ML17227A428: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED D TRIBUTION DEMONS TION SYSTEM j\REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)~%%4t9'9 FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BREEN,J.J.
{{#Wiki_filter:ACCELERATED D TRIBUTION DEMONS                                       TION SYSTEM j
Florida Power&Light Co.SAGER,D.A.
    \
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389 R
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
                                                  ~ %%4t9'9                                     DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power                 & Light           Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power               & Light           Co. 05000389 AUTH. NAME           AUTHOR AFFILIATION BREEN,J.J.           Florida Power & Light Co.
SAGER,D.A.           Florida     Power & Light Co.                                                     R RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Month ting repts for April 1992 for St.Lucie Units 1&2/92051 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL J SIZE'ITLE:
Month               ting repts for April       1992 for St. Lucie Units             1
Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA Q LPEB10 REG FIL 01 NRC PDR COPIES LTTR ENCL 1 1 D D R D NOTE TO ALL"RIDS" RECIPIENTS:
            & 2   /92051       tr.                                                                     D DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR       ENCL J Monthly Operating Report (per Tech Specs)                         SIZE'ITLE:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 D D 8 L
NOTES:
P.O.Box 128, Ft.Pierce, FL 34954-0128 May 12, 1992 L-92-148 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the April 1992 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, did'.A.Vice St.ger sident ie Plant DAS:JJB:kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments f, A NIL OFJA , ROIL iCO'OO ,GO fi o tDK DAS/PSL 4698-92 ,'i OIL fUA'ILIA I 9 0 0 0 pan FPL Group company I C E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO~50-335 DATE COMPLETED BY J.J.Breen TELEPHONE 407 468-4248 MONTH APRIL 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)4/1/92 4/2/92 4/3/92 4/4/92 4/5/92 4/6/92 4/7/92 4/8/92 4/9/92 4/10/92 4/11/92 4/12/92 4/13/92 4/14/92 4/15/92 4/16/92 4/17/92 4/18/92 4/19/92 4/20/92 4/21/92 4/22/92 4/23/92 4/24/92 4/25/92 4/26/92 4/27/92 4/28/92 4/29/92 4/30/92 732 866 865 867 865 867 867 867 865 865 864 863 828 598 749 863 863 862 862 863 862 865~858 862 863 865 864 866 866
RECIPIENT              COPIES            RECIPIENT                     COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME         LTTR ENCL                  D PD2-2 LA                     3    3    PD2-2 PD                          1    1 NORRIS,J                     1    1 D
~q~~
INTERNAL: ACRS                         10    10      AEOD/DOA AEOD/DSP/TPAB                 1    1            Q LPEB10 NRR/DOEA/OEAB                 1    1    REG  FIL        01 RGN2                         1    1 EXTERNAL: EG&G BRYCE,J.H                 1     1     NRC PDR NSIC                          1     1 R
OPERATING DATA REPORT OPERATXNG STATUS 5e-335 DOCVET NO DATE COMPI ETED BY Ji J~BREEN TELEPHONE 407/694/4248 1 t UNIT NAME t ST o LUCXE UNIT 1 Zi REPORTXNG PERIOD+APRIL 1992 3 LXCENSED THERMAL POHER (MHT):~7ee 4i NAMEPLATE RATING (GROSS MME): 850 5+DESIGN ELECTRICAL RATING (NET MWE)l.....,.....830 6+MAXIMUM DEPENDABLE CAPACITY (GROSS MHE)f 872 7 MAXXMUM DEPENDABLE CAPACXTY (NET MME)'39 8+IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SXNCE LAST REPORT t GIVE REASONS+9+POHER LEVEL TO HHXCH RESTRICTED'" IF ANY (NET MHE)ie, REASONS FOR RESTRXCTIONSr XF ANY'ONTHLY-YTD-CUMULATXVE tl.i HOURS XN REPORT PERIODS 12i NUMBER OF HOURS REACTOR WAS CRITICAL i.3i REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON-LINE 15'NXT RESERVE SHUTDOHN HOURS 16+GROSS THERMAL ENERGY GENERATED (MHH)17+GROSS ELECTRXCAL ENERGY GENERATED (MHH)18+NET ELECTRXCAL ENERGY GENERATED (MHH)19 o UNIT SERVICE FACTOR 20 UNXT AVAXLABILXTY FACTOR Zio CAPACITY FACTOR (USING MDC NET)22~CAPACITY FACTOR (USXNG DER NET)23+UNXT FORCED OUTAGE RATE 24+SHUTDOWNS SCHEDULED, OVER NEXT'MONTHS io 719 71'9s 0 ewe 719 ie eie 1904137 639860 607924 ieeie iee+e lee+8'ei+9 eie'2903 2903.0 ewe 29e3ie eie 7801577 2629450 2500255 iee,e ieeie ieZ+7 ie3o8 eie 134639,0 ie3e12o6 205.3 ieZe98i9 39 i 3 263528829 86962270 82183951 75.8 75i9 75'74+5 4ie 25 o XF SHUT DOHN AT END OF REPORT PERIOD r ESTIMATED DATE OF STARTUP~
D D
TLU IE UNIT SHUTDOWNS AI'6)POWER REDUCTIONS DDDBBTND.~PDP 5 DINT NBNB DATE COMPLETED BY J.J BREEN TBLBPHDNB L40468 8 REPORT MONTH APRIL 19 2 No.Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report System Code'omponent Code'Cause&Corrective Action to Prevent Recurrence 920413 F 0.0 N/A HF HTEXCH Unit 1 was downpowered for maintenance work on the 1A1 Heater Drain Pump and for cleaning of the 1A TCW Heat Exchanger.
D NOTE TO ALL "RIDS" RECIPIENTS:
F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 8'c License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method l-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG4161)
8 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
Exhibit l-Same Source~~~  
TOTAL NUMBER OF COPIES REQUIRED: LTTR               24 ENCL     24
 
