification of Analysis in | |||
: DC-6019"; dated July 24, 2010 CARD 10-26276; "NRC ISFSI Issue"; dated July 24, 2010 CARD 10-26277; "NRC ISFSI Issue-Licensing Basis for Allowable Axis Stresses in 4.02.04"; dated July 24, 2010 CARD 10-26278; "NRC ISFSI Issue-Stresses is | : DC-6019"; dated July 24, 2010 CARD 10-26276; "NRC ISFSI Issue"; dated July 24, 2010 CARD 10-26277; "NRC ISFSI Issue-Licensing Basis for Allowable Axis Stresses in 4.02.04"; dated July 24, 2010 CARD 10-26278; "NRC ISFSI Issue-Stresses is | ||
: DC-6019 and 4.02.09"; dated July 24, 2010 CARD 10-26279; "NRC ISFSI Issue-Extraction of Loads Used in 4.02.04"; dated July 24, 2010 CARD 10-26280; "NRC ISFSI Issue-Acceptance Criteria in Calc. 4.02.09"; dated July 24, 2010 CARD 10-26282; "NRC ISFSI Issue-Use of CMTRs in | : DC-6019 and 4.02.09"; dated July 24, 2010 CARD 10-26279; "NRC ISFSI Issue-Extraction of Loads Used in 4.02.04"; dated July 24, 2010 CARD 10-26280; "NRC ISFSI Issue-Acceptance Criteria in Calc. 4.02.09"; dated July 24, 2010 CARD 10-26282; "NRC ISFSI Issue-Use of CMTRs in | ||
Line 112: | Line 164: | ||
: CARD 10-26415; "NRC ISFSI Question on Design Basis for Response Spectra used in Design Calculation | : CARD 10-26415; "NRC ISFSI Question on Design Basis for Response Spectra used in Design Calculation | ||
: DC-6019"; dated July 28, 2010 CARD 10-26545; "NRC Question - | : DC-6019"; dated July 28, 2010 CARD 10-26545; "NRC Question - | ||
: ISFSI-RB5 Structure Corner Column Buckling Calculation Compliance with AISC Code"; dated July 30, 2010 CARD 10-26548; "NRC Questions-ISFSI-RB5 Structure Corner Column Peak Critical Yield Analysis Not Evaluated as Plastic According to AISC requirements"; dated July 30, 2010 | : ISFSI-RB5 Structure Corner Column Buckling Calculation Compliance with AISC Code"; dated July 30, 2010 CARD 10-26548; "NRC Questions-ISFSI-RB5 Structure Corner Column Peak Critical Yield Analysis Not Evaluated as Plastic According to AISC requirements"; dated | ||
: July 30, 2010 | |||
: CARD 10-26691; "ISFSI NRC Issue - Crane Runway Girder Splice"; dated August 4, 2010 | : CARD 10-26691; "ISFSI NRC Issue - Crane Runway Girder Splice"; dated August 4, 2010 | ||
==LIST OF ACRONYMS== | ==LIST OF ACRONYMS== | ||
Line 124: | Line 177: | ||
: [[RPV]] [[Reactor Pressure Vessel]] | : [[RPV]] [[Reactor Pressure Vessel]] | ||
: [[SDP]] [[Significance Determination Process]] | : [[SDP]] [[Significance Determination Process]] | ||
: [[UFSAR]] [[Updated Final Safety Analysis Report URI Unresolved | : [[UFSAR]] [[Updated Final Safety Analysis Report]] | ||
URI Unresolved Issue | |||
Attachment | |||
: [[J.]] [[Davis -2- Documents Access and Management System (]] | : [[J.]] [[Davis -2- Documents Access and Management System (]] | ||
ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, | ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
/RA/ | /RA/ | ||
David | David E. Hills, Chief | ||
Engineering Branch 1 | |||
Division of Reactor Safety Docket No.: 50-341 License No.: NPF-43 Enclosure: Inspection Report 05000341/2010-011(DRS) | |||
w/Attachment: Supplemental Information cc w/encl: Distribution via ListServ | |||
