ML17227A296: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/31/1992
| issue date = 01/31/1992
| title = Monthly Operating Repts for Jan 1992 for St Lucie Units 1 & 2.W/920218 Ltr
| title = Monthly Operating Repts for Jan 1992 for St Lucie Units 1 & 2.W/920218 Ltr
| author name = BREEN J J, SAGER D A
| author name = Breen J, Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DISTRJBUTION DEMONSTRATION SYSTEMREGULAT.INFORMATION DISTRIBUTIO SYSTEM(RIDS)Act,.ESSION NBR:920FACIL:50-335 St,50-389St.AUTH.NAMEBREEN,J.J.
{{#Wiki_filter:ACCELERATED DISTRJBUTION DEMONSTRATION SYSTEM REGULAT .       INFORMATION DISTRIBUTIO     SYSTEM   (RIDS)
SAGER,D.A.
Act,.ESSION NBR:920                                                                      DOCKET FACIL:50-335 St, Lucie Plant, Unit 1, Florida Power                &  Light  Co.      05000335 50-389 St. Lucie Plant, Unit 2, Florida Power              a  Light  Co.      05000389 AUTH. NAME              AUTHOR AFFILIATION BREEN,J.J.              Florida Power 6 Light Co.
RECIP.NAME LuciePlant,Unit1,FloridaPower&LightCo.LuciePlant,Unit2,FloridaPoweraLightCo.AUTHORAFFILIATION FloridaPower6LightCo.FloridaPower&LightCo.RECIPIENT AFFILIATION DOCKET0500033505000389
SAGER,D.A.              Florida    Power & Light Co.
RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
MontcratingreptsforJan1992forStLucieUnits162.920218tr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR jENCL(TITLE:MonthlyOperating Report(perTechSpecs)NOTES:SIZE:RECIPIENT IDCODE/NAME PD2-2LANORRIS,JINTERNAL:
Mont              crating repts for Jan      1992  for St Lucie Units      1 6
ACRSAEOD/DSP/TPAB NRR/DOEA/OEAB RGN2COPIESLTTRENCL33111010111111RECIPIENT IDCODE/NAME PD2-2PDAEOD/DOANRR/JDLRQ PEB10G5'TER01COPIESLTTRENCL11111111EXTERNAL:
: 2. 920218    tr.
EGGGBRYCE,J.H NSIC1111NRCPDR11NOTETOALL"RIDS"RECIPIENTS:
DISTRIBUTION CODE: IE24D              COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) j  ENCL(    SIZE:
PLEASEHELPUSTOREDUCEWASFEICONTACTTHEDOCUMENTCONTROLDESKROOMPl-37(EXT.20079)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDlTOTALNUMBEROFCOPIESREQUIRED:
NOTES:
LTTR24ENCL24 P.O.Bex128,Ft.Pierce,FL34954-0128 February18,1992L-92-3310CFR50-36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Gentlemen:
RECIPIENT              COPIES          RECIPIENT           COPIES ID CODE/NAME              LTTR ENCL      ID  CODE/NAME       LTTR ENCL PD2-2 LA                      3    3    PD2-2  PD              1    1 NORRIS,J                      1    1 INTERNAL: ACRS                            10    10    AEOD/DOA                1    1 AEOD/DSP/TPAB                 1    1    NRR/JDLRQ  PEB10      1    1 NRR/DOEA/OEAB                 1    1      G 5'TER      01      1    1 RGN2                          1    1 EXTERNAL: EGGG BRYCE,J.H                   1    1    NRC PDR                1    1 NSIC                          1    1 NOTE TO ALL "RIDS" RECIPIENTS:
Re:St.LucieUnits1and2DocketNos.50-335and50-389Monthl0eratinReortAttachedaretheJanuary1992Operating StatusandSummaryofOperating Experience ReportsforSt.LucieUnits1and2.Shouldyouhaveanyquestions onthisinformation, pleasecontactus~Verytrulyyouxs,D.A.gerVicersidentSt.LiePlantDAS.JJBkwcc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantAttachments DAS/PSL$617-929p02p~03rrr7 rrr20131PDRADOCK05000335~R''i!'I''DR8nFPLGroupcompany 3'fiA~l~
PLEASE HELP US TO REDUCE WASFEI CONTACT THE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR                24  ENCL    24
~~AVERAGEDAILYUNITPOMERLEVELDOCKETNO~50-335DATECOMPLETED BYJ..BreenTELEPHONE 407468-4248MONTHJANUARY1992DAYAVERAGEDAILYPOSERLEVEL(MWe-Net) 1/1/921/2/921/3/921/4/921/5/921/6/921/7/921/8/921/9/921/10/921/11/921/12/921/13/921/14/921/15/921/16/921/17/921/18/921/19/921/20/921/21/921/22/921/23/921/24/921/25/921/26/921/27/921/28/921/29/921/30/921/31/92861863863865866866866865866866865867866865865866869869869869871871870867868868869868866865867 OPERATING DATAREPORTOPL'R*TING STATUSDQCf(ETNO50-33'ATEFEg$9532COMPLETED BYJ.J,BREENTELEPI-lQNE 407/468/4248 1.UNXTNAME+ST+LUCIEUNXT12iREPORTING PERIOD:JANUARY19923.LICENSEDTHERMALPOWER(MWT):27004+NAMEPLATE RATING(GROSSMWE)i850DESIGNELECTRXCAL RATXNG(NETMWE):83e6+MAX:KMUMDEPENDABLE CAPACITY(GROSSMWE>o8727.MAXIMUMDEPENDABLE CAPACITY(NETMWE)l8398IFCHANGESOCCURXNC*PACITYRATXNGS(ITEMSNUMBER3THROUGH7)SINCEL*STREPORT~GIVEREASONS'+POWERLEVELTQWHXCHRESTRICTED'F ANY(NETMWE>ieiREASONSFORRESTRICTIONS rIFANYiMONTHLY-YTD-CUMULATIVE h11+HOURSINREPORTPERXOD:12+NUMBEROFHOURSREACTORWASCPITIC*L13,REhCTORRESERVESHUTDOWNHOURS14+HOURSGENERATOR ON-LINE15.UNITRESERVESHUTDOWNHOURSlb.GROSSTHERMALENERGYGENERATED (MWH)17,GRO.SELECTRICAL ENERGYGENERATED (MWH>18.NETELECTRXCAL ENERGYGENERATED (MWH>19iUN:KTSERVICEFACTOR2e.UN:KTAVAILABILITY FACTOR21,CAPACITYF*CTOI'USING MDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGER*TE24.SHUTDOWNS SCHEDULED OVERNEXT6MONTHS+744744ieO.e744.0etc2eo9eo8677950644796ieeieioo.eie3i31en.neiernn744ieewe7nn,eewe20o9ee867795e644796100.0100.e103.3104.40.013248e+eioe853.6205.3995'39'<<J9t3257736260 8=e1077e8032849275.475+575.e74ienii,25.XFSl-lUTDOWNATFNDOFREPORTPERIODESTXM*TED DATEOFST*RTUP' J
UNITSHUTDOWNS ANDPOWERREDUCTIONS DDDBBTND.
~233UNITNAMESTLUCIEUNIT4DATEU1JZCOMPLETED BYJ.JBREENTELEPHDNB
~868248REPORTMONTHJANUARY12No.DateTypeDuration(Hours)ReasonsMethodofShuttingDownReactorLicenseeEventReportSystemCode'omponent CodeCause&Corrective ActiontoPreventRecurrence TheaveragedailypowerforUnit1forthemonthofJanuarywas100%.FFomcdSScheduled ReasonA-Equipment failure(explain)
B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTrainingdcLicenseExamination F-Administrative G-Operational Error(Expalin)
H-Other(Explain)
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Olher(Explain)
ExhibitG-Instructions forpreparation ofDataEntrySheetsLicensccEventReport(LER)File(NUREG4161)
Exhibit1-SameSourcetelssrFPL


