{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 2, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2015006 AND 05000278/2015006)
{{#Wiki_filter:UNITED STATES rch 2, 2016
 
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2015006 AND 05000278/2015006)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter inspections at your facility. The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, nstallation at Operating Plants.The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-s with Regard to Reliable Spent remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for PBAPS Units 2 and 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5262 with any questions you have regarding this letter.
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
 
Routine inspections performed by resident inspectors are not included in the inspection plan.
 
In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP)
60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
 
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for PBAPS Units 2 and 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 610-337-5262 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Daniel L. Schroeder, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277 and 50-278 License Nos. NPF-44 and NPF-56 Enclosure: Peach Bottom Inspection/Activity Plan cc w/encl: Distribution via ListServ  
/RA/
Daniel L. Schroeder, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277 and 50-278 License Nos. NPF-44 and NPF-56 Enclosure: Peach Bottom Inspection/Activity Plan cc w/encl: Distribution via ListServ
 
ML16060A376 SUNSI Review Non-Sensitive  Publicly Available Sensitive  Non-Publicly Available OFFICE RI/DRP  RI/DRP  RI/DRP  RI/DRP NAME ATurilin/ AT BSmith/ BS via email JHeinly/ JH via email DSchroeder/ DLS DATE 02/25 /16 02/ 25 /16  02/24 /16 02/29 /16
 
Page 1 of 2      Peach Bottom 02/24/2016 16:00:45    Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 7111117T - PERMANENT PLANT MODIFICATIONS    3 2, 3 01/25/2016 01/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 02/08/2016 02/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP EXERCISE EVALUATION      4 2, 3 04/25/2016 04/29/2016 IP 7111401 Exercise Evaluation RS1234 - HP INSPECTION      1 2, 3 03/06/2016 03/10/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/06/2016 03/10/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 03/06/2016 03/10/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 03/06/2016 03/10/2016 IP 71124.04 Occupational Dose Assessment RS567PPI - HP TEAM INSPECTION      3 2, 3 06/06/2016 06/10/2016 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 06/06/2016 06/10/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 06/06/2016 06/10/2016 IP 71124.07 Radiological Environmental Monitoring Program 2 06/06/2016 06/10/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111107T - TRIENNIAL HEAT SINK      1 2, 3 06/13/2016 06/17/2016 IP 7111107T Heat Sink Performance 3/20EXAM - PEACH BOTTOM INITIAL EXAM    4 2 02/20/2017 02/24/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 2 03/20/2017 03/31/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 7111108G - PB U2 INSERVICE INSPECTION    1 2 10/31/2016 11/04/2016 IP 7111108G Inservice Inspection Activities - BWR RS1234PI - HP INSPECTION      1 2, 3 10/31/2016 11/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/31/2016 11/04/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/31/2016 11/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/31/2016 11/04/2016 IP 71124.04 Occupational Dose Assessment 2, 3 10/31/2016 11/04/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111111B - PB REQUAL INSP WITH P/F RESULTS    2 2, 3 03/06/2017 03/10/2017 IP 7111111B Licensed Operator Requalification Program CBDI - COMPONENT DESIGN BASIS INSPECTION    6 2, 3 01/30/2017 02/03/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/13/2017 02/17/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/27/2017 03/03/2017 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.


ML16060A376  SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME ATurilin/ AT BSmith/ BS via email JHeinly/ JH via email DSchroeder/ DLS DATE 02/25 /16 02/ 25 /16 02/24 /16 02/29 /16 Page 1 of 2 02/24/2016 16:00:45 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 01/01/2016-12/31/20177111117T-PERMANENT PLANT MODIFICATIONS 3 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 01/25/2016 01/29/2016 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 02/08/2016 02/12/2016 EP-EP EXERCISE EVALUATION 4 2, 3 IP Exercise Evaluation7111401 04/25/2016 04/29/2016 RS1234-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/06/2016 03/10/2016 2, 3 IP Occupational ALARA Planning and Controls71124.02 03/06/2016 03/10/2016 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/06/2016 03/10/2016 2, 3 IP Occupational Dose Assessment71124.04 03/06/2016 03/10/2016 RS567PPI-HP TEAM INSPECTION 3 2, 3 IP Radiation Monitoring Instrumentation71124.05 06/06/2016 06/10/2016 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/06/2016 06/10/2016 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/06/2016 06/10/2016 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 06/06/2016 06/10/20167111107T-TRIENNIAL HEAT SINK 1 2, 3 IP Heat Sink Performance7111107T 06/13/2016 06/17/20163/20EXAM-PEACH BOTTOM INITIAL EXAM 4 2 FY-17-PB INITIAL OPERATOR LICENSING EXAM U01942 02/20/2017 02/24/2017 2 FY-17-PB INITIAL OPERATOR LICENSING EXAM U01942 03/20/2017 03/31/20177111108G-PB U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 10/31/201611/04/2016 RS1234PI-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/31/201611/04/2016 2, 3 IP Occupational ALARA Planning and Controls71124.02 10/31/201611/04/2016 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/31/201611/04/2016 2, 3 IP Occupational Dose Assessment71124.04 10/31/201611/04/2016 2, 3 IP Occupational Exposure Control Effectiveness71151-OR01 10/31/201611/04/20167111111B-PB REQUAL INSP WITH P/F RESULTS 2 2, 3 IP Licensed Operator Requalification Program7111111B 03/06/2017 03/10/2017 CBDI-COMPONENT DESIGN BASIS INSPECTION 6 2, 3 IP Component Design Bases Inspection7111121 01/30/2017 02/03/2017 2, 3 IP Component Design Bases Inspection7111121 02/13/2017 02/17/2017 2, 3 IP Component Design Bases Inspection7111121 02/27/2017 03/03/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2     Peach Bottom 02/24/2016 16:00:45   Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EP - EP PROGRAM INSPECTION      1 2, 3 03/27/2017 03/31/2017 IP 7111402 Alert and Notification System Testing 2, 3 03/27/2017 03/31/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 03/27/2017 03/31/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 03/27/2017 03/31/2017 IP 71151  Performance Indicator Verification 71152B - PI&R BIENNIAL      2 2, 3 03/13/2017 03/17/2017 IP 71152B Problem Identification and Resolution 2, 3 03/27/2017 03/31/2017 IP 71152B Problem Identification and Resolution RS12 - HP INSPECTION       1 2, 3 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls ISFSI - ISFSI LOADING CAMPAIGN INSPECTION      1 2, 3 05/08/2017 05/12/2017 IP 60855  Operation Of An ISFSI 2, 3 05/08/2017 05/12/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RS34 - HP INSPECTION      1 2, 3 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 05/08/2017 05/12/2017 IP 71124.04 Occupational Dose Assessment 2 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE        1 2, 3 07/17/2017 07/21/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS123 - HP INSPECTION       1 2, 3 10/23/2017 10/27/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/23/2017 10/27/2017 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/23/2017 10/27/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 10/23/2017 10/27/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111108G - U3 INSERVICE INSPECTION      1 3 10/30/2017 11/03/2017 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.


