ML23080A138

From kanterella
Jump to navigation Jump to search
Notification of Inspection (NRC Inspection Report 05000483/2023003) and Request for Information
ML23080A138
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/21/2023
From: Nicholas Hernandez
NRC/RGN-IV/DORS/OB
To: Diya F
Ameren Missouri
References
IR 2023003
Download: ML23080A138 (8)


See also: IR 05000483/2023003

Text

March 21, 2023

Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Ameren Missouri

Callaway Plant

8315 County Road 459

Steedman, MO 65077

SUBJECT:

CALLAWAY PLANT - NOTIFICATION OF INSPECTION (NRC INSPECTION

REPORT 05000458/2023003) AND REQUEST FOR INFORMATION

Dear Fadi Diya:

During the week of May 22, 2023, three inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at Callaway Plant, Unit 1, using NRC Inspection Procedure 71111.11B, Licensed

Operator Requalification Program.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. To minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into three groups:

The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared.

The second group (Section B of the enclosure) identifies the information the inspectors

will need upon arrival at the site.

The third group (Section C of this enclosure) identifies the items which are necessary to

close out the inspection and are usually sent a few weeks after the inspectors have left

the site.

It is important that all these documents are up to date and complete to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

F. Diya

2

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Thomas Forland of your Regulatory Affairs

organization, and Ben Bruemmer of your training organization. Our inspection dates are subject

to change based on your updated schedule of examination activities. If there are any questions

about this inspection or the material requested, please contact me, Nicholas Hernandez, at (817)

200-1118 (Nicholas.Hernandez@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Nicholas Hernandez, Operations Engineer

Operations Branch

Division of Reactor Safety

Docket No. 05000483

License No. NPF-30

Enclosure:

Initial Request for Information

Biennial Requalification Inspection

Signed by Hernandez, Nicholas

on 03/21/23

ML23080A138

SUNSI Review NH

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: DDY

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

OE:DORS/OB

BC:DORS/OB

NAME

Nhernandez

Hgepford

SIGNATURE

/RA/

/RA/

DATE

03/21/23

03/21/23

Enclosure

Initial Request for Information

Biennial Requalification Inspection

Callaway Plant, Unit 1

Inspection Report: 05000483/2023003

Inspection Dates:

May 22, 2023 - May 26, 2023

Inspection Procedure:

IP 71111.11B, Licensed Operator Requalification

Program

Lead Inspector:

Nicholas Hernandez, Operations Engineer

A. The following information is requested to support inspection preparation activities.

These items are listed by section as they appear in the inspection module (i.e. 03.04a,

03.04b, etc.). Requested materials can be sent via a file hosting service (preferably

Box) or in an electronic format on CD/DVD to arrive at the Region IV office no later

than April 21, 2023.

CD/DVD to: US Nuclear Regulatory Commission, Region IV

ATTN: Nicholas Hernandez

1600 E. Lamar Blvd

Arlington, TX 76011

General Requests:

List of licensed operators (SRO & RO) by crew (operating & staff)

Training and Operations Department organization charts (with qualified LOR

evaluators identified)

Procedures that identify process for revising and maintaining LO continuing training

program up to date

List of outstanding LOR program changes

List of plant events and industry operating experience incorporated into LOR

program since last BRQ

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

Last 2 years of Simulator Review Committee (or equivalent) meeting minutes

Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes

A summary report of all condition reports related to operator actions/errors in the

control room

2

Any revised requalification training that was based on licensed operator performance

issues

03.04a: Biennial Requalification Written Examinations

The current and approved biennial written examination schedule

The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspectors arrival onsite.

All written examinations that have been approved for administration up to and

including the week before the inspectors are onsite. This will need to have adequate

password protection or double envelope protection if mailed via regular mail per

NUREG-1021.

The current requalification cycle examination methodology (sample plan)

03.04b: Annual Requalification Operating Tests

The schedule for the operating tests (JPMs & scenarios) to be given the week of May

22, 2023 (week inspectors are onsite)

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of May 22, 2023

Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection inspectors arrival onsite

All 2022 NRC required annual operating tests

Current requalification cycle operating test methodology (sample plan)

03.04c: Administration of an Annual Requalification Operating Test

All procedures used to administer the annual operating test

All procedures used to assess operator performance

All procedures that describe conduct of simulator training

All procedures used to test, operate, and maintain the simulator

03.04d: Requalification Examination Security

Submit any tracking tools that you use to prevent excessive overlap on the written

examinations and meet the intent of sampling all required topics on a periodic basis.

Submit any tracking tools that you use to prevent excessive overlap on the operating

tests and meet the intent of sampling all required malfunctions (including major

events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.

3

All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

List of all condition reports since the last biennial requalification inspection related to

examination security and overlap

03.04e: Remedial Training and Re-Examinations

List of remedial training conducted or planned since last requalification exam

(includes training provided to operators to enable passing requalification exam and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle)

Remediation plans (lesson plans, reference materials, and attendance

documentation)

03.04f: Operator License Conditions

All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

03.04g: Control Room Simulator

All simulator management and configuration procedures if not already provided

Simulator discrepancy report summary list for all open discrepancy reports and

summary list for those items closed since May 22, 2021.

Primary parameters tested to verify core physics parameters (such as moderator

temperature coefficient, integral rod worth)). The applicable reference graphs from

the plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

All simulator modification packages that are on hold, delayed, or not completed in the

last 2 years

A list of simulator modification packages completed in the last two-year window

4

B. The following information is requested to support the onsite inspection activities.

Requested materials should be available to the inspectors, either electronically or

hardcopy, upon site arrival on May 22, 2023.

03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written

Exam and Annual Requalification Operating Tests Quality

All operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week, if available

All results up to the day the inspectors leave the site

03.04f: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

03.04g: Control Room Simulator Performance

Simulator discrepancies from May 22, 2021 - May 21, 2023. This should include all

open and closed simulator discrepancy reports, including the

documentation/justification for closure

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available)

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant

All current model deficiencies, including FSAR vs design differences in the simulator

(any documentation on this)

Summary list of modifications from May 22, 2021 - May 21, 2023

Plant modifications (both hardware and software) completed on the simulator by due

date from May 22, 2021 - May 21, 2023

Simulator differences lesson plan used in training (current to May 21, 2023)

The complete book of all simulator annual performance test packages (usually in a

single book but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI standard requirements.

5

All test packages used to verify core physics parameters (such as moderator

temperature coefficient and integral rod worth). The applicable reference graphs from

the plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

All simulator tests, configuration management, and related documents available in

the room for inspectors to review. This includes training needs analysis packages,

Simulator Review Committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for simulator testing

C. Callaway Plant, Unit 1 is required to send the final results summary (see Table 1

below) and any remaining exams and operating tests that have not been reviewed to

the regional office lead inspector for this inspection for final review and comparison

against the Significance Determination Tools to communicate the exit results for the

inspection.

TABLE 1: EXAMINATION RESULTS

1. Total number of licensed operators.

2. Number of licensed operators administered a requalification

examination required by 10 CFR 55.59(a).

3. Number of individual licensed operators who failed any portion of a

requalification examination (written, JPM, or individual simulator

scenario failures).

4. Divide line 3 by line 2 to obtain the individual requalification

examination failure rate. Line 3/Line 2.

%

5. Number of crews administered simulator scenarios as part of a

requalification examination required by 10 CFR 55.59(a).

6. Number of crews who performed unsatisfactorily on the

simulator scenarios.

7. Divide line 6 by line 5 to obtain the crew simulator scenario

failure rate. Line 6/Line 5.

%