1~~~SUMMARYOFOPERATING EXPERIENCE DOCKETN0050-335UNITSt.Lucie1DATECOMPLETED BYJ.J.BreenTELEPHONE 407468-4248REPORTMONTHJANUARY1992ForthemonthofJanuarytheaveragedailypowerforUnit1was1004.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.
P.O. Bex 128, Ft. Pierce, FL 34954-0128 February 18, 1992 L-92-33 10 CFR 50-36 U. S. Nuclear Regulatory Commission Attn:    Document Control Desk Washington,          DC    20555 Gentlemen:
AVERAGEDAILYUNITPOWERLEVELDOCKETNO~50-389UNITSt.Lucre2DATECOMPLETED BYJ.J.BreenMONTHJANUARY1992DAYAVERAGEDAILYPOWERLEVEL(Mve-Net) 1/921/2/921/3/921/4/921/5/921/6/921/7/921/8/921/9/921/10/921/11/921/12/921/13/92'1/14/921/15/921/16/921/17/921/18/921/19/921/20/921/21/921/22/921/23/921/24/921/25/921/26/921/27/921/28/921/29/921/30/921/31/92862864864865865865864863863860860861859859859860860860858857823548723745871791871871878869870 OPERATXHG DATAREPORTQPERATXNG STATUSDQCI'ETNO50-389DATEPgg49>99t)COMPLETED BYJJ.BREFHTELEPHONE 407/468/4248 UNXTNAME+SToLIJCXEUNXT22oRl::PORTXHG PERXOD:iJAHUARYi9923.LXCENSEDTHERMAII='OHER<MHT)f2708NAMEPLATE RATXHG(GROSSMHE):850DESXGHIl:LECTRXCAL RAT:I:HG<HETMHE):83<)6+MAXXMUMDEPENDABI ECAI='ACXTY (GROSSMHE)o..8827+MAXXMUMDLPEHDABLE C*PACXTY(HETMHE)l8398.XFCHANGESOCCURXNCAPACXTYIATXHGS<XTEMSNUMBEI3THROUGH7)SXNCELASTREPORTGXVEREASONS;9iPOHERLEVELTQRHXCIIRESTRXCTFDr XFAHY(HETMWE)ie.REASONSFORRESTRXCTXONS XFANY:MONTHLY-YTD-CIJMULATXVE iii4~i3ti4.i5ii6+i7i8.i9.20.2ii22>23.24+IHOURS1NREPORTPERXODlNUMBEROFIIQURSREACTORHASCR1TXCALREACTORRESERVESHUTDOWNHOURSI-IOURSGENERATOR ON-L1HEUNXTRESERVESHUTDOHNIHOURSGROSSTHERMALENERGYGENERATED (MHI-I)GROSSELECTR1CAL ENERGYGENERATED (MHH)NETELECTRXCAL EHFRGYGEHERATED (MHH)UHXTSERVXCEFACTORIJHXTAVAXLABXLXTY FACTORCAPACXTYFACTOR(USXNGMDCNET)CAPACXTYFACTOR(USXNGDERNET)UH1TFORCEDOUTAGERATEtSHIJTDOHHS SCHEDULED QVFRNEXT6MOHTIISREFUELXNG SCHEDULED 4/20/92FQR63DAYS744744iO0.0744iO0.0i96296066ne80625877i00.0Roe+0ie0.3i0i.40'744744.0ewe744+00+0i962960660088625877i00eOi00oei00i3iOi~40i074377,e64364i3eiO63348+3O.ei66075566 53859ee5238872485<28&1285i45@i25.XFSl-IUTDQHHATEHDQFREPOR'I;PERXQDESTXMATED DATEOFITARTUPl S1e~l'4'I STLCIEUNITSHUTDOWNS AI'43POWERREDUCTIONS 0008BT062~60UNITNAMEDATECOMPLETED BYJJ.BREENTBLBPHBNB L404468<248REPORTMONTHJAARY192No.DateTypeDuration(Hours)Reason~MethodofLicenseeShuttingEventReportDownReactorSystemCodeComponent Code'ause
Re:    St. Lucie Units          1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1992 Operating Status                          and Summary          of Operating Experience Reports for St. Lucie Units                      1 and      2.
&Corrective ActiontoPreventRecurrence 9201219201229201239201230.00.00.00.0BBN/AN/AN/AN/AHHVALVEXHF3OCXXXXHFHTEXCHUnit2atapproximately 669opowerforfeedwater heaterinletvalverepair.Unit2heldatapproximately 85%powerforwaterboxcleaning.
Should you have any questions on              this information, please contact us  ~
Whileat85%powerthe2ATurbineCoolingWaterHeatExchanger wasdeclaredoutofservice.Unit2thenreducedpowerduetohighturbinebearingoiltemperature.
Very    truly youxs, D. A.        ger Vice r sident St. L ie Plant DAS.JJB kw cc:    Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL      $ 617-92
Unit2heldatapproximately 85%powerforwaterboxcleaning.
~
FForecdSScheduled ReasonA-Equipment failure(explain)
PDR R
B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTrainingdcLicenseExamination F-Administrative G-Operational Error(Expalin)
            ''DR 9p02p~03rrr7 rrr20131
H-Other(Explain)
    ''i!'IADOCK 05000335 8n FPL Group company
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
 
