Line 3: Line 3:
| issue date = 12/31/1994
| issue date = 12/31/1994
| title = Monthly Operating Repts for Dec 1994 for St Lucie Units 1 & 2.W/950113 Ltr
| title = Monthly Operating Repts for Dec 1994 for St Lucie Units 1 & 2.W/950113 Ltr
| author name = ROGERS J A, SAGER D A
| author name = Rogers J, Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PRIQRITY 1 (ACCELERATED l<IDS PROCI'.SSIX(~
{{#Wiki_filter:PRIQRITY (ACCELERATED l<IDS PROCI'.SSIX(~
''REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9501240238 DOC.DATE: 94/12/31 NOTARIZED:
1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.
ACCESSION NBR:9501240238                     DOC.DATE:       94/12/31       NOTARIZED: NO           DOCKET g FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power                               & Light Co.       05000335 50-389 St. Lucie Plant, Unit 2, Florida Power                               & Light Co.       05000389 AUTH. NAME                 AUTHOR AFFILIATION ROGERS,J.A.               Florida       Power & Light Co.
Florida Power&Light Co.SAGER,D.A.
SAGER,D.A.                 Florida     Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000335 05000389
RECIP.NAME                 RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Dec 1994 for St Lucie Units 1&2.W/950113 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL:~CR~E-CENT NRR/DOPS/OECB EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 YOTE TO ALL"RIDS" RECIPIEYTS:
Monthly operating repts                     for Dec 1994       for St Lucie Units   1 &
PLEASE HELP US TO REDUCE O',KSTE!COYTACT'I'HE DOC!'ifEYT CONTROL DESk, ROOhf Pl-37 (EXT.504-~083)fO ELIif IRATE YOI.'R XAML'ROif DIS'I'RIB U I'IOY, LIS'I'S I'OR DOCI.'Xf L'X'I'S YOI: DOY,"I'I.'I D!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 r~'~J P.O.Box 128, Ft.Pierce, FL 34954-0128 January 13, 1995 L-95-17 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the December, 1994, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, D.A.Vice St.Lu ger sident e Plant DAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments air/,g 9501240238 941231 PDR ADOCK 05000335 R PDR an FPL Group company r@P)
2.W/950113           ltr.
V I il r  
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR                                   ENCL     SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT                   COPIES                  RECIPIENT            COPIES ID    CODE/NAME              LTTR ENCL            ID     CODE/NAME     LTTR ENCL PD2-2 PD                             1        1      NORRIS,J                  1    1 INTERNAL: ~CR                                 10        10      AEOD/SPD/RRAB              1    1
          ~E-CENT                               1        1      NRR/DISP/PIPB              1    1 NRR/DOPS/OECB                       1        1      RGN2                      1    1 EXTERNAL: LITCO BRYCE,J H                       1       1     NOAC                       1     1 NRC PDR                              1       1 YOTE TO ALL"RIDS" RECIPIEYTS:
PLEASE HELP US TO REDUCE O',KSTE! COYTACT'I'HE DOC! 'ifEYTCONTROL DESk, ROOhf Pl-37 (EXT. 504-~083 ) fO ELIifIRATE YOI.'R XAML'ROif DIS'I'RIB U I'IOY, LIS'I'S I'OR DOCI.'XfL'X'I'S YOI: DOY,"I'I.'I D!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                           20     ENCL     20
 
r'
  ~
~J
 
P.O. Box 128, Ft. Pierce, FL 34954-0128 January 13, 1995                     L-95-17 10 CFR 50.36 U. S.       Nuclear Regulatory Commission Attn:       Document Control Desk Washington,           DC   20555 Re:       St. Lucie Units         1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the December, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions on             this information, please contact us ~
Very     truly yours, D. A.           ger Vice           sident St. Lu e Plant DAS/GRM cc:       Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments air /,g 9501240238 941231 PDR R
ADOCK 05000335 PDR                                                               r@P) an FPL Group company
 
