{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RI DS)CESSION NBR: 9008240083 DOC.DATE: 90/08/20 NOTARIZED:
DISTRIBUTION
NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.
DEMONSTRATION
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SYSTEM REGULATORY
 
INFORMATION
==SUBJECT:==
DISTRIBUTION
Suppls response to violations noted in Insp Repts 50 259/90 14 I 50 260/90 14 6 50 296/90 14~DISTRIBUTION CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: B.Wilson,S.
SYSTEM (RI DS)CESSION NBR: 9008240083
BLACK 1 Copy each to: S.Black,B.WILSON 1 Copy each to: S.Black,B.WILSON DOCKET 05000259 05000260 05000296 D'I/05000259 A 05000260 05000296 RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DEIIB DEDRO t NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DIR-8&02 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 RECIPIENT I D CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU I D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 SRGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
DOC.DATE: 90/08/20 NOTARIZED:
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29 A D D TENNESSEE VALLEY AUTHORITY CHATTANOOGA.
NO FACIL:50-259
TENNESSEE 37401 6N 38A Lookout Place AUG 20 1990 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION
In the I1atter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROVilS FERRY NUCLEAR PLANT (BFN)-NRC IiNSPECTION REPORT 50-259, 260, 296/90-14-SUPPLEi~lENTAL RESPONSE TO NOTICE OF VIOLATIOiN On June 14, 1990, NRQ issued the subject inspection report which cited TVA with a violation for failure to perform independent verification.
MEDFORD,M.O.
In its response to the violation dated July 13, 1990, TVA noted it was evaluating the generic impact of this concern and committed to provide a supplemental response by August 24, 1990.This letter reports on the generic actions that TVA has taken to address independent verification.
Tennessee Valley Authority RECIP.NAME
The enclosure provides a listing of commitments being made in this letter.In order to stan.ardize independent verification activities TVA has developed a corporate level standard, STD-10.1.15, Independent Verification.
RECIPIENT AFFILIATION
This standard establishes requirements for determining when independent verification is required and for performing independent verification.
Document Control Branch (Document Control Desk)SUBJECT: Suppls response to violations
This standard will be implemented at BFN by September 30, 1990, through a revision to Site Director Standard Practice (SDSP)3.15, Independent Verification.
noted in Insp Repts 50 259/90 14 I 50 260/90 14 6 50 296/90 14~DISTRIBUTION
BFNi procedures will be evaluated against the criteria in this revised SDSP during the two-year procedure review and change process.In summary, TVA considers that the revision of SDSP 3.15 will establish consistent use of independent verification activities at BFN such that plant systems and components are controlled in a manner that supports safe and reliable operation.
CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
Very truly yours, TE&lESSEE VALLEY AUTHORITY 0 9C108'=0'sit".Enclosure cc: See page 2>1.10:=:>401.18'OP AQOC:K I.J i~Iark O.i~ledford, Vice resident Nuclear Technology and Licensing An Equal Opportunity Emptoyer~je/I/I 0'
of Violation Response NOTES:1 Copy each to: B.Wilson,S.
U.S.Nuclear Regulatory Commission cc (Enclosure):
BLACK 1 Copy each to: S.Black,B.WILSON
Ns.S.C.Black, Deputy Director Project Directorate II-4 U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Haryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama ,35609-2000 Thierry i'1.Ross, Project i'ianager U.S.Nuclear Regu1atory Commission One White Flint, North 11555 Rockville Pike Rockvi,lie,.'Iaryland 208 Hr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory Commission Region II 101 51arietta Street, NW, Suite 2900 Atlanta, Georgia 30323  
1 Copy each to: S.Black,B.WILSON
'EilCLOSURE Site Director Standard Practice 3.15, Independent Verification, will be revised to implement corporate standard ONP 10.1.15, Independent Verification.
DOCKET 05000259 05000260 05000296 D'I/05000259 A 05000260 05000296 RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DEIIB
This revision will be completed by September 30, 1990.}}
DEDRO t NRR SHANKMAN,S
NRR/DOEA DIR 11 NRR/DRIS/DIR
NRR/PMAS/ILRB12
OE DIR-8&02 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 RECIPIENT I D CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU I D NRR/DLPQ/LPEB10
NRR/DREP/PEPB9D
NRR/DST/DIR
8E2 NUDOCS-ABSTRACT
OGC/HDS2 SRGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29 A D D  
TENNESSEE VALLEY AUTHORITY CHATTANOOGA.
TENNESSEE 37401 6N 38A Lookout Place AUG 20 1990 U.S.Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
In the I1atter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROVilS FERRY NUCLEAR PLANT (BFN)-NRC IiNSPECTION
REPORT 50-259, 260, 296/90-14-SUPPLEi~lENTAL
RESPONSE TO NOTICE OF VIOLATIOiN
On June 14, 1990, NRQ issued the subject inspection
report which cited TVA with a violation for failure to perform independent
verification.
In its response to the violation dated July 13, 1990, TVA noted it was evaluating
the generic impact of this concern and committed to provide a supplemental
response by August 24, 1990.This letter reports on the generic actions that TVA has taken to address independent
verification.
The enclosure provides a listing of commitments
being made in this letter.In order to stan.ardize
independent
verification
activities
TVA has developed a corporate level standard, STD-10.1.15, Independent
Verification.
This standard establishes
requirements
for determining
when independent
verification
is required and for performing
independent
verification.
This standard will be implemented
at BFN by September 30, 1990, through a revision to Site Director Standard Practice (SDSP)3.15, Independent
Verification.
BFNi procedures
will be evaluated against the criteria in this revised SDSP during the two-year procedure review and change process.In summary, TVA considers that the revision of SDSP 3.15 will establish consistent
use of independent
verification
activities
at BFN such that plant systems and components
are controlled
in a manner that supports safe and reliable operation.
Very truly yours, TE&lESSEE VALLEY AUTHORITY 0 9C108'=0'sit".Enclosure cc: See page 2>1.10:=:>401.18'OP AQOC:K I.J i~Iark O.i~ledford, Vice resident Nuclear Technology
and Licensing An Equal Opportunity
Emptoyer~je/I/I  
0'  
U.S.Nuclear Regulatory
Commission
cc (Enclosure):
Ns.S.C.Black, Deputy Director Project Directorate
II-4 U.S.Nuclear Regulatory
Commission
One White Flint, North 11555 Rockville Pike, Rockville, Haryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama ,35609-2000
Thierry i'1.Ross, Project i'ianager U.S.Nuclear Regu1atory
Commission
One White Flint, North 11555 Rockville Pike Rockvi,lie,.'Iaryland
208 Hr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory
Commission
Region II 101 51arietta Street, NW, Suite 2900 Atlanta, Georgia 30323  
'EilCLOSURE
Site Director Standard Practice 3.15, Independent
Verification, will be revised to implement corporate standard ONP 10.1.15, Independent
Verification.
This revision will be completed by September 30, 1990.
}}