ExhibitG-Instructions forPreparation ofDataEntrySheetsLiccnsceEventReport(LER)File(NUREG4161)
3 'fiA~l~
Exhibit1-SameSource SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-389UNITSt.Lucie2DATECOMPLETED BYZ.Z.BreenREPORTMONTHJANUARY1992Unit2startedthemonthatfullpowerandremainedthereuntilJanuary22,1992.OnJanuary22,1992,Unit2wasatapproximately 664powerforfeedwater heaterinletvalverepair;uponcompletion ofrepairUnit2ascendedinpowerandwasheldatapproximately 854forwaterboxcleaning.
~ ~
OnJanuary23,1992,whileat854powerthe2ATurbineCoolingWaterHeatExchanger wasdeclaredoutofserviceandUnit2startedtoreducepowerduetohighturbinebearingoiltemperature.,
AVERAGE DAILY UNIT POMER LEVEL DOCKET NO ~  50-335 DATE COMPLETED BY  J.  . Breen TELEPHONE  407 468-4248 MONTH  JANUARY    1992 DAY AVERAGE    DAILY POSER LEVEL (MWe-Net) 1/ 1/92          861 1/ 2/92          863 1/ 3/92          863 1/ 4/92          865 1/ 5/92          866 1/ 6/92          866 1/ 7/92          866 1/ 8/92          865 1/ 9/92          866 1/10/92          866 1/11/92          865 1/12/92          867 1/13/92            866 1/14/92            865 1/15/92            865 1/16/92            866 1/17/92          869 1/18/92          869 1/19/92          869 1/20/92          869 1/21/92          871 1/22/92          871 1/23/92          870 1/24/92          867 1/25/92          868 1/26/92          868 1/27/92          869 1/28/92          868 1/29/92          866 1/30/92          865 1/31/92          867
AfteraboutanhourtheTurbineCoolingHeatExchanger wasbackinserviceandUnit2ascendedinpower;theUnitwasthenheldatapproximately 854powerforwaterboxcleaning.
 