: [[DISTRI]] [[BUTION]] | |||
: Susan Bagley | |||
RidsNrrDorlLpl3-1 Resource | |||
RidsNrrPMFermi2 Resource | |||
RidsNrrDirsIrib Resource Steven Reynolds | |||
Steven Orth | |||
Jared Heck | |||
Allan Barker | |||
Carole Ariano Linda Linn | |||
: [[DRPIII]] [[]] | |||
DRSIII | |||
Patricia Buckley | |||
Tammy Tomczak | |||
ROPreports Resource | |||
: [[DOCUME]] [[NT NAME: G:\DRS\Work in Progress\-FERMI 2010-011 JVB.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/encl "N" = No copy]] | |||
: [[OFFICE]] [[]] | |||
: [[RIII]] [[]] | |||
: [[RIII]] [[]] | |||
NAME JBozga:ls | |||
: [[DEH]] [[ills]] | |||
: [[DATE]] [[08/26/10 08/26/10]] | |||
: [[OFFICI]] [[AL]] | |||
: [[RECORD]] [[]] | |||
: [[COPY]] [[]] | |||
}} | }} |
Revision as of 09:44, 21 August 2018
ML102390072 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 08/26/2010 |
From: | Hills D E NRC/RGN-III/DRS/EB1 |
To: | Davis J M Detroit Edison |
References | |
IR-10-011 | |
Download: ML102390072 (12) | |
Text
August 26, 2010
Mr. Jack Senior Vice President and
Chief Nuclear Officer Detroit Edison Company Fermi 2- 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT: FERMI POWER PLANT, UNIT 2 NRC INSPECTION REPORT 05000341/2010-011(DRS)
Dear Mr. Davis:
On August 6, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Fermi Power Plant, Unit 2. The enclosed inspection report documents the inspection results, which were discussed on August 6, 2010, with you and other members of your staff. This inspection report documents a review of the control of heavy loads specific to the reactor building crane, reactor building crane support structure and reactor building superstructure conducted in conjunction with Operating Experience Smart Sample (OpESS) FY2007-03, "Crane And Heavy Lift Inspection, Supplemental Guidance for Inspection
Procedure (IP) 71111.20," Revision 2. Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
David E. Hills, Chief Engineering Branch 1
Division of Reactor Safety Docket No.: 50-341 License No.: NPF-43
Enclosure:
Inspection Report 05000341/2010-011(DRS)
w/Attachment:
Supplemental Information cc w/encl: Distribution via ListServ U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-341 License No: NPF-43 Report No: 05000341/2010-011(DRS) Licensee: Detroit Edison Company Facility:
Fermi Power Plant, Unit 2 Location: Newport, MI Dates: July 21 through August 6, 2010 Inspectors: J. Bozga, Reactor Inspector Approved by: David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
IR 05000341/2010011(DRS); 07/21/2010 - 08/06/2010; Fermi Power Plant, Unit 2; Refueling and Other Outage Activities Inspection. This report covers portions of the Refueling and Other Outage Activities Inspection Procedure. The inspection was conducted by Region III inspectors. Based on the results of this inspection, no NRC-identified findings were discovered that involved violations of NRC requirements. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
A. NRC-Identified
and Self-Revealed Findings
Cornerstone: Initiating Events No violations of significance were identified.
