IR 05000483/2016401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2016401)
| title = Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2016401)
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Diya F
| addressee name = Diya F
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " August 31, 2016  
{{#Wiki_filter:ust 31, 2016


Mr. Fadi Diya, Senior Vice President
==SUBJECT:==
 
NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2016401)
and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
 
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2016401)


==Dear Mr. Diya:==
==Dear Mr. Diya:==
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Callaway Plant. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Callaway Plant. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.


The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
Line 35: Line 32:
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.


Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1  
Sincerely,
 
/RA/
Division of Reactor Safety  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Enclosure:
 
Inspection Plan cc w/encl:
Docket No. 50-483 License No. NPF-30  
Mr. Daniel Buscher Acting Manager, Security Ameren Missouri Callaway Energy Center Fulton, MO 65251 cc w/o encl:
 
Electronic Distribution for Callaway Plant
===Enclosure:===
Inspection Plan  
 
cc w/encl: Mr. Daniel Buscher Acting Manager, Security  
 
Ameren Missouri Callaway Energy Center Fulton, MO 65251  
 
cc w/o encl: Electronic Distribution for Callaway Plant
}}
}}

Latest revision as of 14:43, 30 October 2019

Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2016401)
ML16242A082
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/2016
From: Mark Haire
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2016401
Download: ML16242A082 (4)


Text

ust 31, 2016

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2016401)

Dear Mr. Diya:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Callaway Plant. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Enclosure:

Inspection Plan cc w/encl:

Mr. Daniel Buscher Acting Manager, Security Ameren Missouri Callaway Energy Center Fulton, MO 65251 cc w/o encl:

Electronic Distribution for Callaway Plant