ML17331A035: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/31/1993
| issue date = 01/31/1993
| title = Monthly Operating Rept for Jan 1993 for DC Cook Nuclear Plant,Unit 2.W/930205 Ltr
| title = Monthly Operating Rept for Jan 1993 for DC Cook Nuclear Plant,Unit 2.W/930205 Ltr
| author name = BLIND A A, TURNER D G
| author name = Blind A, Turner D
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:wren.mmXoOmMZmossamroxSvsxKM.'REGULATOINFORMATIONDISTRIBUTIONTEM(RIDS)ACCESSIONNBR:9302180152DOC.DATE:9@$46/9+NOTARIZED:NODOCKETFACIL50-316DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316AUTH.NAMEAUTHORAFFILIATIONTURNERED~G~IndianaMichiganPowerCo.(formerlyIndianaaMichiganEleBLIND,A.A.IndianaMichiganPowerCo.(formerlyIndiana8MichiganEleRECIP.NAMERECIPIENTAFFILIATIONR'UBJECT:MonthlyoperatigetforJan1993forDCCookNuclearPlant,unit2.W930205ltr.DISTRIBUTIONCODE:ZE24DCOPIESRECEIVED:LTRjENCL/SIZE:TITLE:MonthlyOperatingReport(perTechSpecs)NOTES:DRECIPIENTIDCODE/NAMEPD3-1LADEANEWINTERNAL:AEOD/DOANRQ/3)LPQ/LPEB10REGFILE01EXTERNAL:EG&GBRYCEEJ.HNSICCOPIESLTTRENCL33111111111111RECIPIENTIDCODE/NAMEPD3-1PDAEOD/DSP/TPABNRR/DOEA/OEABRGN3NRCPDRCOPIESLTTRENCL1111111111DDDDNOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTETHCONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2065)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEEDIDTOTALNUMBEROFCOPIESREQUIRED:LTTR14ENCL14 g~Iff IndianaMichiganPowerCompanyCookNuclearPlantOneCookPlaceBridgman,Ml491066164655901February5,1993U.S.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,D.C.20555Gentlemen:PursuanttotherequirementsofDonaldC.CookNuclearPlantUnit2TechnicalSpecification6.9.1.10,theattachedMonthlyOperatingReportforthemonthofJanuary1993issubmitted.Respectfully,A.A.BlindPlantManagerAttachmentco3,B~ZD.R.HahnR.C.CallenS.HammingJ.G.KepplerINPORecordsCenterANINuclearEngineeringDepartmentE.E.FitzpatrickR.L.SimmsW.G.Smith,Jr.S.J.BrewerD.W.PaulS.H.SteinhartJ.L.LeichnerJ.A.IsomD.G.TurnerE.A.SmarrellaJ.C.KriegerB.A.SvenssonD.F.KrauseE.C.Schimme1I8Q)pQ9302180152930131PDRADOCK05000316R,PDR N.R.C.OPERATINGDATAREPORTDOCKETNO.50-316DATE02-Feb-93COMPLETEDBYDGTurnerTELEPHONE616-465-5901OPERATINGSTATUSl.UnitNameD.C.CookUnit22.ReportingPeriodJanuary933.LicensedThermalPower(MWt)34114.NamePlateRating(GrossMWe)11335.DesignElectricalRating(NetMWe)10906.MaximumDependableCapacity(GROSSMWe)11007.MaximumDependableCapacity(NetMWe)1090notes8.IfChangesOccurinCapacityRatings(Itemsno.3through7)SinceLastReportGiveReasons9.PowerLevelToWhichRestricted.IfAny(NetMWe)10.ReasonsForRestrictions.IfAny:11.HoursinReportingPeriod12.No.ofHrs.ReactorWasCritical13.ReactorReserveShutdownHours14.'oursGeneratoronLine15.UnitReserveShutdownHours16.GrossTherm.EnergyGen.(MWH)17.GrossElect.EnergyGen.(MWH)18.NetElect.EnergyGen.(MWH)19.UnitServiceFactor20.UnitAvailabilityFactor21.UnitCapacityFactor(MDCNet)22.UnitCapacityFactor(DERNet)23.UnitForcedOutageRate24.ShutdownsScheduledoverNextSixNoneThisMo.Yr.7440744.00'744'0.02528550837510812061100.0100'100F1100.10.0Months(Type,toDate744.0744.00.0744.00'2528550837510812061100.0100.0100.1100'0.0Date,andCumm.132241.087101.50.084060.40.0260116322845915408148423364.764'59.157.516.3Duration):25.IfShutDownAtEndofReportPeriod,EstimatedDateofStartup:26.UnitsinTestStatus(PriortoCommercialOperation):ForcastINITIALCRITICALITYINITIALELECTRICITYCOMMERCIALOPERATIONAchieved