Peter Dietrich Senior VP and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI POWER PLANT, UNIT 2 - CONFIRMATION OF INITIAL LICENSE REEXAMINATION JUNE 2024
Dear Peter Dietrich:
In a telephone conversation on March 29, 2024, between Bryan Bergeon, Senior Operations Engineer, and Michael Donigian, Program Supervisor-Simulator/NRC Exam Development, arrangements were made for the administration of operator licensing reexaminations at Fermi Power Plant, Unit 2 during the week of June 10, 2024. In addition, the U.S. Nuclear Regulatory Commission (NRC) currently plans to make a reexamination validation visit to your facility the week of June 10, 2024.
As agreed, upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the reexaminations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by May 3, 2024. The operating tests and supporting reference materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by May 22, 2024. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the reexaminations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the reexaminations to be cancelled or rescheduled.
To conduct the requested operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above.
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the operating tests as they are being administered.
April 18, 2024
P. Dietrich 2
To permit timely NRC review and evaluation, your staff should submit senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090),
medical certifications (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the first reexamination date. If the applications are not received at least 30 days before the reexamination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first reexamination date.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
P. Dietrich 3
Thank you for your cooperation in this matter. Michael Donigian has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Bryan Bergeon at 630-829-9719 or Paul Zurawski at 630-829-9631.
Sincerely, Paul Zurawski, Chief Operations Branch Division of Operating Reactor Safety Docket No. 50-341 License No. NPF-43 cc: Distribution via LISTSERV J. Angel, Director, Nuclear Training Signed by Zurawski, Paul on 04/18/24
P. Dietrich 4
Letter to Peter Dietrich from Paul Zurawski dated April 18, 2024.
SUBJECT:
FERMI POWER PLANT, UNIT 2 - CONFIRMATION OF INITIAL LICENSE REEXAMINATION JUNE 2024 DISTRIBUTION:
Farrah Gaskins RidsNrrDorlLpl3 RidsNrrPMFermi2 Resource RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan Allan Barker David Curtis Karla Stoedter R3-DORS Ikeda Betts Maryia Bahdanovich-Kniazkova ADAMS Accession Number: ML24107B137 OFFICE RIII/DORS/OB:CE RIII/DORS/OB:BC NAME BBergeon:gmp PZurawski DATE 04/17/24 04/18/24 OFFICIAL RECORD COPY