OnJanuary25,1992,Unit2wasat1004powerandtheaveragedailypowerremainedabove804fortherestofthemonth.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.}}
OPERATING DATA REPORT DQCf(ET NO          50 -
FEg $ 9 532 33'ATE COMPLETED BY      J. J, BREEN TELEPI-lQNE      407/468/4248 OPL'R*TING STATUS
: 1. UNXT NAME+ ST+ LUCIE        UNXT 1 2 i REPORTING PERIOD: JANUARY 1992
: 3. LICENSED THERMAL POWER ( MWT ):                    2700 4+ NAMEPLATE RATING (GROSS MWE) i                      850 DESIGN ELECTRXCAL RATXNG (NET MWE):                83e 6+ MAX:KMUM DEPENDABLE CAPACITY (GROSS MWE>o            872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) l              839 8 IF CHANGES OCCUR XN C*PACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)
SINCE L*ST REPORT ~ GIVE REASONS
                                        '+
POWER  LEVEL TQ WHXCH RESTRICTED'F ANY (NET      MWE>
ie i REASONS FOR RESTRICTIONS r IF ANY i MONTHLY      - YTD-  CUMULATIVE h
11+ HOURS IN REPORT    PERXOD:                          744          rnn      13248e+e 12+ NUMBER OF HOURS    REACTOR WAS CPITIC*L              744 ie        744ie      ioe853.6 13, REhCTOR RESERVE    SHUTDOWN HOURS                      O.e          ewe        205.3 14+ HOURS GENERATOR    ON-LINE                          744.0        7nn,e      995'39 '
: 15. UNIT    RESERVE SHUTDOWN HOURS                          etc          ewe          <<J9t3 lb. GROSS THERMAL ENERGY GENERATED (MWH)              2eo9eo8      20o9ee8    257736260 17, GRO. S ELECTRICAL ENERGY GENERATED (MWH>            677950      67795e      8=e1077e
: 18. NET ELECTRXCAL ENERGY GENERATED (MWH>              644796      644796      80328492 19 i UN:KT SERVICE FACTOR                                ieeie        100.0          75.4 2e. UN:KT AVAILABILITYFACTOR                            ioo.e        100.e          75+5 21, CAPACITY F*CTOI'USING MDC NET)                      ie3i3        103.3          75.e
: 22. CAPACITY FACTOR (USING DER NET)                      1en.n        104.4          74ie
: 23. UNIT FORCED OUTAGE R*TE                                eie          0.0            nii
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6      MONTHS  +
,25. XF Sl-lUT DOWN AT FND OF REPORT PERIOD      ESTXM*TED DATE OF ST*RTUP'
 