L P.O. Box 128, Ft. Pierce, FL 34954-0128 May 12,   1992 L-92-148 10 CFR 50.36 U. S.     Nuclear Regulatory Commission Attn:       Document Control Desk Washington,           DC   20555 Re:     St. Lucie Units         1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the April 1992 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions on               this information, please contact us   ~
Very     truly       yours, did'.
A.     ger Vice           sident St.         ie Plant DAS:JJB:kw cc:     Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II,    USNRC Attachments f,
A         DAS/PSL 4698-92 NIL OFJA ROIL iCO
    ,
    'OO
    ,GO tDK fi   o
,'i OIL fUA ILIA I9 0 0 0
'
pan FPL Group company
 
I C
E
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-335 DATE COMPLETED BY   J.J. Breen TELEPHONE   407 468-4248 MONTH APRIL     1992 DAY       AVERAGE DAILY POWER LEVEL (MWe-Net) 4/ 1/92                   732 4/ 2/92                   866 4/ 3/92                   865 4/ 4/92                   867 4/ 5/92                   865 4/ 6/92                   867 4/ 7/92                   867 4/   8/92                   867 4/   9/92                   865 4/10/92                     865 4/11/92                     864 4/12/92                     863 4/13/92                     828 4/14/92                     598 4/15/92                     749 4/16/92                     863 4/17/92 4/18/92                     863 4/19/92                     862 4/20/92                     862 4/21/92                     863 4/22/92                     862 4/23/92                     865 4/24/92                     858 4/25/92
                        ~
4/26/92                     862 4/27/92                     863 865 4/28/92                     864 4/29/92                     866 4/30/92                     866
 
