Title | Reactor Building Crane and Reactor Building Crane Support Structure/Superstructure Design Calculation Issue |
Description | The inspectors determined that an unresolved item (URI) existed concerning the design calculations that demonstrate the design adequacy of the reactor building crane, reactor building crane support structure and reactor building superstructure.
The inspectors reviewed Calculation No. CN-23934, Reactor Building Crane for Enrico Fermi Atomic Power Plant No. 2 Bridge and Trolley Structural Calculations, dated March 8, 1973, Calculation No. 4.02.09, Reactor Building Superstructure Steel Girt and Column Framing Design, Volume I, Revision A, Calculation No. DC-6019, Assessment of the Interior Columns for the Reactor Building Steel Superstructure Including Crane Lifted Load, Volume IA, Revision 0, and Calculation No. 4.02.04, Superstructure Roof Framing Bracing System, Volume I, Revision A The inspectors were concerned that the reactor building crane and reactor building crane support structure/superstructure had been evaluated using acceptance criteria that were not contained within UFSAR Table 3.8-18, Loading Combinations for Steel Structures Elastic Design. Also, inspectors were concerned that the reactor building crane and reactor building crane support structure/superstructure had not been evaluated for the applied loads that were part of the design and licensing basis load cases/load combinations specified in UFSAR Table 3.8-18, Loading Combinations for Steel Structures Elastic Design. In response to the inspectors concern, the licensee initiated corrective action program documents related to the reactor building crane and reactor building crane support structure/superstructure. The licensee entered these items into their corrective action program (CAP) as the following condition assessment and resolution documents (CARD): 1. CARD 10-22393; NRC-ISFSI Issue Calculation Issues; dated March 19, 2010 2. CARD 10-22723; NRC ISFSI Issue Need to Revise Calculation CN-23934; dated March 29, 2010 3. CARD 10-22958; NRC ISFSI Issue Calculation 4.02.04; dated April 6, 2010 4. CARD 10-22979; NRC ISFSI Issue-Inspectors Questions About Calculations DC-6019 and 4.02.04; dated April 7, 2010 5. CARD 10-22979; NRC ISFSI Issue-Inspectors Questions About Calculations DC-6019 and 4.02.04; dated April 7, 2010 6. CARD 10-22981; NRC ISFSI Issue-Calculation CN-23934; dated April 7, 2010 7. CARD 10-23797; NRC ISFSI Issue-Revise Calculation 4.02.04; dated May 5, 2010 8. CARD 10-23882; NRC ISFSI Issue-RB5 Crane Calculation; dated May 7, 2010 9. CARD 10-24045; NRC ISFSI Issue-Calculation DC-6019 Load Combinations; dated May 14, 2010 10. CARD 10-24166; NRC ISFSI Issue-CMTRs used in calculation 4.02.09; dated May 19, 2010 11. CARD 10-26275; NRC ISFSI Issue-Clarification of Analysis in DC-6019; dated July 24, 2010 12. CARD 10-26276; NRC ISFSI Issue; dated July 24, 2010 13. CARD 10-26277; NRC ISFSI Issue-Licensing Basis for Allowable Axis Stresses in 4.02.04; dated July 24, 2010 14. CARD 10-26278; NRC ISFSI Issue-Stresses is DC-6019 and 4.02.09; dated July 24, 201 15. CARD 10-26279; NRC ISFSI Issue-Extraction of Loads Used in 4.02.04; dated July 24, 2010 16. CARD 10-26280; NRC ISFSI Issue-Acceptance Criteria in Calc. 4.02.09; dated July 24, 2010 17. CARD 10-26282; NRC ISFSI Issue-Use of CMTRs in EDP-34473; dated July 24, 2010 18. CARD 10-26415; NRC ISFSI Question on Design Basis for Response Spectra used in Design Calculation DC-6019; dated July 28, 2010 19. CARD 10-26545; NRC Question ISFSI-RB5 Structure Corner Column Buckling Calculation Compliance with AISC Code; dated July 30, 2010 20. CARD 10-26548; NRC Questions-ISFSI-RB5 Structure Corner Column Peak Critical Yield Analysis Not Evaluated as Plastic According to AISC requirements; dated July 30, 2010 21. CARD 10-26691; ISFSI NRC Issue - Crane Runway Girder Splice; dated August 4, 2010 This item is being held as an unresolved item (URI 05000341/2010011-01) pending evaluation of these concerns by the licensee and subsequent inspector review and discussion with the licensee. The licensee indicated that they would provide the inspectors multiple revised analyses addressing the issues relevant to the reactor building crane, reactor building crane support structure and reactor building superstructure on September 10, 2010 |
Site: | Fermi ![]() |
---|---|
Report | IR 05000341/2010011 Section 1R20 |
Date counted | Sep 30, 2010 (2010Q3) |
Type: | URI: |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.2 |
Inspectors (proximate) | M Munir S Sheldon R Morris R Jones J Bozga M Jones T Hartmanj Bozgad Hills |