AVERAGEDAILYPOWERLEVEL(MWe-Net)DOCKETNO.50-316UNITTWODATE02-Feb-93COMPLETEDBYDGTurnerTELEPHONE616-465-5901DAY12345678910111213.141516MONTHJanuary93AVERAGEDAILYPOWERLEVEL1084108110891086109110931093108910911090109210871089109210991092DAY171819202122232425262728293031AVERAGEDAILYPOWERLEVEL109610941090109110931097109510971095109810961092109310901084 UNITSHUTDOWNSANDPOWERREDUCTIONSREPORTMONTH:JANUARY1993UNITNAME:DATE:COMPLETEDBY:TELEPHONE:DC.COOKU¹T2February3,1993G.J.Costello(616)465-5901iMETHODOFSHUTTINGLICENSEEDURATIONDOWNEVENTSYSTEMCOMPONENTCAUSEANDCORRECTIVEACTIONNODATETYPEHOURSREASONREACTORREPORTNO.CODECODETOPREVENTRECURRENCENoneTherewerenounitshutdownorsignificantpowerreductionsfrom100%RTPthismonth.1FSForcedScheduled2Reason:A:EquipmentFailure(Explain)B:MaintenanceorTestC:RefuelingD:RegulatoryRestrictionE:OperatorTrainingandLicenseExaminationF:AdministrativeG:OperationalError(Explain)H:Other(Explain)3Method:1:Manual2:ManualScram3:AutomaticScram4:Other(Explain)ExhibitG-InstructionsforpreparationofdataentrysheetsforLicenseeEventReport(LER)File(NUREG1061)5ExhibitI:SameSource taDOCKETO.:UNITNAME:COMPLETEDBY:TELEPHONE:DATEPAGE:50-316D.C.CookUnit2G.J.Costello(616)465-5901February3,1993Page1of2MONTHLYOPERATINGACTIVITIES-JANUARY1993HIGHLIGHTSTheunitenteredthereportingperiodinMode1at100:RTP.TheunitexitedthisreportingperiodinMode1at100~RTP.Therewerenochallengestothepressurizersafetyvalvesorpoweroperatedreliefvalves.-GrossElectricalgenerationforthemonthofJanuary:was837510MWH.DETAILSNone DOCKETNUNITNAME:COMPLETEDBY:TELEPHONE:DATE:PAGE:50-316D.C.CookUnit2E.C.Schimmel(616)465-5901February5,19921of1MAJORSAFETY-RELATEDMAINTENANCE-Januar1993Therewerenomajorsafety-relatedmaintenanceitemsduringthemonthofJanuary.
{{#Wiki_filter:.'
wren.mm REGULATO X        oOmMZm ossa INFORMATION DISTRIBUTION mrox TEM  (RIDS)
SvsxKM ACCESSION NBR:9302180152            DOC.DATE: 9@$46/9+ NOTARIZED: NO                  DOCKET FACIL 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                    M 05000316 AUTH. NAME            AUTHOR AFFILIATION TURNERED G ~
            ~           Indiana Michigan Power Co. (formerly Indiana a Michigan Ele BLIND,A.A.           Indiana Michigan Power Co. (formerly Indiana 8 Michigan Ele RECIP.NAME            RECIPIENT AFFILIATION Monthly operati      g    e  t for  Jan 1993  for DC  Cook Nuclear R'UBJECT:
Plant, unit  2.W 930205      ltr.                                                 D DISTRIBUTION CODE: ZE24D          COPIES RECEIVED:LTR      j  ENCL  /   SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT            COPIES              RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL          ID  CODE/NAME      LTTR ENCL PD3-1 LA                    3      3      PD3-1 PD              1    1 DEANEW                      1      1                                                  D INTERNAL: AEOD/DOA                      1      1      AEOD/DSP/TPAB          1    1              D NRQ/3)LPQ/LPEB10            1      1      NRR/DOEA/OEAB          1    1 REG FILE          01        1      1      RGN3                  1    1 EXTERNAL: EG&G BRYCEEJ.H                1      1      NRC PDR                1    1 NSIC                        1      1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR                14  ENCL    14
 
