– Triennial Fire Protection Inspection Report 05000341/2023011
ML23095A085
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/06/2023
From: Jasmine Gilliam
NRC/RGN-III/DORS/EB2
To: Peter Dietrich
DTE Electric Company
References
IR 2023011
Download: ML23095A085 (1)


Text

SUBJECT:

FERMI POWER PLANT, UNIT 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000341/2023011

Dear Peter Dietrich:

On March 9, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2 and discussed the results of this inspection with Eric Olson, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC identified or self-revealing findings were identified during this inspection.

A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Fermi Power Plant, Unit 2.

April 6, 2023 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jasmine A. Gilliam, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000341 License No. NPF-43

Enclosure:

As stated

Inspection Report

Docket Number:

05000341

License Number:

NPF-43

Report Number:

05000341/2023011

Enterprise Identifier:

I-2023-011-0026

Licensee:

DTE Electric Company

Facility:

Fermi Power Plant, Unit 2

Location:

Newport, MI

Inspection Dates:

February 13, 2023 to March 09, 2023

Inspectors:

M. Abuhamdan, Reactor Inspector

M. Gangewere, Reactor Inspector

I. Hafeez, Senior Reactor Inspector

Approved By:

Jasmine A. Gilliam, Acting Branch Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Fermi Power Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. A licensee-identified non-cited violation is documented in report Section: 71111.21N.0

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Suppression Pool Cooling
(2) Stand By Feed Water
(3) Fire Zone 1ABS1CAC room
(4) Fire Zone 09AB Main Control Room

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees Fire Protection Program (FPP) contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Combustible Control Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (3 Samples)

The inspectors verified the following:

a.

Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b.

The adequacy of the design modification, if applicable.

c.

Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d.

The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e.

Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) FPEE-21-0001-TR LCO 3.0.3 Evaluation for the Non-Functional Diesel Fire Pump.
(2) EVAL-DE0035-01-Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for Compliance with the Requirements of NFPA-13, Standard for the Installation of Sprinkler Systems.
(3) Update of FPEE-02-0020 for spatial and failure history of Steam Tunnel Seals.

INSPECTION RESULTS

Licensee-Identified Non-Cited Violation 71111.21N.05 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Technical Specification Section 5.4.1.a states, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. NRC Regulatory Guide 1.33, Appendix A, Section 8 addresses Procedures for Control of Measuring and Test Equipment and for Surveillance Test, Procedures, and Calibration. Section 8 b 1 (h), further specifies, in part, that fire protection system functional test inspection procedures should be written for each surveillance, test, inspection, or calibration listed in the technical specifications. TRSM Section 3.12.2.13 Surveillance Requirements, requires the licensee to verify that each fire pump develops a minimum calculated value of 2500 gpm at 150 psig at the discharge flange of the pump adjusted for the minimum allowed lake level of 562-0.

Procedure 28.504.03 is the sites implementing procedure for the TRSM 3.12.2.13 required test. Contrary to the above, between 2001 and 2021, the licensee failed to maintain a written procedure associated with Fire Suppression Water System Simulated Automatic Actuation test. Specifically, the site failed to maintain procedure 28.504.03, Fire Suppression Water System Simulated Automatic Actuation test, because licensee failed to incorporate appropriate acceptance criteria for fire pump discharge flow and pressure. 28.504.03 contained the acceptance criteria for the fire pumps to be 1825 gpm at 149 psig resulted in insufficient automatic flow and pressure to be delivered to the Emergency Diesel Generating (EDG) Fuel Oil Storage Tank (FOST) rooms for fire suppression.

Significance/Severity: Green.