~
q~ ~
 
OPERATING DATA REPORT DOCVET NO            5e 335 DATE COMPI ETED BY     Ji J ~ BREEN TELEPHONE       407/694/4248 OPERATXNG STATUS 1 t UNIT NAME t ST o LUCXE     UNIT 1 Zi REPORTXNG PERIOD+     APRIL 1992 3 LXCENSED THERMAL POHER (MHT):                         ~7ee 4i NAMEPLATE RATING (GROSS MME):                         850 5+ DESIGN ELECTRICAL RATING ( NET MWE ) l.....,. .... 830 7 MAXXMUM DEPENDABLE CAPACXTY (NET      MME)'39 6+ MAXIMUM DEPENDABLE CAPACITY (GROSS MHE)f               872 8+ IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH               7)
SXNCE LAST REPORT t GIVE REASONS+
9+ POHER LEVEL TO HHXCH RESTRICTED'"   IF ANY (NET MHE) ie,   REASONS FOR RESTRXCTIONSr XF ANY'ONTHLY
                                                                        -YTD-   CUMULATXVE tl.i HOURS XN REPORT PERIODS                             719        '2903        134639,0 12i   NUMBER OF HOURS REACTOR WAS CRITICAL                 71'9s 0      2903.0      ie3e12o6 i.3i REACTOR RESERVE SHUTDOWN HOURS                           ewe          ewe          205.3 HOURS GENERATOR ON-LINE                             719  ie      29e3ie      ieZe98i9 15'NXT     RESERVE SHUTDOHN HOURS                             eie        eie            39 i 3 16+   GROSS THERMAL ENERGY GENERATED (MHH)               1904137      7801577      263528829 17+   GROSS ELECTRXCAL ENERGY GENERATED (MHH)             639860      2629450        86962270 18+   NET ELECTRXCAL ENERGY GENERATED (MHH)               607924      2500255        82183951 19 o UNIT SERVICE FACTOR                                   ieeie        iee,e            75.8 20 UNXT AVAXLABILXTYFACTOR                                  iee+e        ieeie            75i9 Zio CAPACITY FACTOR (USING MDC NET)                       lee+8        ieZ+7            75' 22 ~ CAPACITY FACTOR (USXNG DER NET)                     'ei+9          ie3o8            74+5 23+ UNXT FORCED OUTAGE RATE                                   eie          eie            4ie 24+ SHUTDOWNS SCHEDULED, OVER NEXT'     MONTHS io 25 o XF SHUT DOHN AT END OF REPORT   PERIOD r ESTIMATED DATE OF STARTUP ~
 
UNIT SHUTDOWNS AI'6) POWER REDUCTIONS DDDBBTND.                   ~PDP       5 DINT NBNB                     TLU IE DATE COMPLETED BY                 J. J BREEN TBLBPHDNB                   L40468       8 REPORT MONTH APRIL                   19 2 No.         Date Type Duration   Reason~       Method of           Licensee     System                                 Cause  & Corrective Code'omponent (Hours)                    Shutting        Event Report                    Code'                     Action to Down                                                                Prevent Recurrence Reactor 920413   F   0.0                                           N/A         HF           HTEXCH   Unit 1 was downpowered for maintenance work on the 1A1 Heater Drain Pump and for cleaning of the 1A TCW Heat Exchanger.
F Forced                         Reason                                          Method                                  Exhibit G - Instructions for S Scheduled                     A - Equipment failure (explain)                 l - Manual                              Preparation of Data Entry B - Maintenance or Test                         2 - Manual Scram                        Sheets Licensee Event Report C - Refueling                                   3 - Automatic Scram                    (LER) File (NUREG4161)
D - Regulatory restriction                     4 - Continued E - Operator Training 8'c License Examination   5 - Load Reduction F - Administrative                              9 - Other (Explain)                     Exhibit l - Same Source G - Operational Error (Expalin)
H - Other (Explain)
~ ~ ~


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO~50-335 DATE COMPLETED BY Z.Z.Breen TELEPHONE 407 468-4248 REPORT MONTH APRIL 1992 Unit 1 was downpowered on April 13, 1992, for maintenance work on the 1A1 Heater Drain Pump and for cleaning of the 1A TCW Heat Exchanger.
OF OPERATING EXPERIENCE DOCKET NO ~ 50-335 DATE COMPLETED BY Z.Z. Breen TELEPHONE 407 468-4248 REPORT MONTH APRIL   1992 Unit 1 was downpowered on April 13, 1992, for maintenance work on the 1A1 Heater Drain Pump and for cleaning of the 1A TCW Heat Exchanger. On April 16, 1992, the Unit was at 100> power and remained there for the rest of the month.
On April 16, 1992, the Unit was at 100>power and remained there for the rest of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.  
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
~~AVERAGE DAILY UNIT POSER DOCKET NO 50-389 I~DATE COMPLETED BY J.J.Breen TELEPHONE 407 468-4248 MONTH APRIL 1992 AVERAGE DAILY POSER LEVEL (Mwe-Net)4/1/92 4/2/92 4/3/92 4/4/92 4/5/92 4/6/92 4/7/92 4/8/92 4/9/92 4/10/92 4/11/92 4/12/92 4/13/9Z 4/14/92 4/15/92 4/16/92 4/17/92 4/18/92 4/19/92 4/20/92 4/Zi/92 4/22/92 4/23/92 4/24/92 4/25/92 4/26/92 4/27/92 4/28/92 4/29/92 4/30/92 862 862 860 861 85'I 859 836 692 780 865 864 862 862 861 861 862 860 859 S57 853 11-21-2-1-3-3-3-3  
 
