Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006)
ML24057A345
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/28/2024
From: Billy Dickson
NRC/RGN-III/DORS/RPB2
To: Peter Dietrich
DTE Electric Company
Shared Package
ML24057A271 List:
References
IR 2023006
Download: ML24057A345 (1)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2023006)

Dear Peter Dietrich:

The NRC has completed its end-of-cycle performance assessment of Fermi Power Plant, Unit 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined that the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green). All PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC plans to perform Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, in 2024. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9827 with any questions you have regarding this letter.

Sincerely, Signed by Dickson, Billy on 02/26/24

Billy C. Dickson, Jr., Chief Reactor Projects Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000341 License No. NPF-43

Enclosure:

Inspection Plan

cc: Distribution via LISTSERV