Corrective Action References: CARD 23-21712 (2023 NRC Fire Protection Inspection identified-Past Fire Water Pump Performance)

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 9, 2023, the inspectors presented the triennial fire protection inspection results to Eric Olson, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DC-4921

I

I. Conclusions, Summary of Results, A. Appendix R

Compliance-05RBN and -05RBS

I

DC-4921 Vol 1

Book 2 of 3

Appendix R Calculations

Rev.1

DC-4921 Vol1

Book 3 of 3

Appendix R Calculations

Rev.1

DC-5702 Vol I

Fire Loading Calculation

H and M

DC-5713 Vol I

D

DC-5713 Vol I

System 29 - RHR: EDG11 Fuel Oil Tank Room

F

DC-5713 Vol I

Hydraulic Evaluation of the Upgraded Fire Distribution

Loop

F

DC-6 119

Appendix R Database

Rev.E

DC-6197

Reactor Coolant System Response Analyses to Support

10CFR50 Appendix R Compliance

C

DC-6483

Appendix R Protective Device Coordination Calculation

Rev.0

Calculations

DC-6483

Appendix R Protective Device Coordination Calculation

Rev.0

Calibration

Records

DC-4921 VOL 1

Book 1 of 3

Appendix R Calculations

Rev.1

21-21167

Alternate Diesel Fire Pump Flow Concern

2/07/2021

2-31216

NQA - Notice of First Level Issue Escalation - Continued

Violations in Station Standards Regarding Fire

Hazards

11/17/2022

98-12365

UFSAR/TRM Surveillance Requirements for Fire

Suppression System Should Be Based on System

Requirements

04/01/1998

71111.21N.05

Corrective Action

Documents

CARD - 21-

27023

Technical Specification 5.4.1.d States That Written

Procedures Shall Be Established, Implemented, and

Maintained Covering Fire Protection Program

Implementation

08/10/2021

CARD 21-21167

Organizational Effectiveness Cause Evaluation

Rev.2

71111.21N.05

Corrective Action

Documents

CARD-19-26148

28.507.05 Does Not Meet Requirements of TRSR 3.12.8.7

for 10% of Seal Type per Survey Group

08/15/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CARD-20-24081

Procedure Not Properly Revised

04/08/2020

Investigation into

TRSR 3.12.2.13

CARD - 21-21583

2/18/2021

23-21122

23 NRC Fire Protection Inspection: Previous UFSAR

Section Submitted to NRC

2/09/2023

23-21147

NRC Identified: Door R3-12 Latch Does Not Engage

2/10/2023

23-21237

23 NRC Fire Protection Inspection - NRC Identified -

Cracks in the Dedicated Shutdown Panel Pedestal

2/14/2023

23-21238

23 NRC Fire Protection Inspection NRC Identified

Housekeeping Issue

2/14/2023

23-21251

23 NRC Fire Protection Inspection - NRC Identified-

Cart Not Adequately Restrained

2/25/2023

23-21274

23 NRC Fire Protection Inspection: BOP Fire Door RA2-

Not Latching

2/15/2023

23-21276

23 NRC Fire Protection Inspection - CTG11-2 Door Not

Latching

2/15/2023

23-21277

23 NRC Fire Protection Inspection - NRC Identified -

CTG11-2 Panel Seam Cover Loose

2/15/2023

23-21278

23 NRC Fire Protection Inspection - NRC Identified -

CTG11-3 Exhaust Panel Loose

2/15/2023

23-21282

23 NRC Fire Protection Inspection - NRC Identified -

CTG11 CO2 System Auxiliary Relief Valve

Leaking

2/15/2023

23-21284

23 NRC Fire Protection Inspection - NRC Identified -

R2103S007 SBO 125VDC Battery Charger AC

Indicator Light is Flashing

2/15/2023

23-21287

23 NRC Fire Protection Inspection: Investigate If Carts

in Relay Room Are Approved per MOP23

2/15/2023

23-21289

23 NRC Fire Protection Inspection - NRC Identified:

Halon Bottle Strap Bolts Need Tightening

2/15/2023

23-21290

23 NRC Fire Protection Inspection - NRC Identified:

Housekeeping and Storage Issues in BOP

Switchgear Room

2/15/2023

Corrective Action

Documents

Resulting from

Inspection

23-21355

23 NRC Fire Protection Inspection: Performed

2/17/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Surveillance Document Backlog