~~C e~A 4 OPERATXNG DAT*REPORT OPERATING STATUS DOCV(ET NO 50-389 DATE COMPLETED BY Ji Ji BREEN TELEPHONE 407/694/4248 is UNIT NAMEi ST+LUCIE UNIT 2 2+REPORTING PERIOD: APRXL 1992 3i LICENSED THERMAL POHER (MHT)t 2700 4i NAMEPLATE RATING (GROSS MME)$850 5, DESIGN ELECTRXCAL RATING (NET MME);830 bi MAXIMUM DEPENDABLE CAPACITY (GROSS MME)i 882 7i M*XXMUM DEPENDABLE CAPACITY (NET MHE)i 839 Bi IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SXNCE LAST REPORT r GIVE REASONS i POWER LEVEL TO WHICH RESTRICTED~
~ ~
XF ANY (NET MHE)10'EASONS FOR RESTRICTIONS'F ANYw MONTHLY-YTD-CUMULATIVE ilo HOURS IN REPORT PERIOD)12'UMBER OF HOURS REACTOR HAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14 i HOURS GENERATOR ON-LINE 15 o UNIT RESERVE SHUTDOWN HOURS ibi GROSS THERMAL ENERGY GENERATED (MHH)17.GROSS ELECTRICAL ENERGY GENERATED (MHH)18'ET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVXCE FACTOR 28.UNIT AVAXL*BXLITY FACTOR 21'APACITY FACTOR (USING MDC NET)22+CAPACITY F*CTOR (USXNG DER NET)23'NIT FORCED OUTAGE RATE 24'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 SHUTDOWN 7 REFUELXNG 719 481.6 OoO 481 ib OiO 1278337 428790 404865 67eO 67iO 67+1, 67'0+0 2963 2665ib Oi0 2665ib Oie 7022240 2360550 2236886 91 i 8 91+8 91 i8 92+8 0+0 76536oe 66285i9 0.0 65269 F 9 OiO 171134846 57086370 53999733 85i3 85i3 85+5 85i7 4i9 25 XF SHUT DOHN AT END OF REPORT PERIOD ESTXMATED DATE OF STARTUP'/27/92  
AVERAGE DAILY UNIT POSER DOCKET NO   50-389 I~
~~a l TLU IE 4 UNIT SHUTDOWNS AI'6)POWER REDUCTIONS DDDE81'ND.
DATE COMPLETED BY   J.J. Breen TELEPHONE 407 468-4248 MONTH APRIL   1992 AVERAGE DAILY POSER LEVEL (Mwe-Net) 4/ 1/92                 862 4/ 2/92                 862 4/ 3/92                 860 4/ 4/92                 861 4/ 5/92                 85'I 4/ 6/92                 859 4/ 7/92                 836 4/ 8/92                 692 4/ 9/92                 780 4/10/92                 865 4/11/92                 864 4/12/92                 862 4/13/9Z                 862 4/14/92                 861 4/15/92                 861 4/16/92                 862 4/17/92                   860 4/18/92                   859 4/19/92                   S57 4/20/92                   853 4/Zi/92                   11 4/22/92                   -21 4/23/92                   -2 4/24/92                   -1 4/25/92 4/26/92 4/27/92                   -3 4/28/92                   -3 4/29/92                     -3 4/30/92                     -3
~8 DN22 NANB DATE COMPLETED BY J.J BREEN TELEPNDPN 6446 468-4248 REPORT MONTH MARCH l 2 No.Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report¹System Code Component Codes Cause R Corrective Action to Prevent Recurrence 920407 920408 920420 0.0 0.0 237.4 B N/A N/A-N/A HF HF RB XXXXXX CKTBRK VESSEL Unit 2 was downpowered and held at approximately 80%power for waterbox cleaning.Unit 2 was held at approximately 85%power because of electrical problems experienced with the 2A2 circulating water pump (CWP)breaker.Unit 2 was downpowered for refueling.
 