g ~   If f
 
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 February 5, 1993 U.S. Nuclear Regulatory Commission ATTN:         Document    Control Desk Washington, D.C.           20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit      2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1993 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment co                    3, B~Z D.R. Hahn R.C. Callen S.     Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L. Simms W.G. Smith, Jr.
S.J. Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E. C. Schimme1 I 8Q) pQ 9302180152 930131 PDR    ADOCK 05000316 R            ,           PDR
 
N.R.C. OPERATING DATA REPORT DOCKET NO.         50-316 DATE 02-Feb-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS
: l. Unit Name                D. C. Cook  Unit  2
: 2. Reporting Period                    January 93 notes
: 3. Licensed Thermal Power (MWt)               3411
: 4. Name Plate Rating (Gross MWe)               1133
: 5. Design Electrical Rating (Net MWe)         1090
: 6. Maximum Dependable Capacity (GROSS MWe) 1100
: 7. Maximum Dependable Capacity (Net MWe)       1090
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted.
: 10. Reasons For Restrictions. If    If Any  (Net  MWe)
Any:
This  Mo. Yr. to Date    Cumm.
: 11. Hours in Reporting Period                  744 0        744.0  132241.0
: 12. No. of Hrs. Reactor Was Critical          744.0        744.0    87101.5
: 13. Reactor Reserve Shutdown Hours                0 '          0.0        0.0 14.'ours Generator    on Line                  744  '        744.0    84060. 4
: 15. Unit Reserve Shutdown Hours                  0.0          0'          0.0
: 16. Gross Therm. Energy Gen. (MWH)         2528550        2528550  260116322
: 17. Gross Elect. Energy Gen. (MWH)         837510        837510  84591540
: 18. Net Elect. Energy Gen. (MWH)           812061        812061  81484233
: 19. Unit  Service Factor                      100.0        100.0        64.7
: 20. Unit  Availability Factor                100 '        100.0       64 '
: 21. Unit  Capacity Factor (MDC  Net)          100 1F        100.1        59.1
: 22. Unit  Capacity Factor (DER  Net)          100.1        100 '       57.5
: 23. Unit  Forced Outage Rate                    0.0          0.0        16.3
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
None
: 25. If Shut  Down At End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
Forcast    Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.         50-316 UNIT                  TWO DATE          02-Feb-93 COMPLETED BY DG Turner TELEPHONE    616-465-5901 MONTH        January  93 AVERAGE DAILY                        AVERAGE DAILY DAY POWER LEVEL              DAY          POWER LEVEL 1          1084              17                  1096 2          1081              18                  1094 3          1089              19                  1090 4          1086              20                  1091 5          1091              21                  1093 6          1093              22                  1097 7          1093              23                  1095 8          1089              24                  1097 9          1091              25                  1095 10        1090              26                  1098 11        1092              27                  1096 12        1087              28                  1092
: 13.       1089              29                  1093 14        1092              30                  1090 15        1099              31                  1084 16        1092
 
UNIT  SHUTDOWNS AND POWER REDUCTIONS                              UNIT NAME:       D  C. COOK U¹T    2 DATE:            February 3, 1993 REPORT MONTH: JANUARY 1993                                      COMPLETED BY:    G. J. Costello TELEPHONE:      (616) 465-5901  i METHOD OF SHUTTING    LICENSEE DURATION            DOWN        EVENT      SYSTEM COMPONENT    CAUSE AND CORRECTIVE ACTION NO  DATE  TYPE      HOURS      REASON  REACTOR      REPORT NO. CODE  CODE          TO PREVENT RECURRENCE None                                                                                    There were no  unit shutdown or significant power reductions from 100% RTP this month.
1                2                                    3                                                5 F  Forced        Reason:                              Method:            Exhibit G - Instructions      Exhibit  I: Same S  Scheduled    A: Equipment  Failure (Explain)     1: Manual          for preparation of data                    Source B: Maintenance or Test              2: Manual Scram    entry sheets for Licensee C: Refueling                        3: Automatic Scram Event Report (LER) File D: Regulatory Restriction          4: Other (Explain) (NUREG 1061)
E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)
 
ta DOCKET O.:       50-316 UNIT NAME:      D.C. Cook  Unit 2 COMPLETED BY:    G. J. Costello TELEPHONE:      (616) 465-5901 DATE            February 3, 1993 PAGE:            Page 1  of 2 MONTHLY OPERATING ACTIVITIES  JANUARY 1993 HIGHLIGHTS The  unit entered the reporting period in  Mode 1  at 100: RTP.
The  unit exited this reporting period in  Mode 1 at 100~ RTP.
There were no  challenges to the pressurizer safety valves or power operated relief valves.
-Gross  Electrical generation for the  month  of January: was 837510  MWH.
DETAILS None
 
