ML17228A953: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/30/1994
| issue date = 11/30/1994
| title = Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
| title = Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
| author name = SAGER D A, WHITE C D
| author name = Sager D, White C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PRIORI EY 1 ACCELERATED RIDS PROCESSING)
{{#Wiki_filter:PRIORI EY ACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9412220102 DOC.DATE: 94/11/30 NOTARIZED:
ACCESSION NBR:9412220102                   DOC.DATE:     94/11/30       NOTARIZED: NO         DOCKET  N FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power                         & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power                         & Light Co. 05000389 AUTH. NAME               AUTHOR AFFILIATION WHITE,C.D.               Florida       Power & Light Co.
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION WHITE,C.D.
SAGER,D.A.             Florida       Power & Light Co.
Florida Power&Light Co.SAGER,D.A.
RECIP.NAME               RECIPIENT AFFILIATION
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000335 05000389


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Nov 1994 for Saint Lucie Units.1&2.W/941209 ltr.DISTRIBUTION CODE: IE24D-COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report, (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS~i FCE C~NTER 01 RR/DOPS/OECB EXTERNAL LITCO BRYCE i J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 iNOTE TO ALL"RIDS" RECIPIENT'TS:
Monthly operating repts               for   Nov 1994     for Saint Lucie Units .1
PLEASE HELP US TO REDUCE iVASTE!COYTACT'I'I IE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37<EXT.504-033)TO ELIXflbiATE
              & 2.W/941209       ltr.
'iOUR iAiIL PROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi"I'l: I:.D!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20  
DISTRIBUTION CODE: IE24D             - COPIES RECEIVED:LTR             ENCL     SIZE:
~r~PPII December 9I 1994 L-94-308 10 CFR 50.36 Florida Powor 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555*Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, 486 D.A.Vice St.L er sident e Plant DAS/CDW cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident'Inspector, USNRC, St.Lucie Plant Attachments 9412220i02
TITLE: Monthly Operating Report, (per Tech Specs)
'P4ii30 PDR ADQCK 05000335 PDR an FPL Group cYmp'hrlf I
NOTES:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO UNIT.DATE COMPLETED BY: TELEPHONE:
RECIPIENT                 COPIES                RECIPIENT          COPIES ID CODE/NAME              LTTR ENCL          ID   CODE/NAME     LTTR ENCL PD2-2 PD                         1    1        NORRIS,J                1    1 INTERNAL: ACRS                             10    10        AEOD/SPD/RRAB          1    1
50-335 St.Lucie g1 12/09/94 C.D.White (407)468-4248 MONTH DAY 11/01/94 11/02/94 11/03/94 11/04/94 11/05/94 11/06/94 11/07/94 11/08/94 11/09/94 11/10/94 11/11/94 11/12/94 11/13/94 11/14/94 11/15/94 11/16/94 11/17/94 11/18/94 11/19/94 11/2'0/94 11/21/94 11/22/94 11/23/94 11/24/94 11/25/94 11/26/94 11/27/94 11/28/94 11/29/94 11/30/94 NOVEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)-4-4-3-3-3-3-3-3-3-4-4-3-3-3-3-3-3-3-4-4-3-4-4-4-8-26-30-29-34 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 12/09/94 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 l.UNIT NAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: NOVEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9 POWER LEVEL TO WH I CH RESTRI CTED i I F ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNXT AVAILABILITY FACTOR 21.CAPACXTY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USXNG DER NET)23.UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER 27, 720 41'0.0 0.0 0.0 0 0-5045 0.0 0.0 0.0 0.0 0.0 1994.8016 7049.7 0.0 6864.9 0.0 18104409 5920270 5594915 85.6 85.6 83.2 84.1 4.3 157296.0 122579.8 205.3 121219.7 39.3 313869710 103533560 97853277 77.1 77.1 76.4 75.8 4.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/1/94  
        ~i RR/DOPS/OECB FCE C~NTER       01           1 1
~~UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 12/09/94 COMPLETED BY: C.D.WHITE TELEPHONE:
1 1
(407)468-4248 REPORT MONTH N VEMBER I 4 No.Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report&#xb9;System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 21 941027 0.0 N/A RC FUELXX Unit 1 remained off line for Cycle refueling.
NRR/DISP/PIPB RGN2 1
F Forced S Scheduled Reason A-EAtuipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training dc License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Insuuctions for Preparation of Data Entry Shccts Licensee Event Report (LER)File (NUREG41 6 1)Exhibit I-Same Source
1 1
1 EXTERNAL    LITCO BRYCE i J H                1     1         NOAC                    1     1 NRC PDR                          1     1 RECIPIENT'TS:
iNOTE TO ALL"RIDS" PLEASE HELP US TO REDUCE iVASTE! COYTACT'I'IIE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37 <EXT. 504- 033 ) TO ELIXflbiATE'iOUR iAiILPROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi   "I'l:I:.D!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                       20     ENCL   20
 