F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintcnancc or Test C-Refueling D-Regulatory restriction E-Operator Training ds License Examination F-Administrative G-Operational Error (Expalin)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts Liccnsce Event Rcport (LER)File (NUREG4161)
        ~ ~
Exhibit I-Same Source s  
C e
  ~ A 4
 
OPERATXNG DAT* REPORT DOCV(ET NO           50 389 DATE COMPLETED BY       Ji Ji BREEN TELEPHONE         407/694/4248 OPERATING STATUS is UNIT NAMEi ST+ LUCIE         UNIT 2 2+ REPORTING PERIOD:       APRXL 1992 3i LICENSED THERMAL POHER (MHT) t                   2700 4i NAMEPLATE RATING (GROSS MME) $                     850 5, DESIGN ELECTRXCAL RATING (NET MME);               830 bi MAXIMUM DEPENDABLE CAPACITY (GROSS MME) i         882 7i M*XXMUM DEPENDABLE CAPACITY (NET MHE)i             839 Bi IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH           7)
SXNCE LAST REPORT r GIVE REASONS i POWER LEVEL TO WHICH RESTRICTED~ XF ANY (NET MHE) 10'EASONS       FOR RESTRICTIONS'F   ANYw MONTHLY     - YTD-     CUMULATIVE ilo   HOURS IN REPORT PERIOD)                         719        2963          76536oe 12'UMBER     OF HOURS REACTOR HAS CRITICAL             481.6      2665ib        66285i9
: 13. REACTOR RESERVE SHUTDOWN HOURS                     OoO          Oi0            0.0 14 i HOURS GENERATOR ON-LINE                           481 ib    2665ib        65269 9F 15 o UNIT RESERVE SHUTDOWN HOURS                         OiO          Oie            OiO ibi   GROSS THERMAL ENERGY GENERATED (MHH)           1278337      7022240      171134846
: 17. GROSS ELECTRICAL ENERGY GENERATED (MHH)         428790    2360550        57086370 18'ET     ELECTRICAL ENERGY GENERATED (MWH)           404865    2236886        53999733
: 19. UNIT SERVXCE FACTOR                                 67eO        91 i 8          85i3
: 28. UNIT AVAXL*BXLITYFACTOR                              67iO        91+8            85i3 21'APACITY       FACTOR (USING MDC NET)                 67+  1,      91 i8          85+5 22+ CAPACITY F*CTOR (USXNG DER NET)                     67 '        92+8            85i7 23'NIT     FORCED OUTAGE RATE                           0+0          0+0            4i9 24'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 SHUTDOWN 7 REFUELXNG 25   XF SHUT DOHN AT END OF REPORT PERIOD     ESTXMATED DATE OF     STARTUP'/27/92
 