J UNIT SHUTDOWNS AND POWER REDUCTIONS DDDBBTND.                    ~233 UNIT NAME                    ST LUCIE UNIT 4 DATE                                    U1JZ COMPLETED BY                  J. J BREEN TELEPHDNB                  ~868        248 REPORT MONTH JANUARY                        1    2 No.        Date Type Duration  Reasons        Method of          Licensee    System Code'omponent                      Cause    & Corrective (Hours)                    Shutting      Event Report                    Code                    Action to Down                                                              Prevent Recurrence Reactor The average daily power for Unit 1 for the month of January    was 100 %.
F Fomcd                        Reason                                        Method                                Exhibit G - Instructions for S Scheduled                    A - Equipment failure (explain)                1 - Manual                            preparation of Data Entry B - Maintenance or Test                        2 - Manual Scram                      Sheets Licenscc Event Report C - Refueling                                  3 - Automatic Scram                  (LER) File (NUREG4161)
D - Regulatory restriction                    4 - Continued E - Operator Training dc License Examination  5 - Load Reduction F - Administrative                            9 - Olher (Explain)                  Exhibit 1 - Same Source G - Operational Error (Expalin)
H - Other (Explain) tel ssr FPL
 
~
1~
  ~
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET N00    50-335 UNIT  St. Lucie    1 DATE COMPLETED BY  J.J. Breen TELEPHONE    407  468-4248 REPORT MONTH  JANUARY  1992 For the month of January the average  daily  power  for Unit  1 was 1004.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-389 UNIT  St. Lucre  2 DATE COMPLETED BY  J.J. Breen MONTH  JANUARY    1992 DAY AVERAGE DAILY POWER LEVEL (Mve-Net) 1/92          862 1/ 2/92          864 1/ 3/92          864 1/ 4/92          865 1/ 5/92          865 1/ 6/92          865 1/ 7/92          864 1/ 8/92          863 1/ 9/92          863 1/10/92            860 1/11/92            860 1/12/92            861 1/13/92           859
  '1/14/92            859 1/15/92            859 1/16/92            860 1/17/92            860 1/18/92            860 1/19/92            858 1/20/92          857 1/21/92            823 1/22/92          548 1/23/92            723 1/24/92          745 1/25/92          871 1/26/92          791 1/27/92          871 1/28/92          871 1/29/92          878 1/30/92          869 1/31/92          870
 
OPERATXHG DATA REPORT DQCI'ET NO            50  389 DATE              Pgg 4 9 >99t)
COMPLETED BY      J  J. BREFH TELEPHONE        407/468/4248 QPERATXNG STATUS UNXT NAME+ STo LIJCXE        UNXT 2 2o  Rl::PORTXHG PERXOD: iJAHUARY i992
: 3. LXCENSED THERMAI I='OHER <MHT)f                  2708 NAMEPLATE RATXHG (GROSS MHE):                     850 DESXGH Il:LECTRXCAL RAT:I:HG <HET MHE):           83<)
6+   MAXXMUM DEPENDABI E CAI='ACXTY (GROSS MHE)o . . 882 7+   MAXXMUM DLPEHDABLE C*PACXTY (HET MHE)l            839
: 8. XF CHANGES OCCUR XN CAPACXTY I ATXHGS <XTEMS NUMBEI      3 THROUGH    7)
SXNCE LAST REPORT    GXVE REASONS; 9i  POHER LEVEL TQ RHXCII RESTRXCTFDr XF AHY (HET MWE) ie. REASONS FOR RESTRXCTXONS      XF ANY:
MONTHLY     YTD-     CIJMULATXVE ii    IHOURS 1N REPORT PERXODl                          744        744            74377,e i 4 ~ NUMBER OF I IQURS REACTOR HAS CR1TXCAL            744iO      744.0          64364i3 i3 t  REACTOR RESERVE SHUTDOWN HOURS                        0.0        ewe            eiO i4. I-IOURS GENERATOR ON-L1HE                          744iO      744+0          63348+3 i5i    UNXT RESERVE SHUTDOHN IHOURS                          0.0        0+0            O.e i6+   GROSS THERMAL ENERGY GENERATED (MHI-I)         i962960      i962960      i66075566 i7    GROSS ELECTR1CAL ENERGY GENERATED (MHH)           66ne80      660088        5  3859ee i8. NET ELECTRXCAL EHFRGY GEHERATED (MHH)             625877      625877        52388724 i9. UHXT SERVXCE FACTOR                                i00.0      i00eO            85<2
: 20. IJHXT AVAXLABXLXTYFACTOR                          Roe+0      i00oe            8&12 2ii    CAPACXTY FACTOR (USXNG MDC NET)                   ie0.3      i00i3            85 i 4 22>    CAPACXTY FACTOR (USXNG DER NET)                   i0i.4      iOi 4~
: 23. UH1T FORCED OUTAGE RATE              t 0 '        0 i0            5@i 24+    SHIJTDOHHS SCHEDULED QVFR NEXT 6 MOHTIIS REFUELXNG SCHEDULED 4/20/92 FQR 63 DAYS
: 25. XF Sl-IUT DQHH AT EHD QF REPOR'I; PERXQD  ESTXMATED DATE OF    I TARTUPl
 