~
Florida Powor 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128
            ~
r                                  December 9I 1994                              L-94-308 10 CFR 50.36 PPII U. S.       Nuclear Regulatory Commission Attn:       Document Control Desk*
Washington,           DC 20555 Re:       St. Lucie Units       1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions on                   this information, please contact us   ~
Very     truly     yours, 486 D. A.           er Vice           sident St. L         e Plant DAS/CDW cc:       Stewart D. Ebneter, Regional Administrator, Region Senior Resident'Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 9412220i02 'P4ii30 PDR       ADQCK     05000335 PDR an FPL Group cYmp'hrlf
 
I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO     50-335 UNIT.          St. Lucie g1 DATE          12/09/94 COMPLETED BY:  C. D. White TELEPHONE:    (407) 468-4248 MONTH   NOVEMBER  1994 DAY       AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 11/02/94               -4 11/03/94               -4 11/04/94               -3 11/05/94               -3 11/06/94               -3 11/07/94               -3 11/08/94               -3 11/09/94               -3 11/10/94               -3 11/11/94               -4 11/12/94               -4 11/13/94               -3 11/14/94               -3 11/15/94               -3 11/16/94               -3 11/17/94               -3 11/18/94               -3 11/19/94               -3 11/2'0/94             -4 11/21/94               -4 11/22/94               -3 11/23/94               -4 11/24/94               -4 11/25/94               -4 11/26/94               -8 11/27/94             -26 11/28/94             -30 11/29/94             -29 11/30/94             -34
 
OPERATING DATA REPORT DOCKET NO           50 335 DATE               12/09/94 COMPLETED BY     C. D. WHITE TELEPHONE       407/468/4248 OPERATING STATUS
: l. UNIT NAME: ST. LUCIE     UNIT 1
: 2. REPORTING PERIOD: NOVEMBER 1994
: 3. LICENSED THERMAL POWER (MWT):                   2700
: 4. NAMEPLATE RATING (GROSS MWE):                   850
: 5. DESIGN ELECTRICAL RATING (NET MWE):             830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9                     I POWER LEVEL TO WH CH RESTRI CTED i I F ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          720      8016        157296.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL               41 '    7049.7      122579.8
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0        205.3
: 14. HOURS GENERATOR ON-LXNE                             0.0    6864.9      121219.7
: 15. UNIT RESERVE SHUTDOWN HOURS                         0.0        0.0          39.3
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                   0 18104409    313869710
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                 0  5920270    103533560
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)             -5045    5594915      97853277
: 19. UNXT SERVICE FACTOR                                 0.0      85.6          77.1
: 20. UNXT AVAILABILITYFACTOR                            0.0      85.6          77.1
: 21. CAPACXTY FACTOR (USING MDC NET)                     0.0      83.2          76.4
: 22. CAPACITY FACTOR (USXNG DER NET)                     0.0      84.1          75.8
: 23. UNIT FORCED OUTAGE RATE                             0.0        4.3            4.0 24 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER   27, 1994.
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:       12/1/94
 