  ~ ~
a l
 
4 UNIT SHUTDOWNS AI'6) POWER REDUCTIONS DDDE81'ND.
DN22 NANB
                                                                                                                                            ~8TLU      IE DATE COMPLETED BY                   J. J BREEN TELEPNDPN                     6446     468-4248 REPORT MONTH MARCH l                         2 No.         Date Type Duration   Reason~       Method of         Licensee     System       Component                 Cause   R Corrective (Hours)                    Shutting      Event Report    Code            Codes                        Action to Down                ¹                                                  Prevent Recurrence Reactor 920407       0.0                                         N/A         HF         XXXXXX   Unit 2 was downpowered and held at approximately 80% power for waterbox cleaning.
920408        0.0          B                              N/A-        HF          CKTBRK      Unit 2 was held at approximately 85% power because of electrical problems experienced with the 2A2 circulating water pump (CWP) breaker.
920420      237.4                                        N/A          RB          VESSEL        Unit 2 was downpowered for refueling.
F Forced                         Reason                                        Method                                    Exhibit G - Instructions for S Scheduled                     A - Equipment failure (explain)               1 - Manual                                Preparation of Data Entry B - Maintcnancc or Test                       2 - Manual Scram                          Shccts Liccnsce Event Rcport C - Refueling                                 3 - Automatic Scram                      (LER) File (NUREG4161)
D - Regulatory restriction                     4 - Continued E - Operator Training ds License Examination   5 - Load Reduction F - Administrative                            9 - Other (Explain)                       Exhibit I - Same Source G - Operational Error (Expalin)
H - Other (Explain) s


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-389 DATE COMPLETED BY Z.Z.Breen TELEPHONE 407 468-4248 REPORT MONTH APRIL 1992 Unit 2 was downpowered on April 7, 1992, for waterbox cleaning;upon the completion of waterbox cleaning Unit 2 was increased in power.On April 8, 1992, the Unit was held at approximately 854 power when electrical problems were experienced with the 2A2 CWP breaker.On April 9, 1992, Unit 2 was at 100%power and remained there until April 20, 1992, when the Unit was downpowered for refueling.
OF OPERATING EXPERIENCE DOCKET NO. 50-389 DATE COMPLETED BY Z.Z. Breen TELEPHONE   407   468-4248 REPORT MONTH APRIL   1992 Unit 2 was downpowered on April 7, 1992, for waterbox cleaning; upon the completion of waterbox cleaning Unit 2 was increased in power. On April 8, 1992, the Unit was held at approximately 854 power when electrical problems were experienced with the 2A2 CWP breaker. On April 9, 1992, Unit 2 was at 100% power and remained there until April 20, 1992, when the Unit was downpowered for refueling. Unit 2 is currently in a refueling outage.
Unit 2 is currently in a refueling outage.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.  
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
~'}}
 
  '
~}}

Revision as of 22:23, 29 October 2019

Monthly Operating Repts for Apr,1992 for St Lucie,Units 1 & 2.W/920512 Ltr
ML17227A428
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/30/1992
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-148, NUDOCS 9205190078
Download: ML17227A428 (17)


Text

ACCELERATED D TRIBUTION DEMONS TION SYSTEM j

\

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~ %%4t9'9 DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREEN,J.J. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co. R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Month ting repts for April 1992 for St. Lucie Units 1

& 2 /92051 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL J Monthly Operating Report (per Tech Specs) SIZE'ITLE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS,J 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA AEOD/DSP/TPAB 1 1 Q LPEB10 NRR/DOEA/OEAB 1 1 REG FIL 01 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

8 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

L P.O. Box 128, Ft. Pierce, FL 34954-0128 May 12, 1992 L-92-148 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the April 1992 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, did'.

A. ger Vice sident St. ie Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments f,

A DAS/PSL 4698-92 NIL OFJA ROIL iCO

,

'OO

,GO tDK fi o

,'i OIL fUA ILIA I9 0 0 0

'

pan FPL Group company

I C

E

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-335 DATE COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 MONTH APRIL 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 4/ 1/92 732 4/ 2/92 866 4/ 3/92 865 4/ 4/92 867 4/ 5/92 865 4/ 6/92 867 4/ 7/92 867 4/ 8/92 867 4/ 9/92 865 4/10/92 865 4/11/92 864 4/12/92 863 4/13/92 828 4/14/92 598 4/15/92 749 4/16/92 863 4/17/92 4/18/92 863 4/19/92 862 4/20/92 862 4/21/92 863 4/22/92 862 4/23/92 865 4/24/92 858 4/25/92