23-21368

23 NRC Fire Protection Inspection: Enhancement

Evaluation for Computer Room Ceiling Tiles and Halon

System

2/14/2023

23-21415

23 NRC Fire Protection Inspection - NRC Identified:

Potential Hydrogen Accumulation Concern

2/20/2023

23-21419

23 NRC Fire Protection Inspection: FP37, "Perform

28.507.02 Fire Barrier Inspection (Mode 1,2,3) - License

Renewal" Requires Full Completion

2/20/2023

23-21431

23.324.01 Procedure Enhancement

2/21/2023

23-21459

23 NRC Fire Protection Inspection - Evaluation for

MOP11 Transient Control Needed

2/21/2023

23-21504

23 NRC Fire Protection Inspection-NRC Identified,

Discussion on Seal Inspection Procedure 28.507.05

C and How Were Meeting 10% Every

Months

2/22/2023

23-21505

23 NRC Fire Protection Inspection - NRC Identified,

Regarding the Note About M.05 20% every 18 Months

2/22/2023

23-21515

23 NRC Fire Protection Inspection - Evaluate If Hot

Work Audit SPF Should Provide More Information

2/22/2023

23-21549

23 NRC Fire Protection Inspection: DFP Room

Sprinkler System Enhancement FPEE

2/23/2023

23-21558

23 NRC Fire Protection Inspection: NRC Identified:

Acceptance Criteria (Step 7.1) Not Signed

2/23/2023

23-21624

23 NRC Fire Protection Inspection: Enhancement

Procedure 28.507.05 Rev 23 Step 5.1.1

2/27/2023

23-21667

23 NRC Fire Protection Inspection: Enhancement to

Detector Sensitivity Surveillance

2/28/2023

23-21712

23 NRC Fire Protection Inspection: NRC Identified -

Past Fire Water Pump Performance

03/01/2023

23-21713

23 NRC Fire Protection Inspection: NRC Identified -

Documentation Supporting MGA03 Adherence

03/01/2023

23-21715

23 NRC Fire Protection Inspection: NRC Identified -

Higher Than Expected Jockey Fire Pump Discharge

03/01/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Pressure

23-21760

23 NRC Fire Protection Inspection: NRC Identified -

Fire Wrap External Surfaces Inspection Guidance

03/02/2023

23-21768

23 NRC Fire Protection Inspection: EDP-80165 DFP

Sprinkler Head Adjusted and FP Program Impact

03/02/2023

23-21803

23 NRC Fire Protection Inspection: TSR-36993 Not

Incorporated into DC-5702Rev H

03/04/2023

23-21822

23 NRC Fire Protection Inspection: Recommended

Enhancement to MWC10Fire Wrap Guidance

03/06/2023

23-21883

23 NRC Fire Protection Inspection - NRC Identified -

Observation on Documentation Quality

03/07/2023

23-21885

23 NRC Fire Protection Inspection: Recommended

KT&R Enhancement

03/07/2023

23-21889

23 NRC Fire Protection Inspection: NRC Identified-

Generate a FPEE for the RB1 and RB2 Combustible

Exclusion Zones

03/07/2023

23-21896

23 NRC Fire Protection Inspection - NRC Identified -

Observation on Procedure Adherence

03/08/2023

23-21947

23 FPTI - NRC Observation on RFI Responsed

03/09/2023

61721-2482-02

Wiring Diagram Electric Fire Pump Controller General

Service Water Pump HSE

Rev.1

61721S-2481-02

Schematic Diagram Electric Fire Pump General Service

Water Pump HSE

Rev.N

61721S-2481-02

Schematic Diagram Electric Fire Pump General Service

Water Pump HSE

Rev.N

61721S-2481-

03A

Schematic Diagram Diesel Fore Pump P8000C001

Rev.0

61721S-2481-

03E

Wiring Diagram Diesel Fire Pump Driver Connection

Rev.0

6I721-2002-04

Auxiliary Building Relay Room Equipment Layout FIN. FL.

EL. 613'-6"

T

6I721-2041-09

Internal-External Wiring Diagram Termination Cab.

H11P861 Part 1

V

Drawings

6I721-2041-10

Internal-External Wiring Diagram Termination Cab.

