ML24173A101
| ML24173A101 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/14/2024 |
| From: | Paul Zurawski NRC/RGN-III |
| To: | Angel J Detroit Edison, Co |
| Bryan Bergeon | |
| Shared Package | |
| ML24088A296 | List: |
| References | |
| Download: ML24173A101 (1) | |
Text
DTE Electric Company 6400 N. Dixie Highway Newport, MI 48166 June 21, 2024 NRC-24-0043 Mr.Paul Zurawski, Chief, Operations Branch Division of Reactor Safety Region III U.S. Nuclear Regulatory Commission 2443 Wa1Tenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Fem1i 2 Initial Licensed Operator Post-Exam Submittal DTE 10 CFR 55.40 Enclosed please find the post-exam submittal package for the Fermi 2 Initial License Reexamination that was delivered June 12, 2024. The following items are enclosed in the post exam submittal package.
Post exam candidate comments Photocopies of Examination Security Agreements (Fom1 1.3-1)
The examination materials were developed using the appropriate guidance contained in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12.
These materials shall be withheld from public disclosure until after the examinations are complete.
If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Justin Angel -Director, Nuclear Training at (734) 586-4055.
Sincerely, J-:M,;;.__, JcjTJ,.} //,.{,1iL Justin Angel Director - Nuclear Training
Enclosure:
Post Exam Submittal Package
No post exam comments were received from the candidate.