~

4/26/92 862 4/27/92 863 865 4/28/92 864 4/29/92 866 4/30/92 866

~

q~ ~

OPERATING DATA REPORT DOCVET NO 5e 335 DATE COMPI ETED BY Ji J ~ BREEN TELEPHONE 407/694/4248 OPERATXNG STATUS 1 t UNIT NAME t ST o LUCXE UNIT 1 Zi REPORTXNG PERIOD+ APRIL 1992 3 LXCENSED THERMAL POHER (MHT): ~7ee 4i NAMEPLATE RATING (GROSS MME): 850 5+ DESIGN ELECTRICAL RATING ( NET MWE ) l.....,. .... 830 7 MAXXMUM DEPENDABLE CAPACXTY (NET MME)'39 6+ MAXIMUM DEPENDABLE CAPACITY (GROSS MHE)f 872 8+ IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SXNCE LAST REPORT t GIVE REASONS+

9+ POHER LEVEL TO HHXCH RESTRICTED'" IF ANY (NET MHE) ie, REASONS FOR RESTRXCTIONSr XF ANY'ONTHLY

-YTD- CUMULATXVE tl.i HOURS XN REPORT PERIODS 719 '2903 134639,0 12i NUMBER OF HOURS REACTOR WAS CRITICAL 71'9s 0 2903.0 ie3e12o6 i.3i REACTOR RESERVE SHUTDOWN HOURS ewe ewe 205.3 HOURS GENERATOR ON-LINE 719 ie 29e3ie ieZe98i9 15'NXT RESERVE SHUTDOHN HOURS eie eie 39 i 3 16+ GROSS THERMAL ENERGY GENERATED (MHH) 1904137 7801577 263528829 17+ GROSS ELECTRXCAL ENERGY GENERATED (MHH) 639860 2629450 86962270 18+ NET ELECTRXCAL ENERGY GENERATED (MHH) 607924 2500255 82183951 19 o UNIT SERVICE FACTOR ieeie iee,e 75.8 20 UNXT AVAXLABILXTYFACTOR iee+e ieeie 75i9 Zio CAPACITY FACTOR (USING MDC NET) lee+8 ieZ+7 75' 22 ~ CAPACITY FACTOR (USXNG DER NET) 'ei+9 ie3o8 74+5 23+ UNXT FORCED OUTAGE RATE eie eie 4ie 24+ SHUTDOWNS SCHEDULED, OVER NEXT' MONTHS io 25 o XF SHUT DOHN AT END OF REPORT PERIOD r ESTIMATED DATE OF STARTUP ~

UNIT SHUTDOWNS AI'6) POWER REDUCTIONS DDDBBTND. ~PDP 5 DINT NBNB TLU IE DATE COMPLETED BY J. J BREEN TBLBPHDNB L40468 8 REPORT MONTH APRIL 19 2 No. Date Type Duration Reason~ Method of Licensee System Cause & Corrective Code'omponent (Hours) Shutting Event Report Code' Action to Down Prevent Recurrence Reactor 920413 F 0.0 N/A HF HTEXCH Unit 1 was downpowered for maintenance work on the 1A1 Heater Drain Pump and for cleaning of the 1A TCW Heat Exchanger.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) l - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training 8'c License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit l - Same Source G - Operational Error (Expalin)

H - Other (Explain)

~ ~ ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ 50-335 DATE COMPLETED BY Z.Z. Breen TELEPHONE 407 468-4248 REPORT MONTH APRIL 1992 Unit 1 was downpowered on April 13, 1992, for maintenance work on the 1A1 Heater Drain Pump and for cleaning of the 1A TCW Heat Exchanger. On April 16, 1992, the Unit was at 100> power and remained there for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

~ ~

AVERAGE DAILY UNIT POSER DOCKET NO 50-389 I~

DATE COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 MONTH APRIL 1992 AVERAGE DAILY POSER LEVEL (Mwe-Net) 4/ 1/92 862 4/ 2/92 862 4/ 3/92 860 4/ 4/92 861 4/ 5/92 85'I 4/ 6/92 859 4/ 7/92 836 4/ 8/92 692 4/ 9/92 780 4/10/92 865 4/11/92 864 4/12/92 862 4/13/9Z 862 4/14/92 861 4/15/92 861 4/16/92 862 4/17/92 860 4/18/92 859 4/19/92 S57 4/20/92 853 4/Zi/92 11 4/22/92 -21 4/23/92 -2 4/24/92 -1 4/25/92 4/26/92 4/27/92 -3 4/28/92 -3 4/29/92 -3 4/30/92 -3