V I
il r


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE 50-335 St.Lucie g1 DOCKET NO.: UNIT0 DATE COMPLETED BY: J.A.Rogers TELEPHONE!
OF OPERATING EXPERIENCE DOCKET NO.:  50-335 UNIT0        St. Lucie g1 DATE COMPLETED BY: J.A. Rogers TELEPHONE!     ( 4 07 ) 4 68-4 157 REPORT MONTH December   1994 Unit 1 commenced operation for its Cycle 14 on December 1, 1994.
(4 07)4 68-4 157 REPORT MONTH December 1994 Unit 1 commenced operation for its Cycle 14 on December 1, 1994.The Unit operated at reduced power for post refueling outage reactor physics testing and power escalation testing through December 4, 1994.The Unit then operated at greater than 80 percent power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.  
The Unit operated at reduced power for post refueling outage reactor physics testing and power escalation testing through December 4, 1994. The Unit then operated at greater than 80 percent power for the remainder of the month.
~~
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET HO.: UNIT: DATE COMPLY TZZ)BY: 50-335 St.Luc3.e N1 01/04/95 Z.A.Ragexs (407)468-4157 12/01/94 12/02/94 12/03/94 12/04/94 12/05/94 12/06/94 12/07/94 12/08/94 12/09/94 12/10/94 12/11/94 12/12/94 12/13/94 12/14/94 12/15/94 12/16/94 12/17/94 12/18/94 12/19/94 12/20/94 12/21/94 12/22/94 12/23/94 12/24/94 12/25/94 12/26/94 12/27/94 12/28/94 12/29/94 12/30/94 12/31/94 AVfWMZ DAILY POWER LZiVlKs (axe-Net)69" 203 436 775 814 816 816 816 819 832 849 849 850 851 848 854 852 852 852 854 854 854 854 857 857 856 856 857 857 857 857 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 1/6/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT HAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: DECEMBER 1994 3.LICENSED THERHAL POWER (MWT): 2700 4.NAHEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUH DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIOHS, IF ANY: HONTHLY-YTD-CUMULATIVE 11'OURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REAC'IOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (HWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (M'WH)'19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER HEXT 6 MOHTHS: 744 744.0 0.0 737.1 0.0 1864030 616450 583626 99.1 99.1 93.5 94.5 0'8760 7793.7 0.0 7602.0 0.0 19968440 6536720 6178541 86.8 86.8 84.1 85.0 3.9 158040.0 123323.8 205.3 121956.9 39.3 315733741 104'150010 98436903 77.2 77.2 76.5 75.9 4.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:  
 
\w t I lt UNIT SHUT.DOWNS AND POWH<REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: COMPLETED BY: J.A.ROGERS TELEPHONE:
~ ~
(407)468/4157.REPORT MONIH No.Date Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report&#xb9;System Code4 Component Code'ause&Corrective Action to Prevent Recurrence 21 22 941027 941201 941202 0.0 0.0 0.0 RC FUELXX RC FUELXX RC FUELXX Unit remained ofHine for cycle refueling.
AVERAGE DAILY UNIT POWER LEVEL DOCKET   HO.:   50-335 UNIT:            St. Luc3.e N1 DATE            01/04/95 COMPLY  TZZ) BY: Z.A. Ragexs (407) 468-4157 AVfWMZ DAILY POWER LZiVlKs (axe-Net) 12/01/94         69" 12/02/94       203 12/03/94       436 12/04/94       775 12/05/94       814 12/06/94       816 12/07/94       816 12/08/94       816 12/09/94       819 12/10/94       832 12/11/94       849 12/12/94       849 12/13/94       850 12/14/94       851 12/15/94       848 12/16/94       854 12/17/94       852 12/18/94       852 12/19/94       852 12/20/94       854 12/21/94       854 12/22/94       854 12/23/94       854 12/24/94       857 12/25/94       857 12/26/94       856 12/27/94       856 12/28/94       857 12/29/94       857 12/30/94       857 12/31/94       857
Unit at 25%popover for physics testing and turbine overspeed trip test.Unit experiencing popover escalation physics testing.F Forced S Scheduled Ibason A-Equipment failure (explain)8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Tmining&License Exatnination F-Administntive G-Operational Enor (Explain)H-Other (Explain)Method I-Manual 2-Manual Sctam 3-Automatic Scmn 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Prepamtion of Data Entry Sheets Licensee Event Report (LER)File (NUREG4161)
 
