ML15244B092

From kanterella
Jump to navigation Jump to search
Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015401)
ML15244B092
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/01/2015
From: Mark Haire
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2015401
Download: ML15244B092 (4)


See also: IR 05000483/2015401

Text

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

September 1, 2015

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY

PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT

NUMBER 05000483/2015401)

Dear Mr. Diya:

On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant.

The results of that review have been transmitted to you separately in a publicly available

assessment letter. This letter informs you of the NRCs plans for future security-related

inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through

June 30, 2017. The inspections listed during the last nine months of the inspection plan are

tentative and may be revised at the next semiannual performance review. The NRC provides

the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as soon as possible to discuss changes to the

inspection plan should circumstances warrant any changes. Routine force-on-force inspections

are conducted approximately every 3 years. You will be notified by separate correspondence

8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we

must balance that goal with the more immediate need of ensuring the continued safety and

secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled.

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

F. Diya -2-

in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified

Non-Safeguards Information, a copy of this letter and its enclosure will not be available for

public inspection in either the NRC Public Document Room or the Publicly Available Records

(PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-483

License No. NPF-30

Enclosure:

Inspection Plan

cc w/encl:

Mr. Eric Olson

Manager, Security

Callaway Nuclear Plant

P.O. Office Box 620

Fulton, MO 65251

cc w/o encl:

Electronic Distribution for

Callaway Plant

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

F. Diya -2-

in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified

Non-Safeguards Information, a copy of this letter and its enclosure will not be available for

public inspection in either the NRC Public Document Room or the Publicly Available Records

(PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-483

License No. NPF-30

Enclosure:

Inspection Plan

cc w/encl:

Mr. Eric Olson

Manager, Security

Callaway Nuclear Plant

P.O. Office Box 620

Fulton, MO 65251

cc w/o encl:

Electronic Distribution for

Callaway Plant

Distribution:

See next page

ADAMS Accession Number: ML15244B092

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: MHaire Yes No Non-Publicly Available Sensitive RGN-002

OFFICE C:PSB1

NAME MHaire/dch

SIGNATURE /RA/

DATE 9/1/15

OFFICIAL RECORD COPY

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

Letter to Mr. Fadi Diya from Mark Haire, dated September 1, 2015

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY

PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT

NUMBER 05000483/2015401)

Electronic Distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Electronic Distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Shawn.Money@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)

ROPreports Resource

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION