SUBJECT:
FERMI POWER PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000341/2024402
Dear Peter Dietrich:
On May 10, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2 and discussed the results of this inspection with David Dunan and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000341 License No. NPF-43
Enclosure:
As stated
Inspection Report
Docket Number: 05000341
License Number: NPF-43
Report Number: 05000341/2024402
Enterprise Identifier: I-2024-402-0043
Licensee: DTE Electric Company
Facility: Fermi Power Plant, Unit 2
Location: Newport, MI
Inspection Dates: March 04, 2024 to May 10, 2024
Inspectors: N. Egan, Senior Physical Security Inspector
Approved By: Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Fermi Power Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspector evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 02.06 a, d; 02.07 a; 02.08 d-h
- Tier III: 02.10 a
71130.09 - Security Plan Changes
The inspector evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Partial)
(1) (Partial)
The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 10, 2024, the inspectors presented the security baseline inspection results to David Dunan and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.02 Procedures EP-205-01 Security Force 30A
MGA08 Control of Safeguards and Sensitive Security Information 20A
MGA09 Access Control 51A
SEP-SE1-14 Photo Identification and Keycards 39
SEP-SE1-24 Owner Controlled Area - Access Control 12
SEP-SE1-25 Personnel, Vehicle, and Materials Search and Entry 28
SEP-SE1-30 Personnel, Vehicle, and Materials Search Exceptions and 3B
Handling
Self-Assessments NSSE-23-0019 Quick Hit Self-Assessment Report; Access Control, 05/05/2023
Safeguard Information, and PI Verification
4