Exhibit I-Same Source 4 I f' A r  
OPERATING DATA REPORT DOCKET NO         50 - 335 DATE                 1/ 6/95 FPL LICENSING GROUP   - JUNO TELEPHONE     407/694/4432 OPERATING STATUS
: 1. UNIT HAME: ST. LUCIE       UNIT 1
: 2. REPORTING PERIOD: DECEMBER 1994
: 3. LICENSED THERHAL POWER (MWT):                 2700
: 4. NAHEPLATE RATING (GROSS MWE):                   850
: 5. DESIGN ELECTRICAL RATING (NET MWE):             830
: 6. MAXIMUH DEPENDABLE CAPACITY (GROSS MWE):         872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS   NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIOHS, IF ANY:
HONTHLY   -YTD-   CUMULATIVE 11 'OURS   IN REPORT PERIOD:                        744      8760      158040.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL             744.0    7793.7    123323.8
: 13. REAC'IOR RESERVE SHUTDOWN HOURS                     0.0        0.0        205.3
: 14. HOURS GENERATOR ON-LINE                           737.1    7602.0    121956.9
: 15. UNIT RESERVE SHUTDOWN HOURS                         0.0        0.0          39.3
: 16. GROSS THERMAL ENERGY GENERATED (HWH)           1864030  19968440    315733741
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)         616450    6536720    104'150010
: 18. NET ELECTRICAL ENERGY GENERATED (M'WH)           583626    6178541    98436903
'19. UNIT SERVICE FACTOR                               99.1      86.8          77.2
: 20. UNIT AVAILABILITYFACTOR                          99.1      86.8          77.2
: 21. CAPACITY FACTOR (USING MDC NET)                 93.5      84.1          76.5
: 22. CAPACITY FACTOR (USING DER NET)                 94.5       85.0           75.9
: 23. UNIT FORCED OUTAGE RATE                          0 '        3.9           4.0
: 24. SHUTDOWNS SCHEDULED OVER HEXT  6 MOHTHS  :
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD,   ESTIMATED DATE OF STARTUP:
 
      \
w t
I lt
 
UNIT SHUT. DOWNS AND POWH< REDUCTIONS DOCKET NO.:                   50-335 UNIT NAME:                   ST LUCIE UNIT I DATE:
COMPLETED BY:                 J.A. ROGERS TELEPHONE:                   (407) 468/4157       .
REPORT MONIH No.         Date Duration (Hours)
Reason'ethod of Shutting Reactor'icenseeEvent Report System Code4 Code'ause Component                          & Corrective Action to Down              &#xb9;                                                Prevent Recurrence 21         941027   0.0                                                     RC         FUELXX   Unit remained ofHine for cycle refueling.
22        941201  0.0                                                    RC          FUELXX    Unit at 25% popover for physics testing and turbine overspeed trip test.
941202  0.0                                                    RC          FUELXX  Unit experiencing   popover escalation physics testing.
F Forced                   Ibason                                      Method                                  Exhibit G - Instructions for S Scheduled               A - Equipment failure (explain)             I - Manual                              Prepamtion of Data Entry 8 - Maintenance or Test                     2 - Manual Sctam                        Sheets Licensee Event Report C - Refueling                               3 - Automatic Scmn                      (LER) File (NUREG4161)
D - Regulatory restriction                   4 - Continued E - Operator Tmining & License Exatnination 5 - Load Reduction F - Administntive                           9 - Other (Explain)                     Exhibit I - Same Source G - Operational Enor (Explain)
H - Other (Explain)
 
4 I f' A
r


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO+!UNIT: DATE: COMPLETED BY: TELEPHONE:
OP OPERATING EXPERIENCE DOCKET NO+!   50-389, UNIT:          St. Lucie g2 DATE:
50-389, St.Lucie g2 J.A.Rogers (407)468-4157 REPORT MONTH December 1994 Unit 2 operated at greater than 80 percent power until December 11, 1994, when power was reduced for condenser waterbox cleaning.At the completion of the waterbox cleaning on December 16, 1994, the Unit operated at greater than 80 percent power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.'6, there were no challenges to the PORVs or safety valves during the report period.  
COMPLETED BY:  J. A. Rogers TELEPHONE:      (407) 468-4157 REPORT MONTH     December 1994 Unit 2   operated at greater than 80 percent power until December 11, 1994, when power was reduced     for condenser waterbox cleaning. At the completion of the waterbox cleaning on December 16, 1994, the Unit operated at greater than 80 percent power for the remainder of the month.
'I IP S'h AVERAGE DAILY UNIT POWER LEVER DOCKET NO.: UNIT: DATE QCMPLZrT EX)BY 50-389 St.Lucie 02 01/04/95 aT.A.ROGERS (407)468/4157 12/01/94 12/02/94 12/03/94 12/04/94 12/05/94 12/06/94 12/07/94 12/08/94 12/09/94 12/10/94 12/11/94 12/12/94 12/13/94 12/14/94 12/15/94 12/16/94 12/17/94 12/18/94 12/19/94 12/20/94 12/21/94 12/22/94 12/23/94 12/24/94 12/25/94 12/26/94 12/27/94 12/28/94 12/29/94 12/30/94 12/31/94 AVERAGE DAILY POWER LEVZL (MNe-Net)830 834 832 831 829 833 833 833 835 832 796 561 614 647 703 808 849 848 850 851 850 851 852 853 853 854 848 854 854 854 853 1~4 l OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 1/6/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: DECEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUHBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LIHE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GEHERATED (MWH)18.NET ELECTRICAL ENERGY GENERATEO (MWH)19.UNIT SERVICE FACTOR 20'NIT AVAiLABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MOH'THS: 744 744.0 0.0 744.0 0.0 1944054 639510 605392 100.0 100.0 97.0 98.0 0.0 8760 7104.1 0.0 6971.7 0.0 18233509 5944160 5604709 79.6 79.6 76.3 77.1 2.3 99937.0 84267.7 0.0 82867.0 0.0 215194434 71453710 67505880 82.9 82.9 81.4 81.8 7.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
In accordance with the requirements of Technical Specification 6.9.1.'6, there were no challenges to the PORVs or safety valves during the report period.
wr I l'~'II UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
 
