ML20206D148: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000324/1986010]]
{{Adams
| number = ML20206D148
| issue date = 06/09/1986
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/86-10 & 50-325/86-09.Corrective Actions Will Be Examined During Future Insps
| author name = Verrelli D
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Utley E
| addressee affiliation = CAROLINA POWER & LIGHT CO.
| docket = 05000324, 05000325
| license number =
| contact person =
| document report number = NUDOCS 8606190660
| title reference date = 05-27-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000324/1986010]]
 
=Text=
{{#Wiki_filter:JUN 0 91986
Docket Nos. 50-325, 50-324
License Nos. DPR-71, DPR-62
                                                .
                                                                                      '
Carolinj Power and Light Company
ATTN:V Mr. E. E. Utley
        Senior Executive Vice President
        Power Supply and Engineering
          and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-09 AND 50-324/86-10
Thank you for your response of May 27, 1986, to our Notice of Violation issued on
April 29, 1986, concerning activities conducted at your Brunswick facility under
NRC Operating License Nos. OPR-71 and DPR-62. We have evaluated your response
and found that it meets the requirements of 10 CFR 2.201. We will examine the
implementation of your corrective actions during future inspections.
                                                                                      '
We appreciate your cooperation in this matter.
                                          Sincerely,
                                            Sf
                                          David M. Verrelli, Chief
                                          Reactor Projects Branch 2
                                          Division of Reactor Projects
cc:    . W. Howe, Vice President
      / Brunswick Nuclear Project
    VC. R. Dietz, Plant General Manager
bec:    RC Resident Inspector
    / L. Mellen
    v60cument Control Desk
    4 tate of North Carolina
                                                                                      ,
                                                                                      ;
                                                        ~
RII                      j          RI
JLCo ey:lb            IJBlake        ARHerdt      f.
                                                        6 %-
                                                                                      '
06/ /86              06/d'/86        06/f/86        (,
                8606190660 G60609
                PDR  ADOCK 05000324
                G                PDR
                                                                              7 &O l/
                                                                                    -
                                                                          0
}}

Latest revision as of 14:25, 6 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/86-10 & 50-325/86-09.Corrective Actions Will Be Examined During Future Insps
ML20206D148
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/09/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8606190660
Download: ML20206D148 (1)


See also: IR 05000324/1986010

Text

JUN 0 91986

Docket Nos. 50-325, 50-324

License Nos. DPR-71, DPR-62

.

'

Carolinj Power and Light Company

ATTN:V Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-09 AND 50-324/86-10

Thank you for your response of May 27, 1986, to our Notice of Violation issued on

April 29, 1986, concerning activities conducted at your Brunswick facility under

NRC Operating License Nos. OPR-71 and DPR-62. We have evaluated your response

and found that it meets the requirements of 10 CFR 2.201. We will examine the

implementation of your corrective actions during future inspections.

'

We appreciate your cooperation in this matter.

Sincerely,

Sf

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

cc: . W. Howe, Vice President

/ Brunswick Nuclear Project

VC. R. Dietz, Plant General Manager

bec: RC Resident Inspector

/ L. Mellen

v60cument Control Desk

4 tate of North Carolina

,

~

RII j RI

JLCo ey:lb IJBlake ARHerdt f.

6 %-

'

06/ /86 06/d'/86 06/f/86 (,

8606190660 G60609

PDR ADOCK 05000324

G PDR

7 &O l/

-

0