                                                                                                                                                          ~ ~
UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.:                   50-335 UNIT NAME:                     ST LUCIE UNIT I DATE:                         12/09/94 COMPLETED BY:                 C. D. WHITE TELEPHONE:                     (407) 468-4248 REPORT MONTH N VEMBER I                             4 No.         Date Type Duration   Reason~       Method of           Licensee     System Code'omponent                         Cause   & Corrective (Hours)                    Shutting        Event Report                    Codes                        Action to Down                &#xb9;                                                Prevent Recurrence Reactor 21         941027       0.0                                           N/A         RC           FUELXX   Unit 1 remained   off line for Cycle refueling.
F Forced                         Reason                                        Method                                    Exhibit G - Insuuctions for S Scheduled                     A - EAtuipment failure (explain)               1 - Manual                                Preparation of Data Entry B - Maintenance or Test                       2 - Manual Scram                          Shccts Licensee Event Report C - Refueling                                 3 - Automatic Scram                      (LER) File (NUREG41 6 1)
D - Regulatory restriction                     4 - Continued E - Operator Training dc License Examination   5 - Load Reduction F - Administrative                              9 - Other (Explain)                       Exhibit I - Same Source G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
Op OPERATING EXPERIENCE DOCKET N00~UNIT: DATE: COMPLETED BY: TELEPHONE:
Op OPERATING EXPERIENCE DOCKET N00 ~   50-335 UNIT:          St. Lucie   g1 DATE:          12/09/94 COMPLETED BY:  C. D. White TELEPHONE:      (407) 468-4248 REPORT MONTH   NOVEMBER   1994 Unit 1 remained off line during the month of November for its Cycle 13 Refueling Outage.
50-335 St.Lucie g1 12/09/94 C.D.White (407)468-4248 REPORT MONTH NOVEMBER 1994 Unit 1 remained off line during the month of November for its Cycle 13 Refueling Outage.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.  
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
'\~)~(~I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT DATE~COMPLETED BY: TELEPHONE:
 
50-389 St.Lucie g2 12/09/94 C.D.White (407)468-4248 MONTH NOVEMBER 1994 DAY 11/01/94 11/02/94 11/03/94 11/04/94 11/05/94 11/06/94 11/07/94 11/08/94 11/09/94 11/10/94 11/11/94 11/12/94 11/13/94 11/14/94 11/15/94 11/16/94 11/17/94 11/18/94 11/19/94 11/20/94 11/21/94 11/22/94 11/23/94 11/24/94 11/25/94 11/26/94 11/27/94 11/28/94 11/29/94 11/30/94 AVERAGE DAILY POWER LEVEL (MWe-Net)841 840 839 841 842 840 840 841 841 841 839 839 842 843 843 841 841 845 844 844 843 843 842 845 837 843 838 837 831 831 1 4~
      \ ~
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 12/09/94 COMPLETED BY CD D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: NOVEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRXCAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12'UMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABXLITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 720.0 0.0 720.0 0.0 1943676 638300 605226 100.0 100.0 100.2 101.3 0.0 8016 6360.1 0.0 6227.7 0.0 16289454 5304650 4999317 77.7 77.7 74.3 75.1 2.6 99193.0 83523.7 0.0 82123.0 0.0 213250379 70814200 66900488 82.8 82.8 81.3 81.7 7.0 2 5 I F SHUT DOWN AT END OF REPORT PER IOD~EST I MATED DATE OF STARTUP UNIT SHt JTDOWNS AZK)POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
)~(
50-389 r ST LUCIE UNIT 2 12/09/94 C.D.WHITE-(407)468-4248 REPORT MONTH N VEMBER I 4 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee System Event Report Code'omponent Codes Cause&Corrective Action to Prevent Recurrence Unit 2 operated at essentially full power during the entire month of November.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Rcfucling D-Regulatory restriction E-Operator Training A License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Liccnscc Event Report (LER)File (NUREG4161)
~ I
Exhibit 1-Same Source
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:   50-389 UNIT          St. Lucie g2 DATE~          12/09/94 COMPLETED BY:  C. D. White TELEPHONE:    (407) 468-4248 MONTH NOVEMBER   1994 DAY       AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94             841 11/02/94             840 11/03/94             839 11/04/94             841 11/05/94             842 11/06/94             840 11/07/94             840 11/08/94             841 11/09/94             841 11/10/94             841 11/11/94             839 11/12/94             839 11/13/94             842 11/14/94             843 11/15/94             843 11/16/94             841 11/17/94             841 11/18/94             845 11/19/94             844 11/20/94             844 11/21/94             843 11/22/94             843 11/23/94             842 11/24/94             845 11/25/94             837 11/26/94             843 11/27/94             838 11/28/94             837 11/29/94             831 11/30/94             831
 