l 50-389 ST LUCIE Ui4T 2 01/04/95 J.A.ROGERS (407)468/415./,'EPORT MONTH No., Type'uration Reason'ethod of Shutting Down Reactor'icensee Event Report System Code'omponent Code'ause&Conective Action to Prevent Recurrence 13 941211 0.0 B N/A HF HfEXCH Unit 2 at reduced power for waterbox cleaning.F Forced S Scheduled Reason A-Erluipmnt failure (explain)8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)Method I-Manua!2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Rcport (LER)File (NUREGOI61)
'I IP S'
Exhibit I-Same Source WV Ig~~E r'}}
h
 
AVERAGE DAILY UNIT POWER LEVER DOCKET   NO.:   50-389 UNIT:          St. Lucie   02 DATE            01/04/95 QCMPLZrT EX) BY aT.A.ROGERS (407) 468/4157 AVERAGE DAILY POWER LEVZL (MNe-Net) 12/01/94       830 12/02/94       834 12/03/94       832 12/04/94       831 12/05/94       829 12/06/94       833 12/07/94       833 12/08/94       833 12/09/94       835 12/10/94       832 12/11/94       796 12/12/94       561 12/13/94       614 12/14/94       647 12/15/94       703 12/16/94       808 12/17/94       849 12/18/94       848 12/19/94       850 12/20/94       851 12/21/94       850 12/22/94       851 12/23/94       852 12/24/94       853 12/25/94       853 12/26/94       854 12/27/94       848 12/28/94       854 12/29/94       854 12/30/94       854 12/31/94       853
 
1
~ 4 l
 
OPERATING DATA REPORT DOCKET NO           50 - 389 DATE                 1/ 6/95 FPL LICENSING GROUP     - JUNO TELEPHONE       407/694/4432 OPERATING STATUS
: 1. UNIT   NAME: ST. LUCIE     UNIT 2
: 2. REPORTING PERIOD: DECEMBER 1994
: 3. LICENSED THERMAL POWER (MWT):                     2700
: 4. NAMEPLATE RATING (GROSS MWE):                     850
: 5. DESIGN ELECTRICAL RATING (NET MWE):               830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):           882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):             839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3     THROUGH   7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                            744      8760        99937.0
: 12. NUHBER OF HOURS REACTOR WAS CRITICAL               744.0    7104.1      84267.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                       0.0        0.0            0.0
: 14. HOURS GENERATOR ON-LIHE                           744.0    6971.7      82867.0
: 15. UNIT RESERVE SHUTDOWN HOURS                         0.0        0.0            0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)             1944054  18233509    215194434
: 17. GROSS ELECTRICAL ENERGY GEHERATED (MWH)           639510    5944160      71453710
: 18. NET ELECTRICAL ENERGY GENERATEO (MWH)             605392    5604709      67505880
: 19. UNIT SERVICE FACTOR                               100.0      79.6          82.9 20 'NIT   AVAiLABILITYFACTOR                          100.0      79.6          82.9
: 21. CAPACITY FACTOR (USING MDC NET)                     97.0      76.3          81.4
: 22. CAPACITY FACTOR (USING DER NET)                     98.0      77. 1          81.8
: 23. UNIT FORCED OUTAGE RATE                             0.0        2.3            7.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6   MOH'THS :
: 25. IF SHUT DOWN AT END OF REPORT PERIOD,     ESTIMATED DATE OF STARTUP:
 