Revision as of 03:19, 17 August 2019

Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification
ML18033B493
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/20/1990
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008240083
Download: ML18033B493 (5)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RI DS)CESSION NBR: 9008240083 DOC.DATE: 90/08/20 NOTARIZED:

NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Suppls response to violations noted in Insp Repts 50 259/90 14 I 50 260/90 14 6 50 296/90 14~DISTRIBUTION CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: B.Wilson,S.

BLACK 1 Copy each to: S.Black,B.WILSON 1 Copy each to: S.Black,B.WILSON DOCKET 05000259 05000260 05000296 D'I/05000259 A 05000260 05000296 RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DEIIB DEDRO t NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DIR-8&02 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 RECIPIENT I D CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU I D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 SRGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29 A D D TENNESSEE VALLEY AUTHORITY CHATTANOOGA.

TENNESSEE 37401 6N 38A Lookout Place AUG 20 1990 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

In the I1atter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROVilS FERRY NUCLEAR PLANT (BFN)-NRC IiNSPECTION REPORT 50-259, 260, 296/90-14-SUPPLEi~lENTAL RESPONSE TO NOTICE OF VIOLATIOiN On June 14, 1990, NRQ issued the subject inspection report which cited TVA with a violation for failure to perform independent verification.

In its response to the violation dated July 13, 1990, TVA noted it was evaluating the generic impact of this concern and committed to provide a supplemental response by August 24, 1990.This letter reports on the generic actions that TVA has taken to address independent verification.

The enclosure provides a listing of commitments being made in this letter.In order to stan.ardize independent verification activities TVA has developed a corporate level standard, STD-10.1.15, Independent Verification.

This standard establishes requirements for determining when independent verification is required and for performing independent verification.

This standard will be implemented at BFN by September 30, 1990, through a revision to Site Director Standard Practice (SDSP)3.15, Independent Verification.

BFNi procedures will be evaluated against the criteria in this revised SDSP during the two-year procedure review and change process.In summary, TVA considers that the revision of SDSP 3.15 will establish consistent use of independent verification activities at BFN such that plant systems and components are controlled in a manner that supports safe and reliable operation.

Very truly yours, TE&lESSEE VALLEY AUTHORITY 0 9C108'=0'sit".Enclosure cc: See page 2>1.10:=:>401.18'OP AQOC:K I.J i~Iark O.i~ledford, Vice resident Nuclear Technology and Licensing An Equal Opportunity Emptoyer~je/I/I 0'

U.S.Nuclear Regulatory Commission cc (Enclosure):

Ns.S.C.Black, Deputy Director Project Directorate II-4 U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Haryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama ,35609-2000 Thierry i'1.Ross, Project i'ianager U.S.Nuclear Regu1atory Commission One White Flint, North 11555 Rockville Pike Rockvi,lie,.'Iaryland 208 Hr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory Commission Region II 101 51arietta Street, NW, Suite 2900 Atlanta, Georgia 30323

'EilCLOSURE Site Director Standard Practice 3.15, Independent Verification, will be revised to implement corporate standard ONP 10.1.15, Independent Verification.

This revision will be completed by September 30, 1990.