DOCKET N      50-316 UNIT NAME:    D.C. Cook Unit 2 COMPLETED BY: E.C. Schimmel TELEPHONE:    (616) 465-5901 DATE:          February 5, 1992 PAGE:          1 of  1 MAJOR SAFETY-RELATED MAINTENANCE  Januar    1993 There were no major safety-related maintenance items during the month of January.
 
y}}
y}}

Latest revision as of 05:46, 29 October 2019

Monthly Operating Rept for Jan 1993 for DC Cook Nuclear Plant,Unit 2.W/930205 Ltr
ML17331A035
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/31/1993
From: Blind A, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9302180152
Download: ML17331A035 (9)


Text

.'

wren.mm REGULATO X oOmMZm ossa INFORMATION DISTRIBUTION mrox TEM (RIDS)

SvsxKM ACCESSION NBR:9302180152 DOC.DATE: 9@$46/9+ NOTARIZED: NO DOCKET FACIL 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION TURNERED G ~

~ Indiana Michigan Power Co. (formerly Indiana a Michigan Ele BLIND,A.A. Indiana Michigan Power Co. (formerly Indiana 8 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Monthly operati g e t for Jan 1993 for DC Cook Nuclear R'UBJECT:

Plant, unit 2.W 930205 ltr. D DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR j ENCL / SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 3 3 PD3-1 PD 1 1 DEANEW 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 D NRQ/3)LPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FILE 01 1 1 RGN3 1 1 EXTERNAL: EG&G BRYCEEJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

g ~ If f

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 February 5, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1993 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment co 3, B~Z D.R. Hahn R.C. Callen S. Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L. Simms W.G. Smith, Jr.

S.J. Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E. C. Schimme1 I 8Q) pQ 9302180152 930131 PDR ADOCK 05000316 R , PDR

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 02-Feb-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D. C. Cook Unit 2
2. Reporting Period January 93 notes
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1090
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If If Any (Net MWe)

Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744 0 744.0 132241.0
12. No. of Hrs. Reactor Was Critical 744.0 744.0 87101.5
13. Reactor Reserve Shutdown Hours 0 ' 0.0 0.0 14.'ours Generator on Line 744 ' 744.0 84060. 4
15. Unit Reserve Shutdown Hours 0.0 0' 0.0
16. Gross Therm. Energy Gen. (MWH) 2528550 2528550 260116322
17. Gross Elect. Energy Gen. (MWH) 837510 837510 84591540
18. Net Elect. Energy Gen. (MWH) 812061 812061 81484233
19. Unit Service Factor 100.0 100.0 64.7
20. Unit Availability Factor 100 ' 100.0 64 '
21. Unit Capacity Factor (MDC Net) 100 1F 100.1 59.1
22. Unit Capacity Factor (DER Net) 100.1 100 ' 57.5
23. Unit Forced Outage Rate 0.0 0.0 16.3
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 02-Feb-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 MONTH January 93 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 1084 17 1096 2 1081 18 1094 3 1089 19 1090 4 1086 20 1091 5 1091 21 1093 6 1093 22 1097 7 1093 23 1095 8 1089 24 1097 9 1091 25 1095 10 1090 26 1098 11 1092 27 1096 12 1087 28 1092

13. 1089 29 1093 14 1092 30 1090 15 1099 31 1084 16 1092

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: D C. COOK U¹T 2 DATE: February 3, 1993 REPORT MONTH: JANUARY 1993 COMPLETED BY: G. J. Costello TELEPHONE: (616) 465-5901 i METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO DATE TYPE HOURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE None There were no unit shutdown or significant power reductions from 100% RTP this month.

1 2 3 5 F Forced Reason: Method: Exhibit G - Instructions Exhibit I: Same S Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 1061)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

ta DOCKET O.: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: G. J. Costello TELEPHONE: (616) 465-5901 DATE February 3, 1993 PAGE: Page 1 of 2 MONTHLY OPERATING ACTIVITIES JANUARY 1993 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 100: RTP.

The unit exited this reporting period in Mode 1 at 100~ RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

-Gross Electrical generation for the month of January: was 837510 MWH.

DETAILS None

DOCKET N 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: E.C. Schimmel TELEPHONE: (616) 465-5901 DATE: February 5, 1992 PAGE: 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE Januar 1993 There were no major safety-related maintenance items during the month of January.