S e
        ~
l'4 1
'I
 
UNIT SHUTDOWNS AI'43 POWER REDUCTIONS 0008BT 062                    ~60 UNIT NAME                      ST  L CIE DATE COMPLETED BY                    J J. BREEN TBLBPHBNB                    L404 468<248 REPORT MONTH JA                      ARY    19 2 No.         Date  Type Duration (Hours)
Reason~       Method of Shutting Licensee Event Report System Code Code'ause Component                          & Corrective Action to Down                                                                  Prevent Recurrence Reactor 920121        0.0          B                              N/A          HH          VALVEX    Unit 2 at approximately      669o power      for feedwater heater inlet valve repair.
920122        0.0                                          N/A          HF          3OCXXXX      Unit 2 held at approximately 85% power for waterbox cleaning.
920123        0.0                                          N/A          HF          HTEXCH    While at 85% power the 2A Turbine Cooling Water Heat Exchanger was declared out of service. Unit 2 then reduced power due to high turbine bearing oil temperature.
920123        0.0          B                              N/A                                    Unit 2 held at approximately 85% power for waterbox cleaning.
F Forecd                        Reason                                          Method                                    Exhibit G - Instructions for S Scheduled                      A - Equipment failure (explain)                 1 - Manual                                Preparation of Data Entry B - Maintenance or Test                        2 - Manual Scram                          Sheets Liccnsce Event Report C - Refueling                                   3 - Automatic Scram                      (LER) File (NUREG4161)
D - Regulatory restriction                     4 - Continued E - Operator Training dc License Examination    5 - Load Reduction F - Administrative                             9 - Other (Explain)                      Exhibit 1 - Same Source G - Operational Error (Expalin)
H - Other (Explain)
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie  2 DATE COMPLETED BY Z.Z. Breen REPORT MONTH  JANUARY  1992 Unit  2 started the month at full power and remained there until January 22, 1992. On January 22, 1992, Unit 2 was at approximately 664 power for feedwater heater inlet valve repair; upon completion of repair Unit 2 ascended in power and was held at approximately 854 for waterbox cleaning. On January 23, 1992, while at 854 power the 2A Turbine Cooling Water Heat Exchanger was declared out of service and Unit 2 started to reduce power due to high turbine bearing oil temperature., After about an hour the Turbine Cooling Heat Exchanger was back in service and Unit 2 ascended in power; the Unit was then held at approximately 854 power for waterbox cleaning. On January 25, 1992, Unit 2 was at 1004 power and the average daily power remained above 804 for the rest of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}

Latest revision as of 21:25, 29 October 2019

Monthly Operating Repts for Jan 1992 for St Lucie Units 1 & 2.W/920218 Ltr
ML17227A296
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/31/1992
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-33, NUDOCS 9202240367
Download: ML17227A296 (14)


Text

ACCELERATED DISTRJBUTION DEMONSTRATION SYSTEM REGULAT . INFORMATION DISTRIBUTIO SYSTEM (RIDS)

Act,.ESSION NBR:920 DOCKET FACIL:50-335 St, Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power a Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREEN,J.J. Florida Power 6 Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mont crating repts for Jan 1992 for St Lucie Units 1 6

2. 920218 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) j ENCL( SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/JDLRQ PEB10 1 1 NRR/DOEA/OEAB 1 1 G 5'TER 01 1 1 RGN2 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASFEI CONTACT THE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P.O. Bex 128, Ft. Pierce, FL 34954-0128 February 18, 1992 L-92-33 10 CFR 50-36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1992 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should you have any questions on this information, please contact us ~

Very truly youxs, D. A. ger Vice r sident St. L ie Plant DAS.JJB kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL $ 617-92

~

PDR R

DR 9p02p~03rrr7 rrr20131

i!'IADOCK 05000335 8n FPL Group company

3 'fiA~l~

~ ~

AVERAGE DAILY UNIT POMER LEVEL DOCKET NO ~ 50-335 DATE COMPLETED BY J. . Breen TELEPHONE 407 468-4248 MONTH JANUARY 1992 DAY AVERAGE DAILY POSER LEVEL (MWe-Net) 1/ 1/92 861 1/ 2/92 863 1/ 3/92 863 1/ 4/92 865 1/ 5/92 866 1/ 6/92 866 1/ 7/92 866 1/ 8/92 865 1/ 9/92 866 1/10/92 866 1/11/92 865 1/12/92 867 1/13/92 866 1/14/92 865 1/15/92 865 1/16/92 866 1/17/92 869 1/18/92 869 1/19/92 869 1/20/92 869 1/21/92 871 1/22/92 871 1/23/92 870 1/24/92 867 1/25/92 868 1/26/92 868 1/27/92 869 1/28/92 868 1/29/92 866 1/30/92 865 1/31/92 867