B. Licensee-Identified Violations
No violations of significance were identified.Enclosure
REPORT DETAILS
REACTOR SAFETY
Cornerstone:
1R20 Outage Activities
.1 Refueling Outage Activities
a. Inspection Scope
From January 13, 2010 through June 1, 2010, the inspectors inspected the Independent Spent Fuel Storage Installation (ISFSI) Control of Heavy loads portion of Inspection Procedure 60854.1 "Preoperational and Operational Testing of an Independent Spent Fuel Storage Installation." During this inspection the inspectors identified design calculation issues associated with the reactor building crane, reactor building crane support structure, and the reactor building super-structure. The ISFSI inspection remains ongoing. However, because the reactor building crane, reactor building crane support structure, and reactor building super-structure are used to lift not only ISFSI related loads but other heavy loads as well, Region III staff opted in the interim to expedite review of these issues via a separate inspection. Hence, from July 21, 2010 through August 6, 2010, the inspector reviewed the licensee's control of heavy loads program in conjunction with a portion of the NRC's Operating Experience Smart Sample (OpESS) FY2007-03, "Crane and Heavy Lift Inspection, Supplemental Guidance for IP-71111.20," Revision 2 specifically related to the removal and installation of the Reactor Pressure Vessel (RPV) head during refueling outages as well as design calculations associated with the reactor building crane, reactor building crane support structure and the reactor building super-structure. Documents reviewed during the inspection are listed in the Attachment of this report.
b. Findings
(1) Reactor Building Crane and Reactor Building Crane Support Structure/Superstructure Design Calculation Issues
Introduction:
The inspectors determined that an unresolved item (URI) existed concerning the design calculations that demonstrate the design adequacy of the reactor building crane, reactor building crane support structure and reactor building superstructure.
Description:
The inspectors reviewed Calculation No. CN-23934, "Reactor Building Crane for Enrico Fermi Atomic Power Plant No. 2 Bridge and Trolley Structural Calculations," dated March 8, 1973, Calculation No. 4.02.09, "Reactor Building Superstructure Steel Girt and Column Framing Design," Volume I, Revision A, Calculation No. DC-6019, "Assessment of the Interior Columns for the Reactor Building Steel Superstructure Including Crane Lifted Load," Volume IA, Revision 0, and Calculation No. 4.02.04, "Superstructure Roof Framing Bracing System," Volume I, Revision A. Enclosure The inspectors were concerned that the reactor building crane and reactor building crane support structure/superstructure had been evaluated using acceptance criteria that were not contained within UFSAR Table 3.8-18, Loading Combinations for Steel Structures Elastic Design. Also, inspectors were concerned that the reactor building crane and reactor building crane support structure/superstructure had not been evaluated for the applied loads that were part of the design and licensing basis load cases/load combinations specified in UFSAR Table 3.8-18, Loading Combinations for Steel Structures Elastic Design. In response to the inspectors concern, the licensee initiated corrective action program documents related to the reactor building crane and reactor building crane support structure/superstructure. The licensee entered these items into their corrective action program (CAP) as the following condition assessment and resolution documents (CARD): 1. CARD 10-22393; "NRC-ISFSI Issue Calculation Issues"; dated March 19, 2010
2. CARD 10-22723; "NRC ISFSI Issue Need to Revise Calculation CN-23934"; dated
March 29, 2010
3. CARD 10-22958; "NRC ISFSI Issue - Calculation 4.02.04"; dated April 6, 2010