P

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

H11P861 Part II

6I721-2051-48

Wiring Diagram Termination Cabinet H11P889 Part 1

S

6I721-2051-49

Wiring Diagram Termination Cabinet H11-P889 Part 2

O

6I721-2882-3

Instrument & Control Equipment Radwaste Building

Second Floor EL 613'-6"

F

6M721-2135

Diagram Fire Protection System (Sheet 1)

BC

6M721-2135-1

Diagram Fire Protection System (Sheet 2)

Rev.BN

6M721-5072

Fire Protection Plan Cable Tray Area at Elevations 551'-6"

& 562'-6" Auxiliary Building

K

6M721-5076

Fire Protection Plan Cable Tray Area at Elevation 562'-6"

Aux. Building

E

6M721A-2025

Fire Protection Plan Diesel Engine Fire Pump Room

General Service Water Pumphouse

D

6SD721-2500-01

One Line Diagram Plant 4160V & 480V System Service

Rev.CN

6SD721-2500-01

One Line Diagram Plant 4160V & 480V System Service

2/09/2022

2

Fire Protection Evaluation Reactor and Auxiliary Buildings

Basement - Plan - EL. 562'-0"

P

A-2403

Fire Protection Evaluation Reactor and Auxiliary Buildings

First Floor - Plan - El. 583'-6"

T

A-2405

Fire Protection Evaluation Reactor and Auxiliary Buildings

Second Floor - Plan - EL. 613'-6"

Y

A-2407

Fire Protection Evaluation Reactor and Auxiliary Buildings

Third Floor - Plan - EL. 641'-6" and 643'-6"

T

A-2408

Fire Protection Evaluation Reactor and Auxiliary Buildings

Fourth Floor - Plan - EL. 659'-6"

U

A-2409

Fire Protection Evaluation Reactor and Auxiliary Buildings

Fifth Floor - Plan - EL. 677'-6" and 684'-6"

V

A-4359

Battery Charg R DV1 F R-A B 643-6

C

E0102

Fire Seal Electrical Penetration Multiple Trays - Floor

M-S-2025

Document Revised under EDP-80165.053 for Water Fire

Protection

Piping Isometric

Fire Protection

Sprinkler Feed

6M721-4526-1

N

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

System Reactor

and Auxiliary

Bldgs

3071-198

Wall and Floor Penetration Seals and Fire Stops

I

EDP 80165

Fermi 2 Diesel Driven Fire Pump Replacement

Modification

EDP-1558

Spray Shields for MCCs and EECW Pump Motors

A

EDP80165

Fermi 2 Diesel Driven Fire Pump Replacement

Modification

Rev.0

FCR 80165-8

Fermi 2 Diesel Driven Fire Pump Replacement

Modification

TSR 38095

EF2 Impacts of GNF3 New Fuel Introduction

Engineering

Changes

TSR-36993

Documentation of Permanent Plant Shielding Along RB1

West Wall Between Columns A-11 and A-12

EVAL DE0035 01

Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for

Compliance with the Requirements of NFPA-13, Standard

for the Installation of Sprinkler Systems

A

EVAL-DE-0035-

Evaluation of Fermi 2 Automatic Fire Detection Systems

for Compliance with the Requirements of NFPA-72E

(Standard for Automatic Fire Detectors), and NFPA 72D

(Standard for Proprietary Protective Signaling Systems)

EVAL-DE0027-

Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for

Compliance with the Requirements of NFPA-13 Standard

for the Installation of Sprinkler Systems

EVAL-DE0035-

Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for

Compliance with the Requirements of NFPA-13, Standard

for the Installation of Sprinkler Systems

FPEE-02-0020

Update of FPEE-02-0020 for Spatial and Failure History of

Steam Tunnel Seals

FPEE-05-0020

NFPA 13-1980 Noncompliances for Several Sprinkler

Systems

FPEE-09-0004

Requirements for Temporary Intervening Combustibles in

Modes 1, 2,& 3

Engineering

Evaluations

FPEE-09-0042

Acceptability of Fire Detector Spacing & Location

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Non-Conformance for Detection Zone 4