OPERATING DATA REPORT DQCf(ET NO 50 -

FEg $ 9 532 33'ATE COMPLETED BY J. J, BREEN TELEPI-lQNE 407/468/4248 OPL'R*TING STATUS

1. UNXT NAME+ ST+ LUCIE UNXT 1 2 i REPORTING PERIOD: JANUARY 1992
3. LICENSED THERMAL POWER ( MWT ): 2700 4+ NAMEPLATE RATING (GROSS MWE) i 850 DESIGN ELECTRXCAL RATXNG (NET MWE): 83e 6+ MAX:KMUM DEPENDABLE CAPACITY (GROSS MWE>o 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) l 839 8 IF CHANGES OCCUR XN C*PACITY RATXNGS (ITEMS NUMBER 3 THROUGH 7)

SINCE L*ST REPORT ~ GIVE REASONS

'+

POWER LEVEL TQ WHXCH RESTRICTED'F ANY (NET MWE>

ie i REASONS FOR RESTRICTIONS r IF ANY i MONTHLY - YTD- CUMULATIVE h

11+ HOURS IN REPORT PERXOD: 744 rnn 13248e+e 12+ NUMBER OF HOURS REACTOR WAS CPITIC*L 744 ie 744ie ioe853.6 13, REhCTOR RESERVE SHUTDOWN HOURS O.e ewe 205.3 14+ HOURS GENERATOR ON-LINE 744.0 7nn,e 995'39 '

15. UNIT RESERVE SHUTDOWN HOURS etc ewe <<J9t3 lb. GROSS THERMAL ENERGY GENERATED (MWH) 2eo9eo8 20o9ee8 257736260 17, GRO. S ELECTRICAL ENERGY GENERATED (MWH> 677950 67795e 8=e1077e
18. NET ELECTRXCAL ENERGY GENERATED (MWH> 644796 644796 80328492 19 i UN:KT SERVICE FACTOR ieeie 100.0 75.4 2e. UN:KT AVAILABILITYFACTOR ioo.e 100.e 75+5 21, CAPACITY F*CTOI'USING MDC NET) ie3i3 103.3 75.e
22. CAPACITY FACTOR (USING DER NET) 1en.n 104.4 74ie
23. UNIT FORCED OUTAGE R*TE eie 0.0 nii
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS +

,25. XF Sl-lUT DOWN AT FND OF REPORT PERIOD ESTXM*TED DATE OF ST*RTUP'

J UNIT SHUTDOWNS AND POWER REDUCTIONS DDDBBTND. ~233 UNIT NAME ST LUCIE UNIT 4 DATE U1JZ COMPLETED BY J. J BREEN TELEPHDNB ~868 248 REPORT MONTH JANUARY 1 2 No. Date Type Duration Reasons Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Code Action to Down Prevent Recurrence Reactor The average daily power for Unit 1 for the month of January was 100 %.

F Fomcd Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licenscc Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training dc License Examination 5 - Load Reduction F - Administrative 9 - Olher (Explain) Exhibit 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain) tel ssr FPL

~

1~

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET N00 50-335 UNIT St. Lucie 1 DATE COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 REPORT MONTH JANUARY 1992 For the month of January the average daily power for Unit 1 was 1004.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-389 UNIT St. Lucre 2 DATE COMPLETED BY J.J. Breen MONTH JANUARY 1992 DAY AVERAGE DAILY POWER LEVEL (Mve-Net) 1/92 862 1/ 2/92 864 1/ 3/92 864 1/ 4/92 865 1/ 5/92 865 1/ 6/92 865 1/ 7/92 864 1/ 8/92 863 1/ 9/92 863 1/10/92 860 1/11/92 860 1/12/92 861 1/13/92 859

'1/14/92 859 1/15/92 859 1/16/92 860 1/17/92 860 1/18/92 860 1/19/92 858 1/20/92 857 1/21/92 823 1/22/92 548 1/23/92 723 1/24/92 745 1/25/92 871 1/26/92 791 1/27/92 871 1/28/92 871 1/29/92 878 1/30/92 869 1/31/92 870

