IR 05000341/2021403
| ML21250A394 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/08/2021 |
| From: | Nestor Feliz-Adorno Reactor Projects Region 3 Branch 4 |
| To: | Peter Dietrich DTE Electric Company |
| References | |
| IR 2021403 | |
| Download: ML21250A394 (3) | |
Text
SUBJECT:
FERMI 2 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000341/2021403
Dear Mr. Dietrich:
On August 6, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi 2. On August 6, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
September 8, 2021 The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket No. 05000341 License No. NPF-43 Enclosure:
As stated cc: G. Anderson, Security Manager T. R. Wentworth, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV Signed by Feliz-Adorno, Nestor on 09/08/21
ML21250A394 Entire Report:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RIII RIII NAME RNg:ve NFélizAdorno DATE 9/8/2021 9/8/2021