4. CARD 10-22979; "NRC ISFSI Issue-Inspector's Questions About Calculations DC-6019 and 4.02.04"; dated April 7, 2010
5. CARD 10-22979; "NRC ISFSI Issue-Inspector's Questions About Calculations DC-6019 and 4.02.04"; dated April 7, 2010
6. CARD 10-22981; "NRC ISFSI Issue-Calculation CN-23934; dated April 7, 2010
7. CARD 10-23797; "NRC ISFSI Issue-Revise Calculation 4.02.04"; dated May 5, 2010
8. CARD 10-23882; "NRC ISFSI Issue-RB5 Crane Calculation"; dated May 7, 2010
9. CARD 10-24045; "NRC ISFSI Issue-Calculation DC-6019 Load Combinations"; dated May 14, 2010
10. CARD 10-24166; "NRC ISFSI Issue-CMTRs used in calculation 4.02.09"; dated May 19, 2010 11. CARD 10-26275; "NRC ISFSI Issue-Clarification of Analysis in DC-6019"; dated July 24, 2010 12. CARD 10-26276; "NRC ISFSI Issue"; dated July 24, 2010 13. CARD 10-26277; "NRC ISFSI Issue-Licensing Basis for Allowable Axis Stresses in 4.02.04"; dated July 24, 2010 14. CARD 10-26278; "NRC ISFSI Issue-Stresses is DC-6019 and 4.02.09"; dated July 24, 2010 Enclosure 4 15. CARD 10-26279; "NRC ISFSI Issue-Extraction of Loads Used in 4.02.04"; dated July 24, 2010 16. CARD 10-26280; "NRC ISFSI Issue-Acceptance Criteria in Calc. 4.02.09"; dated July 24, 2010 17. CARD 10-26282; "NRC ISFSI Issue-Use of CMTRs in EDP-34473"; dated July 24, 2010 18. CARD 10-26415; "NRC ISFSI Question on Design Basis for Response Spectra used in Design Calculation DC-6019"; dated July 28, 2010 19. CARD 10-26545; "NRC Question- ISFSI-RB5 Structure Corner Column Buckling Calculation Compliance with AISC Code"; dated July 30, 2010 20. CARD 10-26548; "NRC Questions-ISFSI-RB5 Structure Corner Column Peak Critical Yield Analysis Not Evaluated as Plastic According to AISC requirements";
dated July 30, 2010 21. CARD 10-26691; "ISFSI NRC Issue - Crane Runway Girder Splice"; dated August 4, 2010 This item is being held as an unresolved item (URI 05000341/2010011-01) pending evaluation of these concerns by the licensee and subsequent inspector review and discussion with the licensee. The licensee indicated that they would provide the inspectors multiple revised analyses addressing the issues relevant to the reactor building crane, reactor building crane support structure and reactor building superstructure on September 10, 2010.
OTHER ACTIVITIES
4OA6 Management Meetings
.1 Exit Meeting Summary
The inspector presented the results of the inspection including discussing URI 05000341/2010011-01 and planned actions to resolve the related issues with Mr. M. Caragher and other members of the licensee's staff via telephone on August 6, 2010.
Licensee personnel acknowledged the inspection results presented. The inspector asked the licensee whether any materials examined during the inspection are
considered proprietary. ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- C. Walker, Nuclear Organizational Effectiveness Director
- M. Caragher, Nuclear Engineering Director
- K. Hullum-Lawson, Nuclear Engineering Supervisor
- S. Hassoun, Nuclear Licensing Supervisor
- R. Salmon, Nuclear Compliance Supervisor
- R. Johnson, Nuclear Licensing Manager
- B. Keck, Nuclear Engineering Manager
- G. Abdallah, Lead Civil Engineer
- E. Odar, Consultant
Nuclear Regulatory Commission
- D. Hills, Chief, Division of Reactor Safety, Engineering Branch 1
- M. Morris, Senior Resident Inspector
LIST OF ITEMS
OPENED, CLOSED AND DISCUSSED
Opened
- 05000341/2010011-01 URI Reactor Building Crane and Reactor Building Crane Support Structure/Superstructure Design Calculation Issue Closed and
Discussed
None 1 Attachment
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
- Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
- 1R20 Outage Activities Crane and Heavy Lift Inspection (OpESS FY2007-03)
- Calculation No.
- CN-23934; "Reactor Building Crane for Enrico Fermi Atomic Power Plant No. 2 Bridge and Trolley Structural Calculations"; dated March 8, 1973 Calculation No.
