ML20127L179: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:,'                                                                            blf <n/ h
  .                                                                                6YP
                                        l'MR 291985
    Alabama Power Compar.y
    ATTN: Mr. R. P. Mcdonald
              Senior Vice President
    P. O. Box 2641
    Birmingham, AL 35291
    Gentlemen:
    SUBJECT:    REPORT N05. 50-348/85-06 AND 50-364/85-06
    The NRC Systematic Assessment of Licensee Performance (SALP) Board has completed
    its periodic evaluation of the performance of your Farley facility.      This facility
    was evaluated for the period August 1, 1983 through December 31, 1984. The
    results of the evaluation are documented in the enclosed SALP Board Report.
    This report will be discussed with you at your Farley facility on April 11, 1985.
    The performance of your Farley facility was evaluated in the functional areas of
    plant operations, radiological      controls, maintenance, surveillance, fire
    protection, emergency preparedness, security, refueling, training, quality
    programs and administrative controls affecting quality, and licensing activities.
    A high level of performance has continued at your Farley facility. There was an
    aggressive management posture towards nuclear safety.      Strengths were noted by
    the SALP Board in the areas of plant operations, radiological controls, mainten
    ance, fire protection, emergency preparedness, refueling, training, and licensing
    activities.
    Any comments you have concerning our evaluation of the performance of your facility
    should be submitted to this of fice within 30 days following the date of our
    meeting at your Farley facility.      Your comments (if any), a summary of our
    April 11, 1985 meeting, and my disposition of your comments will be issued as an
    appendix to the enclosed SALP Board Report.
    Should you have any questions concerning this letter, we will be glad to discuss
    them with you.
                                                Sincerely,
                                                />/ [A4/xtl ('vw L
                                                J. Nelson Grace
                                                Regional Administrator
    Enclosure:
    SALP Board Report - Farley Units 1 and 2
    cc w/ enc 1:  (See page 2)
        0,,506270779050k,E,onm
          on                              ** 140                                          i
        *                                                                        :ce c>l hg
 
  W
    b  ,
    ,
      Alabama Power Company                        2
                                                                  N R 20 1985
      cc w/ enc 1:
      W. O. Whitt, Executive Vice President
      J. O. Woodard, Plant Manager
      W. G. Hairston, III, Manager, Nuclear Engineering
        and Technical Support
      J. W. McGowan, Manager-Safety Audit
        and Engineering Review
      H. O. Thrash, Manager, Nuclear Operations
        and Administration
      W. G. Ware, Supervisor-Safety Audit
        and Engineering Review
      bec w/ encl:                                                            <
      Chairman Palladino
      Chairman Roberts
      Commissioner Asselstine
      Commissioner Bernthal
      Commissioner Zech
      J. M. Taylor, IE
      T. E. Murley, RI
      J. G. Keppler, RIII
      R. D. Martin, RIV
      J. B. Martin, RV
-
      J. A. Axelrad, IE
      Records Center, INPO
      Region II Distribution List C
      D. S. Price, RII
      T. C. MacArthur
      E. Reeves, NRR
      Document Control Desk
      State of Alabama
      NRC Resident Inspector
      RII            RIIn      RII    )  ,RII  ,,o  RII          RII .
      /X              %\              '
                                                9          lM/~
      KJ'u$
          ni Jan:jw  DPrice    Kla    is  FCantrell  DVerrolli    JPuckett
      3/13/JS        3/(4/85  34 /85      3/p/ /85    3/g//85      340/85
      RI!            R!        RII        RI!
      % 0hU-                    l(l't?'/          \.
      #Nhr            90e      RWalker
                                    '
                                            J01 hinski
      3/10/85        3/Sl/85  3/l+ '/85  3    /85
}}
}}

Latest revision as of 16:25, 23 July 2020

Forwards SALP Repts 50-348/85-06 & 50-364/85-06 for Aug 1983 - Dec 1984.Overall Performance Satisfactory
ML20127L179
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/29/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20127L181 List:
References
NUDOCS 8506270779
Download: ML20127L179 (2)


See also: IR 05000348/1985006

Text

,' blf <n/ h

. 6YP

l'MR 291985

Alabama Power Compar.y

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT N05. 50-348/85-06 AND 50-364/85-06

The NRC Systematic Assessment of Licensee Performance (SALP) Board has completed

its periodic evaluation of the performance of your Farley facility. This facility

was evaluated for the period August 1, 1983 through December 31, 1984. The

results of the evaluation are documented in the enclosed SALP Board Report.

This report will be discussed with you at your Farley facility on April 11, 1985.

The performance of your Farley facility was evaluated in the functional areas of

plant operations, radiological controls, maintenance, surveillance, fire

protection, emergency preparedness, security, refueling, training, quality

programs and administrative controls affecting quality, and licensing activities.

A high level of performance has continued at your Farley facility. There was an

aggressive management posture towards nuclear safety. Strengths were noted by

the SALP Board in the areas of plant operations, radiological controls, mainten

ance, fire protection, emergency preparedness, refueling, training, and licensing

activities.

Any comments you have concerning our evaluation of the performance of your facility

should be submitted to this of fice within 30 days following the date of our

meeting at your Farley facility. Your comments (if any), a summary of our

April 11, 1985 meeting, and my disposition of your comments will be issued as an

appendix to the enclosed SALP Board Report.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/>/ [A4/xtl ('vw L

J. Nelson Grace

Regional Administrator

Enclosure:

SALP Board Report - Farley Units 1 and 2

cc w/ enc 1: (See page 2)

0,,506270779050k,E,onm

on ** 140 i

  • :ce c>l hg

W

b ,

,

Alabama Power Company 2

N R 20 1985

cc w/ enc 1:

W. O. Whitt, Executive Vice President

J. O. Woodard, Plant Manager

W. G. Hairston, III, Manager, Nuclear Engineering

and Technical Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

H. O. Thrash, Manager, Nuclear Operations

and Administration

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/ encl: <

Chairman Palladino

Chairman Roberts

Commissioner Asselstine

Commissioner Bernthal

Commissioner Zech

J. M. Taylor, IE

T. E. Murley, RI

J. G. Keppler, RIII

R. D. Martin, RIV

J. B. Martin, RV

-

J. A. Axelrad, IE

Records Center, INPO

Region II Distribution List C

D. S. Price, RII

T. C. MacArthur

E. Reeves, NRR

Document Control Desk

State of Alabama

NRC Resident Inspector

RII RIIn RII ) ,RII ,,o RII RII .

/X  %\ '

9 lM/~

KJ'u$

ni Jan:jw DPrice Kla is FCantrell DVerrolli JPuckett

3/13/JS 3/(4/85 34 /85 3/p/ /85 3/g//85 340/85

RI! R! RII RI!

% 0hU- l(l't?'/ \.

  1. Nhr 90e RWalker

'

J01 hinski

3/10/85 3/Sl/85 3/l+ '/85 3 /85