FPEE-20-0005

Evaluation of OK-480/0K-470 Metal Tray Cover Not

Installed and Impact on Safe Shutdown CARD 20-25829

Rev.0

FPEE-21-0001

TR LCO 3.0.3 Evaluation for the Non-Functional Diesel

Fire Pump

Rev.0

FPEE-21-0003

Evaluation of TRST 3.12.2.13

FPEE-23-0001

EDG 13 Required Water Supply

FP-AB-2-8

Relay Room, Zone 8, EL. 613'6"

FP-AB-2-8

Relay Room, Zone 8, EL. 613'6"

Rev.7

FP-AB-3-12

Control Center Complex, Zone 12 AND 12A, EL. 643'6"

Rev.6

FP-AB-3-12

Control Center Complex, Zone 12 and 12A, EL. 643'6"

FP-AB-3-14a

Auxiliary Building, East Battery Room, Zone 14, EL. 643'6"

FP-AB-3-14a

Auxiliary Building, East Battery Room, Zone 14, EL. 643'6"

Rev.4

FP-AB-3M-13

Computer Room, Zone 13, EL. 655'6"

Rev.5

FP-AB-3M-13

Computer Room, Zone 13, EL. 655'6"

FP-AB-BMT-4

Control Air Compression Room, Zone 4, EL. 551'0"

Fire Plans

FP-AB-BMT-4

Control Air Compressor Room, Zone 4, EL. 551'0"

Rev.5

Fire Protection

Program Health

Report

Q1/Q2 2022

09/28/2022

Fire Protection

Program Health

Report

Q2/Q4 2022

2/14/2023

FPARC Meeting

Minutes

Fire Protection Advisory Review Committee (FPARC)

Agenda

01/09/2022

FPARC Meeting

Minutes

Fire Protection Advisory Review Committee Agenda

2/12/2022

NFPA No. 72E

Automatic Fire Detectors 1974

1974

Pyrotronics

Procedure Manual for Inspection Test Maintenance High

Voltage Systems

S-13-62

NFPA 13 Installation of Sprinkler Systems 1980

11/20/1980

TCP 22-0480

Transient Combustible Permit

01/05/2023

Miscellaneous

TCP 23-0003

Transient Combustible Permit

01/25/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

TCP 23-0004

Transient Combustible Permit

01/25/2023

TCP 23-0005

Transient Combustible Permit

01/25/2023

TCP 23-0006

Transient Combustible Permit

01/25/2023

TCP 23-0010

Transient Combustible Permit

2/01/2022

TCP 23-0011

Transient Combustible Permit

2/06/2023

TCP 23-0012

Transient Combustible Permit

2/03/2023

TRM VOL I

Technical Requirements Manual

2

20.000.18

Control of the Plant from the Dedicated Shutdown Panel

Rev.58

20.000.18

Control of the Plant from the Dedicated Shutdown Panel

23.501.01

Fire Water Suppression System

Rev.66

28.504.04

Fire Suppression Water System Flow Test

28.507.05

Inspection of Penetration Fire Stops

18, 22, and

28.507.05

Inspection of Penetration Fire Stops

MGA03

Procedure Use and Adherence

31A

MOP02

Independent Verification

15A

MOP11

Fire Protection

MOP11-100

Fire Protection Implementation

MOP11-100-001

Grinding, Cutting & Welding Permit (Sample)

MOP11-100-002

Transient Combustible Permit

MOP11-100-003

Flammable/Combustible Liquids/Aerosols Storage

Approval Form

MOP11-100-004

Fire Protection Inspection Form

MOP11-200

Fire Watch Implementation

MOP23

Plant Storage

Procedures

MOP23002

Missile/Seismic/Floor Loading Evaluation for Plant Storage

24.000.01

3,

Page 1 of 1

2715

Fire Rated Assemblies - LCO

1/29/2023

2305928

Perform 28.504.04 Fire Suppression Wtr System

Functional Flow Test

2/06/2018

Work Orders

44500300

Perform 28.504.04 Fire Suppression Wtr System

08/08/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Functional Flow Test

46341095

Perform 28.504.03 Fire Suppression WTR SYS SIM Auto

Act Test (Diesel Pump)