1 4 ~
 
OPERATING DATA REPORT DOCKET NO           50 - 389 DATE               12/09/94 COMPLETED BY   CD D. WHITE TELEPHONE     407/468/4248 OPERATING STATUS
: 1. UNIT NAME: ST. LUCIE     UNIT 2
: 2. REPORTING PERIOD: NOVEMBER 1994
: 3. LICENSED THERMAL POWER (MWT):                 2700
: 4. NAMEPLATE RATING (GROSS MWE):                   850
: 5. DESIGN ELECTRXCAL RATING (NET MWE):             830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):       882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):         839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET   MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                         720      8016          99193.0 12 'UMBER   OF HOURS REACTOR WAS CRITICAL           720.0    6360.1        83523.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0            0.0
: 14. HOURS GENERATOR ON-LXNE                         720.0    6227.7        82123.0
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0            0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)         1943676  16289454      213250379
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       638300  5304650      70814200
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         605226  4999317      66900488
: 19. UNIT SERVICE FACTOR                             100.0      77.7          82.8
: 20. UNIT AVAILABXLITYFACTOR                        100.0      77.7          82.8
: 21. CAPACITY FACTOR (USING MDC NET)                 100.2      74.3          81.3
: 22. CAPACITY FACTOR (USING DER NET)                 101.3       75.1           81.7
: 23. UNIT FORCED OUTAGE RATE                          0.0       2.6           7.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25  IF SHUT DOWN AT END OF REPORT PER IOD ~   I EST MATED DATE OF STARTUP
 
UNIT SHt JTDOWNS AZK) POWER REDUCTIONS DOCKET NO.:                 50-389               r UNIT NAME:                  ST LUCIE UNIT 2 DATE:                        12/09/94 COMPLETED BY:                C. D. WHITE-TELEPHONE:                    (407) 468-4248 REPORT MONTH N VEMBER I                           4 No.         Date Type Duration   Reason       Method of         Licensee   System Code'omponent                           Cause   & Corrective (Hours)                    Shutting      Event Report                    Codes                        Action to Down                                                                Prevent Recurrence Reactor Unit 2 operated at essentially full power during the entire month of November.
F Forced                       Reason                                      Method                                    Exhibit G - Instructions for S Scheduled                     A - Equipment failure (explain)             1 - Manual                                Preparation of Data Entry B - Maintenance or Test                     2 - Manual Scram                          Sheets Liccnscc Event Report C - Rcfucling                               3 - Automatic Scram                      (LER) File (NUREG4161)
D - Regulatory restriction                   4 - Continued E - Operator Training A License Examination 5 - Load Reduction F - Administrative                           9 - Other (Explain)                       Exhibit 1 - Same Source G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE 50-389 St.Lucie g2 12/09/94 C.D.White (407)468-4248 REPORT MONTH NOVEMBER 1994 Unit 2 operated at essentially full power during the entire month of November.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}
OP OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT:        St. Lucie g2 DATE:        12/09/94 COMPLETED BY: C. D. White TELEPHONE      (407) 468-4248 REPORT MONTH   NOVEMBER 1994 Unit 2 operated at essentially full power during the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}

Latest revision as of 12:33, 4 February 2020

Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
ML17228A953
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1994
From: Sager D, Charlotte White
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-308, NUDOCS 9412220102
Download: ML17228A953 (13)


Text

PRIORI EY ACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9412220102 DOC.DATE: 94/11/30 NOTARIZED: NO DOCKET N FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WHITE,C.D. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1994 for Saint Lucie Units .1

& 2.W/941209 ltr.

DISTRIBUTION CODE: IE24D - COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report, (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1

~i RR/DOPS/OECB FCE C~NTER 01 1 1

1 1

NRR/DISP/PIPB RGN2 1

1 1

1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 RECIPIENT'TS:

iNOTE TO ALL"RIDS" PLEASE HELP US TO REDUCE iVASTE! COYTACT'I'IIE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37 <EXT. 504- 033 ) TO ELIXflbiATE'iOUR iAiILPROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi "I'l:I:.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

~

Florida Powor 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128

~

r December 9I 1994 L-94-308 10 CFR 50.36 PPII U. S. Nuclear Regulatory Commission Attn: Document Control Desk*

Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, 486 D. A. er Vice sident St. L e Plant DAS/CDW cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident'Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 9412220i02 'P4ii30 PDR ADQCK 05000335 PDR an FPL Group cYmp'hrlf