wr I
l
    ~ '
II
 
l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                   50-389 UNIT NAME:                   ST LUCIE Ui4T 2 DATE:                          01/04/95 COMPLETED BY:                J.A.ROGERS TELEPHONE:                    (407) 468/415./,
MONTH                                                                                        'EPORT No.,             Type'uration   Reason'ethod of Shutting     Event Report Reactor'icensee System Code'omponent   Code'ause                   & Conective Action to Down                                                          Prevent Recurrence 13       941211         0.0         B                           N/A         HF         HfEXCH Unit 2 at reduced power for waterbox cleaning.
Reason                                      Method                              Exhibit G - Instructions for F Forced A - Erluipmnt failure (explain)             I - Manua!                          Preparation of Data Entry S Scheduled 8 - Maintenance or Test                     2 - Manual Scram                    Sheets Licensee Event Rcport C - Refueling                               3 - Automatic Scram                  (LER) File (NUREGOI61)
D - Regulatory restriction                   4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative                           9 - Other (Explain)                 Exhibit I - Same Source G - Operational Error (Explain)
II - Other (Explain)
 
WV Ig ~ ~
E r
'}}

Latest revision as of 12:33, 4 February 2020

Monthly Operating Repts for Dec 1994 for St Lucie Units 1 & 2.W/950113 Ltr
ML17228A984
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/31/1994
From: Rogers J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-17, NUDOCS 9501240238
Download: ML17228A984 (19)


Text

PRIQRITY (ACCELERATED l<IDS PROCI'.SSIX(~

1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9501240238 DOC.DATE: 94/12/31 NOTARIZED: NO DOCKET g FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Dec 1994 for St Lucie Units 1 &

2.W/950113 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ~CR 10 10 AEOD/SPD/RRAB 1 1

~E-CENT 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS/OECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE O',KSTE! COYTACT'I'HE DOC! 'ifEYTCONTROL DESk, ROOhf Pl-37 (EXT. 504-~083 ) fO ELIifIRATE YOI.'R XAML'ROif DIS'I'RIB U I'IOY, LIS'I'S I'OR DOCI.'XfL'X'I'S YOI: DOY,"I'I.'I D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

r'

~

~J

P.O. Box 128, Ft. Pierce, FL 34954-0128 January 13, 1995 L-95-17 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the December, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, D. A. ger Vice sident St. Lu e Plant DAS/GRM cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments air /,g 9501240238 941231 PDR R

ADOCK 05000335 PDR r@P) an FPL Group company

V I

il r

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT0 St. Lucie g1 DATE COMPLETED BY: J.A. Rogers TELEPHONE! ( 4 07 ) 4 68-4 157 REPORT MONTH December 1994 Unit 1 commenced operation for its Cycle 14 on December 1, 1994.

The Unit operated at reduced power for post refueling outage reactor physics testing and power escalation testing through December 4, 1994. The Unit then operated at greater than 80 percent power for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

~ ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET HO.: 50-335 UNIT: St. Luc3.e N1 DATE 01/04/95 COMPLY TZZ) BY: Z.A. Ragexs (407) 468-4157 AVfWMZ DAILY POWER LZiVlKs (axe-Net) 12/01/94 69" 12/02/94 203 12/03/94 436 12/04/94 775 12/05/94 814 12/06/94 816 12/07/94 816 12/08/94 816 12/09/94 819 12/10/94 832 12/11/94 849 12/12/94 849 12/13/94 850 12/14/94 851 12/15/94 848 12/16/94 854 12/17/94 852 12/18/94 852 12/19/94 852 12/20/94 854 12/21/94 854 12/22/94 854 12/23/94 854 12/24/94 857 12/25/94 857 12/26/94 856 12/27/94 856 12/28/94 857 12/29/94 857 12/30/94 857 12/31/94 857

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 1/ 6/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT HAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: DECEMBER 1994
3. LICENSED THERHAL POWER (MWT): 2700
4. NAHEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUH DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIOHS, IF ANY:

HONTHLY -YTD- CUMULATIVE 11 'OURS IN REPORT PERIOD: 744 8760 158040.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7793.7 123323.8
13. REAC'IOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LINE 737.1 7602.0 121956.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (HWH) 1864030 19968440 315733741
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 616450 6536720 104'150010
18. NET ELECTRICAL ENERGY GENERATED (M'WH) 583626 6178541 98436903

'19. UNIT SERVICE FACTOR 99.1 86.8 77.2

20. UNIT AVAILABILITYFACTOR 99.1 86.8 77.2
21. CAPACITY FACTOR (USING MDC NET) 93.5 84.1 76.5
22. CAPACITY FACTOR (USING DER NET) 94.5 85.0 75.9
23. UNIT FORCED OUTAGE RATE 0 ' 3.9 4.0
24. SHUTDOWNS SCHEDULED OVER HEXT 6 MOHTHS  :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

\

w t

I lt

UNIT SHUT. DOWNS AND POWH< REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE:

COMPLETED BY: J.A. ROGERS TELEPHONE: (407) 468/4157 .