08/23/2017

49336625

Perform 28.503.06 Zone 13 Control Room Halon Fire

Suppression Functional Test

05/09/2019

49426008

Perform 28.507.06 Fire Dampers Test and Inspection -

BOP

05/20/2019

49877763

Perform Audit of Burning, Welding, Grinding Permits

07/16/2019

274935

Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI,

RCIC, TORUS, BSMNT

01/24/2020

244600

Perform 24.321.01 Dedicated Shutdown(3L) H2 1P624

Operability - ONLI7NE

2/13/2019

51513351

Perform 28.502.07 Zone 14 AB-3 CO2 Fire Suppression

Functional

05/30/2020

51641085

Perform 28.503.09 Zone 13 Computer Rm Fire

Protection/Detection Operability

01/22/2020

2180194

Perform 24.321.08 Dedicated Shutdown(3L,) H21P623

03/24/2020

53082290

Perform 28.507.01 Fire Barrier Inspection Mode 1,2,3

08/20/2020

53082290

Perform 28.507.01 Fire Barrier Inspection (Mode 1,2,3)

06/20/2020

53192258

Perform Audit of Burning, Welding, Grinding Permits

07/14/2020

54162539

Perform 28.503.06 Zone 13 Control Room Halon Fire

Suppression Functional Test

11/03/2020

54859922

Perform 28.503.09 Zone 13 Computer Rm Fire

Protection/Detection Operability

01/20/2021

55520995

Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI,

RCIC, TORUS, BSMNT

03/18/2021

56584775

Perform 24.321.05 Dedicated Shutdown(3L) H-21P623

07/09/2021

56656495

Perform Audit of Burning, Welding, Grinding Permits

07/13/2021

249732

Repair Steam Tunnel Penetration Seals Which Failed

Inspection

03/08/2022

249732

Repair Steam Tunnel Penetration Seals Which Failed

Inspection

04/24/2020

57338954

Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire

Detection Operability & Functional

10/07/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

57387374

Perform 28.505.12A CR - Misc Fire Detection Operability

10/14/2021

57862596

Replace Valve P80F407 - Jockey Pump Disch

Backpressure Vlv

08/02/2022

59440174

Perform 37.000.014 Emergency Lighting Performance

Evaluation for Group 3 Inc Freq 6 Months

05/16/2022

59517411

Perform 28.507.06 Fire Dampers Test and Inspection-

BOP-License Renewal

05/16/2022

59859351

Perform 28.505.60 Zone 12 Detector Sensitivity Test

06/09/2022

59859354

Perform 28.505.12 Zone 12 Control Room Fire Detection

Operability & Functional

06/09/2022

60500936

Perform 28.504.03 for the ADFP Only

2/24/2021

61130598

Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire

Detection Operability & Functional

10/06/2022

61197622

Perform 28.505.12A Zone 12A CR-MISC Fire Detection

Operability

10/13/2022

61369121

Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act

Test (electric pump)

11/01/2022

61443907

Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act

Test (diesel pump)

2/05/2022

61905560

Perform 24.107.03 Sec-5.2 SBFW Pump "A" Flow Test

2/28/2022

297989

Perform 24.107.03 Sec-5.3 SBFW Pump "B" Flow Test

2/10/2023

262316

Perform 28.504.02 Diesel Fire Pump Weekly Operability-

License Renewal

01/30/2023

67360307

Perform 28.504.02 Diesel Fire Pump Weekly

Operability-License Renewal

01/16/2023

FP14010927

Perform 23.504.003 Fire Suppression WTR SYS SIM Auto

Act Test (Electric Pump)

09/27/2001

FP15070926

Perform 28.504.03 Fire Suppression WTR SYS Sim Auto

Act Test (Diesel Pump)

09/26/2007

FS87201112

Perform 28.507.05 Att 3 & 10 Survey Grp 7 Inspection of

Penetration Fire Stops

11/12/2020