- DC-6019; "Assessment of the Interior Columns for the Reactor Building Steel Superstructure Including Crane Lifted Load"; Volume IA, Revision 0 Calculation No. 4.02.04; "Superstructure Roof Framing Bracing System"; Volume I, Revision A Calculation No. 4.02.09; "Reactor Building Superstructure Steel Girt and Column Framing Design"; Volume I, Revision A Corrective Action Program Documents Initiated as a Result of NRC Inspection (OpESS
- FY2007-03) CARD 10-22393; "NRC-ISFSI Issue Calculation Issues"; dated March 19, 2010
- CARD 10-22430; "NRC ISFSI Issue Correct Calculation Title"; dated March 19, 2010 CARD 10-22723; "NRC ISFSI Issue Need to Revise Calculation
- CN-23934"; dated March 29, 2010 CARD 10-22958; "NRC ISFSI Issue - Calculation 4.02.04"; dated April 6, 2010
- CARD 10-22979; "NRC ISFSI Issue-Inspector's Questions about Calculations
- DC-6019 and 4.02.04"; dated April 7, 2010 CARD 10-22981; "NRC ISFSI Issue-Calculation
- CN-23934"; dated April 7, 2010 CARD 10-23330; "NRC ISFSI Issue-Request for Crane Bumper/Stop Calculations," dated April 20, 2010 CARD 10-23797; "NRC ISFSI Issue-Revise Calculation 4.02.04"; dated May 5, 2010
- CARD 10-23882; "NRC ISFSI Issue-RB5 Crane Calculation"; dated May 7, 2010 CARD 10-24045; "NRC ISFSI Issue-Calculation
- DC-6019 Load Combinations"; dated May 14, 2010 CARD 10-24166; "NRC ISFSI Issue-CMTRs used in calculation 4.02.09"; dated May19, 2010
- Attachment Attachment CARD 10-26275; "NRC ISFSI Issue-Clarification of Analysis in
- DC-6019"; dated July 24, 2010 CARD 10-26276; "NRC ISFSI Issue"; dated July 24, 2010 CARD 10-26277; "NRC ISFSI Issue-Licensing Basis for Allowable Axis Stresses in 4.02.04"; dated July 24, 2010 CARD 10-26278; "NRC ISFSI Issue-Stresses is
- DC-6019 and 4.02.09"; dated July 24, 2010 CARD 10-26279; "NRC ISFSI Issue-Extraction of Loads Used in 4.02.04"; dated July 24, 2010 CARD 10-26280; "NRC ISFSI Issue-Acceptance Criteria in Calc. 4.02.09"; dated July 24, 2010 CARD 10-26282; "NRC ISFSI Issue-Use of CMTRs in
- EDP-34473"; dated July 24, 2010
- CARD 10-26415; "NRC ISFSI Question on Design Basis for Response Spectra used in Design Calculation
- DC-6019"; dated July 28, 2010 CARD 10-26545; "NRC Question -
- ISFSI-RB5 Structure Corner Column Buckling Calculation Compliance with AISC Code"; dated July 30, 2010 CARD 10-26548; "NRC Questions-ISFSI-RB5 Structure Corner Column Peak Critical Yield Analysis Not Evaluated as Plastic According to AISC requirements"; dated
- July 30, 2010
- CARD 10-26691; "ISFSI NRC Issue - Crane Runway Girder Splice"; dated August 4, 2010
LIST OF ACRONYMS
- USED [[]]
ISFSI Independent Spent Fuel Storage Installation
OpESS Operating Experience Smart Sample
URI Unresolved Issue
Attachment
ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David E. Hills, Chief
Engineering Branch 1
Division of Reactor Safety Docket No.: 50-341 License No.: NPF-43 Enclosure: Inspection Report 05000341/2010-011(DRS)
w/Attachment: Supplemental Information cc w/encl: Distribution via ListServ
- Susan Bagley
RidsNrrDorlLpl3-1 Resource
RidsNrrPMFermi2 Resource
RidsNrrDirsIrib Resource Steven Reynolds
- DRPIII [[]]
DRSIII
Patricia Buckley
ROPreports Resource
- DOCUME [[NT NAME: G:\DRS\Work in Progress\-FERMI 2010-011 JVB.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/encl "N" = No copy]]
- OFFICE [[]]
- RIII [[]]
- RIII [[]]
NAME JBozga:ls
- RECORD [[]]
- COPY [[]]