REPORT MONIH No. Date Duration (Hours)

Reason'ethod of Shutting Reactor'icenseeEvent Report System Code4 Code'ause Component & Corrective Action to Down ¹ Prevent Recurrence 21 941027 0.0 RC FUELXX Unit remained ofHine for cycle refueling.

22 941201 0.0 RC FUELXX Unit at 25% popover for physics testing and turbine overspeed trip test.

941202 0.0 RC FUELXX Unit experiencing popover escalation physics testing.

F Forced Ibason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) I - Manual Prepamtion of Data Entry 8 - Maintenance or Test 2 - Manual Sctam Sheets Licensee Event Report C - Refueling 3 - Automatic Scmn (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Tmining & License Exatnination 5 - Load Reduction F - Administntive 9 - Other (Explain) Exhibit I - Same Source G - Operational Enor (Explain)

H - Other (Explain)

4 I f' A

r

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO+! 50-389, UNIT: St. Lucie g2 DATE:

COMPLETED BY: J. A. Rogers TELEPHONE: (407) 468-4157 REPORT MONTH December 1994 Unit 2 operated at greater than 80 percent power until December 11, 1994, when power was reduced for condenser waterbox cleaning. At the completion of the waterbox cleaning on December 16, 1994, the Unit operated at greater than 80 percent power for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.'6, there were no challenges to the PORVs or safety valves during the report period.

'I IP S'

h

AVERAGE DAILY UNIT POWER LEVER DOCKET NO.: 50-389 UNIT: St. Lucie 02 DATE 01/04/95 QCMPLZrT EX) BY aT.A.ROGERS (407) 468/4157 AVERAGE DAILY POWER LEVZL (MNe-Net) 12/01/94 830 12/02/94 834 12/03/94 832 12/04/94 831 12/05/94 829 12/06/94 833 12/07/94 833 12/08/94 833 12/09/94 835 12/10/94 832 12/11/94 796 12/12/94 561 12/13/94 614 12/14/94 647 12/15/94 703 12/16/94 808 12/17/94 849 12/18/94 848 12/19/94 850 12/20/94 851 12/21/94 850 12/22/94 851 12/23/94 852 12/24/94 853 12/25/94 853 12/26/94 854 12/27/94 848 12/28/94 854 12/29/94 854 12/30/94 854 12/31/94 853

1

~ 4 l

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 1/ 6/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: DECEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 8760 99937.0
12. NUHBER OF HOURS REACTOR WAS CRITICAL 744.0 7104.1 84267.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LIHE 744.0 6971.7 82867.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1944054 18233509 215194434
17. GROSS ELECTRICAL ENERGY GEHERATED (MWH) 639510 5944160 71453710
18. NET ELECTRICAL ENERGY GENERATEO (MWH) 605392 5604709 67505880
19. UNIT SERVICE FACTOR 100.0 79.6 82.9 20 'NIT AVAiLABILITYFACTOR 100.0 79.6 82.9
21. CAPACITY FACTOR (USING MDC NET) 97.0 76.3 81.4
22. CAPACITY FACTOR (USING DER NET) 98.0 77. 1 81.8
23. UNIT FORCED OUTAGE RATE 0.0 2.3 7.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MOH'THS  :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

wr I

l

~ '

II

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE Ui4T 2 DATE: 01/04/95 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 468/415./,

MONTH 'EPORT No., Type'uration Reason'ethod of Shutting Event Report Reactor'icensee System Code'omponent Code'ause & Conective Action to Down Prevent Recurrence 13 941211 0.0 B N/A HF HfEXCH Unit 2 at reduced power for waterbox cleaning.

Reason Method Exhibit G - Instructions for F Forced A - Erluipmnt failure (explain) I - Manua! Preparation of Data Entry S Scheduled 8 - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREGOI61)

D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

II - Other (Explain)

WV Ig ~ ~

E r

'