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-335 UNIT. St. Lucie g1 DATE 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 11/02/94 -4 11/03/94 -4 11/04/94 -3 11/05/94 -3 11/06/94 -3 11/07/94 -3 11/08/94 -3 11/09/94 -3 11/10/94 -3 11/11/94 -4 11/12/94 -4 11/13/94 -3 11/14/94 -3 11/15/94 -3 11/16/94 -3 11/17/94 -3 11/18/94 -3 11/19/94 -3 11/2'0/94 -4 11/21/94 -4 11/22/94 -3 11/23/94 -4 11/24/94 -4 11/25/94 -4 11/26/94 -8 11/27/94 -26 11/28/94 -30 11/29/94 -29 11/30/94 -34

OPERATING DATA REPORT DOCKET NO 50 335 DATE 12/09/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

l. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: NOVEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9 I POWER LEVEL TO WH CH RESTRI CTED i I F ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 157296.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 41 ' 7049.7 122579.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LXNE 0.0 6864.9 121219.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 18104409 313869710
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 5920270 103533560
18. NET ELECTRICAL ENERGY GENERATED (MWH) -5045 5594915 97853277
19. UNXT SERVICE FACTOR 0.0 85.6 77.1
20. UNXT AVAILABILITYFACTOR 0.0 85.6 77.1
21. CAPACXTY FACTOR (USING MDC NET) 0.0 83.2 76.4
22. CAPACITY FACTOR (USXNG DER NET) 0.0 84.1 75.8
23. UNIT FORCED OUTAGE RATE 0.0 4.3 4.0 24 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER 27, 1994.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/1/94

~ ~

UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 12/09/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH N VEMBER I 4 No. Date Type Duration Reason~ Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down ¹ Prevent Recurrence Reactor 21 941027 0.0 N/A RC FUELXX Unit 1 remained off line for Cycle refueling.

F Forced Reason Method Exhibit G - Insuuctions for S Scheduled A - EAtuipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG41 6 1)

D - Regulatory restriction 4 - Continued E - Operator Training dc License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

Op OPERATING EXPERIENCE DOCKET N00 ~ 50-335 UNIT: St. Lucie g1 DATE: 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 REPORT MONTH NOVEMBER 1994 Unit 1 remained off line during the month of November for its Cycle 13 Refueling Outage.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

\ ~

)~(

~ I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT St. Lucie g2 DATE~ 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 841 11/02/94 840 11/03/94 839 11/04/94 841 11/05/94 842 11/06/94 840 11/07/94 840 11/08/94 841 11/09/94 841 11/10/94 841 11/11/94 839 11/12/94 839 11/13/94 842 11/14/94 843 11/15/94 843 11/16/94 841 11/17/94 841 11/18/94 845 11/19/94 844 11/20/94 844 11/21/94 843 11/22/94 843 11/23/94 842 11/24/94 845 11/25/94 837 11/26/94 843 11/27/94 838 11/28/94 837 11/29/94 831 11/30/94 831

1 4 ~

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 12/09/94 COMPLETED BY CD D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: NOVEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRXCAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 99193.0 12 'UMBER OF HOURS REACTOR WAS CRITICAL 720.0 6360.1 83523.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LXNE 720.0 6227.7 82123.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1943676 16289454 213250379
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 638300 5304650 70814200
18. NET ELECTRICAL ENERGY GENERATED (MWH) 605226 4999317 66900488
19. UNIT SERVICE FACTOR 100.0 77.7 82.8
20. UNIT AVAILABXLITYFACTOR 100.0 77.7 82.8
21. CAPACITY FACTOR (USING MDC NET) 100.2 74.3 81.3
22. CAPACITY FACTOR (USING DER NET) 101.3 75.1 81.7
23. UNIT FORCED OUTAGE RATE 0.0 2.6 7.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 IF SHUT DOWN AT END OF REPORT PER IOD ~ I EST MATED DATE OF STARTUP

UNIT SHt JTDOWNS AZK) POWER REDUCTIONS DOCKET NO.: 50-389 r UNIT NAME: ST LUCIE UNIT 2 DATE: 12/09/94 COMPLETED BY: C. D. WHITE-TELEPHONE: (407) 468-4248 REPORT MONTH N VEMBER I 4 No. Date Type Duration Reason Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down Prevent Recurrence Reactor Unit 2 operated at essentially full power during the entire month of November.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Liccnscc Event Report C - Rcfucling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training A License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT: St. Lucie g2 DATE: 12/09/94 COMPLETED BY: C. D. White TELEPHONE (407) 468-4248 REPORT MONTH NOVEMBER 1994 Unit 2 operated at essentially full power during the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.