~ ~

C e

~ A 4

OPERATXNG DAT* REPORT DOCV(ET NO 50 389 DATE COMPLETED BY Ji Ji BREEN TELEPHONE 407/694/4248 OPERATING STATUS is UNIT NAMEi ST+ LUCIE UNIT 2 2+ REPORTING PERIOD: APRXL 1992 3i LICENSED THERMAL POHER (MHT) t 2700 4i NAMEPLATE RATING (GROSS MME) $ 850 5, DESIGN ELECTRXCAL RATING (NET MME); 830 bi MAXIMUM DEPENDABLE CAPACITY (GROSS MME) i 882 7i M*XXMUM DEPENDABLE CAPACITY (NET MHE)i 839 Bi IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SXNCE LAST REPORT r GIVE REASONS i POWER LEVEL TO WHICH RESTRICTED~ XF ANY (NET MHE) 10'EASONS FOR RESTRICTIONS'F ANYw MONTHLY - YTD- CUMULATIVE ilo HOURS IN REPORT PERIOD) 719 2963 76536oe 12'UMBER OF HOURS REACTOR HAS CRITICAL 481.6 2665ib 66285i9

13. REACTOR RESERVE SHUTDOWN HOURS OoO Oi0 0.0 14 i HOURS GENERATOR ON-LINE 481 ib 2665ib 65269 9F 15 o UNIT RESERVE SHUTDOWN HOURS OiO Oie OiO ibi GROSS THERMAL ENERGY GENERATED (MHH) 1278337 7022240 171134846
17. GROSS ELECTRICAL ENERGY GENERATED (MHH) 428790 2360550 57086370 18'ET ELECTRICAL ENERGY GENERATED (MWH) 404865 2236886 53999733
19. UNIT SERVXCE FACTOR 67eO 91 i 8 85i3
28. UNIT AVAXL*BXLITYFACTOR 67iO 91+8 85i3 21'APACITY FACTOR (USING MDC NET) 67+ 1, 91 i8 85+5 22+ CAPACITY F*CTOR (USXNG DER NET) 67 ' 92+8 85i7 23'NIT FORCED OUTAGE RATE 0+0 0+0 4i9 24'HUTDOHNS SCHEDULED OVER NEXT 6 MONTHS UNIT 2 SHUTDOWN 7 REFUELXNG 25 XF SHUT DOHN AT END OF REPORT PERIOD ESTXMATED DATE OF STARTUP'/27/92

~ ~

a l

4 UNIT SHUTDOWNS AI'6) POWER REDUCTIONS DDDE81'ND.

DN22 NANB

~8TLU IE DATE COMPLETED BY J. J BREEN TELEPNDPN 6446 468-4248 REPORT MONTH MARCH l 2 No. Date Type Duration Reason~ Method of Licensee System Component Cause R Corrective (Hours) Shutting Event Report Code Codes Action to Down ¹ Prevent Recurrence Reactor 920407 0.0 N/A HF XXXXXX Unit 2 was downpowered and held at approximately 80% power for waterbox cleaning.

920408 0.0 B N/A- HF CKTBRK Unit 2 was held at approximately 85% power because of electrical problems experienced with the 2A2 circulating water pump (CWP) breaker.

920420 237.4 N/A RB VESSEL Unit 2 was downpowered for refueling.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintcnancc or Test 2 - Manual Scram Shccts Liccnsce Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training ds License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Expalin)

H - Other (Explain) s

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 DATE COMPLETED BY Z.Z. Breen TELEPHONE 407 468-4248 REPORT MONTH APRIL 1992 Unit 2 was downpowered on April 7, 1992, for waterbox cleaning; upon the completion of waterbox cleaning Unit 2 was increased in power. On April 8, 1992, the Unit was held at approximately 854 power when electrical problems were experienced with the 2A2 CWP breaker. On April 9, 1992, Unit 2 was at 100% power and remained there until April 20, 1992, when the Unit was downpowered for refueling. Unit 2 is currently in a refueling outage.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

'

~