OPERATXHG DATA REPORT DQCI'ET NO 50 389 DATE Pgg 4 9 >99t)

COMPLETED BY J J. BREFH TELEPHONE 407/468/4248 QPERATXNG STATUS UNXT NAME+ STo LIJCXE UNXT 2 2o Rl::PORTXHG PERXOD: iJAHUARY i992

3. LXCENSED THERMAI I='OHER <MHT)f 2708 NAMEPLATE RATXHG (GROSS MHE): 850 DESXGH Il:LECTRXCAL RAT:I:HG <HET MHE): 83<)

6+ MAXXMUM DEPENDABI E CAI='ACXTY (GROSS MHE)o . . 882 7+ MAXXMUM DLPEHDABLE C*PACXTY (HET MHE)l 839

8. XF CHANGES OCCUR XN CAPACXTY I ATXHGS <XTEMS NUMBEI 3 THROUGH 7)

SXNCE LAST REPORT GXVE REASONS; 9i POHER LEVEL TQ RHXCII RESTRXCTFDr XF AHY (HET MWE) ie. REASONS FOR RESTRXCTXONS XF ANY:

MONTHLY YTD- CIJMULATXVE ii IHOURS 1N REPORT PERXODl 744 744 74377,e i 4 ~ NUMBER OF I IQURS REACTOR HAS CR1TXCAL 744iO 744.0 64364i3 i3 t REACTOR RESERVE SHUTDOWN HOURS 0.0 ewe eiO i4. I-IOURS GENERATOR ON-L1HE 744iO 744+0 63348+3 i5i UNXT RESERVE SHUTDOHN IHOURS 0.0 0+0 O.e i6+ GROSS THERMAL ENERGY GENERATED (MHI-I) i962960 i962960 i66075566 i7 GROSS ELECTR1CAL ENERGY GENERATED (MHH) 66ne80 660088 5 3859ee i8. NET ELECTRXCAL EHFRGY GEHERATED (MHH) 625877 625877 52388724 i9. UHXT SERVXCE FACTOR i00.0 i00eO 85<2

20. IJHXT AVAXLABXLXTYFACTOR Roe+0 i00oe 8&12 2ii CAPACXTY FACTOR (USXNG MDC NET) ie0.3 i00i3 85 i 4 22> CAPACXTY FACTOR (USXNG DER NET) i0i.4 iOi 4~
23. UH1T FORCED OUTAGE RATE t 0 ' 0 i0 5@i 24+ SHIJTDOHHS SCHEDULED QVFR NEXT 6 MOHTIIS REFUELXNG SCHEDULED 4/20/92 FQR 63 DAYS
25. XF Sl-IUT DQHH AT EHD QF REPOR'I; PERXQD ESTXMATED DATE OF I TARTUPl

S e

~

l'4 1

'I

UNIT SHUTDOWNS AI'43 POWER REDUCTIONS 0008BT 062 ~60 UNIT NAME ST L CIE DATE COMPLETED BY J J. BREEN TBLBPHBNB L404 468<248 REPORT MONTH JA ARY 19 2 No. Date Type Duration (Hours)

Reason~ Method of Shutting Licensee Event Report System Code Code'ause Component & Corrective Action to Down Prevent Recurrence Reactor 920121 0.0 B N/A HH VALVEX Unit 2 at approximately 669o power for feedwater heater inlet valve repair.

920122 0.0 N/A HF 3OCXXXX Unit 2 held at approximately 85% power for waterbox cleaning.

920123 0.0 N/A HF HTEXCH While at 85% power the 2A Turbine Cooling Water Heat Exchanger was declared out of service. Unit 2 then reduced power due to high turbine bearing oil temperature.

920123 0.0 B N/A Unit 2 held at approximately 85% power for waterbox cleaning.

F Forecd Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Liccnsce Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training dc License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie 2 DATE COMPLETED BY Z.Z. Breen REPORT MONTH JANUARY 1992 Unit 2 started the month at full power and remained there until January 22, 1992. On January 22, 1992, Unit 2 was at approximately 664 power for feedwater heater inlet valve repair; upon completion of repair Unit 2 ascended in power and was held at approximately 854 for waterbox cleaning. On January 23, 1992, while at 854 power the 2A Turbine Cooling Water Heat Exchanger was declared out of service and Unit 2 started to reduce power due to high turbine bearing oil temperature., After about an hour the Turbine Cooling Heat Exchanger was back in service and Unit 2 ascended in power; the Unit was then held at approximately 854 power for waterbox cleaning. On January 25, 1992, Unit 2 was at 1004 power and the average daily power remained above 804 for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.