ML20132G448: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20132G448
| number = ML20132G448
| issue date = 12/17/1996
| issue date = 12/17/1996
| title = Ack Receipt of 961107 Ltr in Response to Issue Raised in 960513 Ltr Re Dept of Labor Case 94-ERA-34
| title = Ack Receipt of in Response to Issue Raised in Re Dept of Labor Case 94-ERA-34
| author name = Cooper R
| author name = Cooper R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9612260260
| document report number = NUDOCS 9612260260
| title reference date = 11-07-1996
| package number = ML20132G452
| package number = ML20132G452
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
Line 32: Line 33:
==Dear Dr. Boulette:==
==Dear Dr. Boulette:==


This letter provides receipt acknowledgement of your letter dated November 7,1996 in response to the issue raised in our May 13,1996 letter. We understand that there are different classifications of vendor manuals at the Pilgrim Nuclear Power Station and the additional information BECo provided relative to the subject case, was consistent with NRC Inspection 50-293/95-22 findings. Specifically, vendor technical manuals being used for safety-related maintenance are being controlled by an update process. NRC unresolved item (UNR) 50-293/95-22-01 remains open in the area of vendor equipment technical information program backlog resolution pending further NRC review.
This letter provides receipt acknowledgement of your {{letter dated|date=November 7, 1996|text=letter dated November 7,1996}} in response to the issue raised in our {{letter dated|date=May 13, 1996|text=May 13,1996 letter}}. We understand that there are different classifications of vendor manuals at the Pilgrim Nuclear Power Station and the additional information BECo provided relative to the subject case, was consistent with NRC Inspection 50-293/95-22 findings. Specifically, vendor technical manuals being used for safety-related maintenance are being controlled by an update process. NRC unresolved item (UNR) 50-293/95-22-01 remains open in the area of vendor equipment technical information program backlog resolution pending further NRC review.
Thank you for providing this clarification. We have no further questions on this subject at this time.
Thank you for providing this clarification. We have no further questions on this subject at this time.
Thank you for your cooperation.
Thank you for your cooperation.

Latest revision as of 05:04, 10 August 2022

Ack Receipt of in Response to Issue Raised in Re Dept of Labor Case 94-ERA-34
ML20132G448
Person / Time
Site: Pilgrim
Issue date: 12/17/1996
From: Cooper R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20132G452 List:
References
NUDOCS 9612260260
Download: ML20132G448 (2)


Text

e pmatog

= * *+, UNITED STATES

[Ys g

p, j

NUCLEAR REGULATORY COMMISSION REGloN l 475 ALLENDALE ROAD

,d"a KING OF PRUSSIA. PENNSYLVANIA 19406-1415

....+

December 17,1996 E. Thomas Boulette, Ph.D Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massachusetts 02360-5599

Subject:

Department of Labor Case No. 94-ERA-34

Dear Dr. Boulette:

This letter provides receipt acknowledgement of your letter dated November 7,1996 in response to the issue raised in our May 13,1996 letter. We understand that there are different classifications of vendor manuals at the Pilgrim Nuclear Power Station and the additional information BECo provided relative to the subject case, was consistent with NRC Inspection 50-293/95-22 findings. Specifically, vendor technical manuals being used for safety-related maintenance are being controlled by an update process. NRC unresolved item (UNR) 50-293/95-22-01 remains open in the area of vendor equipment technical information program backlog resolution pending further NRC review.

Thank you for providing this clarification. We have no further questions on this subject at this time.

Thank you for your cooperation.

Sincerely, i\-

s Richard W. Coop 11, Director Division of Reactor Projects Docket No. 50-293 260064 1

9612260260 961217 ^/ l PDR ADOCK 05000293 l P PDR {

I

E. Thomas Boulette, Ph.D -

Boston Edison Company cc w/ encl:

L. Olivier, Vice President - Nuclear and Station Director T. Sullivan, Plant Department Manager N. Desmond, Regulatory Relations D. Tarantino, Nuclear information Manager R. Hallisey, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Linda Teagan B. Abbanat, Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director P. Gromer, Massachusetts Secretary of Energy Resources J. Shaer, Legislative Assistant J. Fleming A. Nogee, MASSPIRG Regional Administrator, FEMA Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attorney General, Commonwealth o'f Massachusetts T. Rapone, Massachusetts Executive Office of Public Safety Chairman, Citizens Urging Responsible Energy Commonwealth of Massachusetts, SLO Designee I

l

O E. Thomas Boulette, Ph.D Boston Edison Company Distribution w/ encl:

Region I Docket Room (with concurrences)

PUBLIC Nuclear Safety Information Center (NSIC)

D. Screnci, PAO (32) SALP Reports and (2) All Inspection Reports NRC Resident inspector R. Conte, DRP H. Eichenholz, DRP G.Cowan,DRP Distribution w/enci (VIA E-MAIL):

S. Bajwa, NRR A. Wang, NRR W. Dean, OEDO Inspection Program Branch, NRR (IPAS)

{

i l

l l

DOCUMENT NAME: G:\ BRANCH 5\BECO.LTR To receive a copy of this document, indicate in the boa: *C" = Copy w!o attach /enct

  • E' = Copy w/ attach /enci *N' = No copy OFFICE N DRP/RI jyf ,

DRP/R1 3% DRP/Rijyjg NAME BKorona DATE 12/16/96 RConte 11 D4{ RCoo M '

12/#b/96 ffW 12/g/96 12/ /96 OFFICIAL RECORD COPY l