Page 2 of 2 02/24/2016 16:00:45 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Peach BottomInspection / Activity Plan 01/01/2016-12/31/2017 EP-EP PROGRAM INSPECTION 1 2, 3 IP A lert and Notification System Testing7111402 03/27/2017 03/31/2017 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/27/2017 03/31/2017 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/27/2017 03/31/2017 2, 3 IP Performance Indicator Verification71151 03/27/2017 03/31/201771152B-PI&R BIENNIAL 2 2, 3 IP Problem Identification and Resolution71152B 03/13/2017 03/17/2017 2, 3 IP Problem Identification and Resolution71152B 03/27/2017 03/31/2017 RS12-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017 03/31/2017 2, 3 IP Occupational ALARA Planning and Controls71124.02 03/27/2017 03/31/2017 ISFSI-ISFSI LOADING CAMPAIGN INSPECTION 1 2, 3 IP Operation Of An ISFSI 60855 05/08/2017 05/12/2017 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/08/2017 05/12/2017 RS34-HP INSPECTION 1 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/08/2017 05/12/2017 2, 3 IP Occupational Dose Assessment71124.04 05/08/2017 05/12/2017 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 05/08/2017 05/12/201771124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 07/17/2017 07/21/2017 RS123-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/23/2017 10/27/2017 2, 3 IP Occupational ALARA Planning and Controls71124.02 10/23/2017 10/27/2017 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/23/2017 10/27/2017 2 IP Occupational Exposure Control Effectiveness71151-OR01 10/23/2017 10/27/20177111108G-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - BWR7111108G 10/30/201711/03/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 22:26, 30 October 2019

ROP 16 Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 & 3 (Report 05000277/2015006 & 05000278/2015006)
ML16060A376
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/02/2016
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
SCHROEDER, DL
Shared Package
ML16039A098 List:
References
IR 2015006
Download: ML16060A376 (5)


Text

UNITED STATES rch 2, 2016

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2015006 AND 05000278/2015006)

Dear Mr. Hanson:

On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2017.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for PBAPS Units 2 and 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277 and 50-278 License Nos. NPF-44 and NPF-56 Enclosure: Peach Bottom Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16060A376 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME ATurilin/ AT BSmith/ BS via email JHeinly/ JH via email DSchroeder/ DLS DATE 02/25 /16 02/ 25 /16 02/24 /16 02/29 /16

Page 1 of 2 Peach Bottom 02/24/2016 16:00:45 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111117T - PERMANENT PLANT MODIFICATIONS 3 2, 3 01/25/2016 01/29/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 02/08/2016 02/12/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP EXERCISE EVALUATION 4 2, 3 04/25/2016 04/29/2016 IP 7111401 Exercise Evaluation RS1234 - HP INSPECTION 1 2, 3 03/06/2016 03/10/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/06/2016 03/10/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 03/06/2016 03/10/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 03/06/2016 03/10/2016 IP 71124.04 Occupational Dose Assessment RS567PPI - HP TEAM INSPECTION 3 2, 3 06/06/2016 06/10/2016 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 06/06/2016 06/10/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 06/06/2016 06/10/2016 IP 71124.07 Radiological Environmental Monitoring Program 2 06/06/2016 06/10/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111107T - TRIENNIAL HEAT SINK 1 2, 3 06/13/2016 06/17/2016 IP 7111107T Heat Sink Performance 3/20EXAM - PEACH BOTTOM INITIAL EXAM 4 2 02/20/2017 02/24/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 2 03/20/2017 03/31/2017 U01942 FY-17-PB INITIAL OPERATOR LICENSING EXAM 7111108G - PB U2 INSERVICE INSPECTION 1 2 10/31/2016 11/04/2016 IP 7111108G Inservice Inspection Activities - BWR RS1234PI - HP INSPECTION 1 2, 3 10/31/2016 11/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/31/2016 11/04/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/31/2016 11/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/31/2016 11/04/2016 IP 71124.04 Occupational Dose Assessment 2, 3 10/31/2016 11/04/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111111B - PB REQUAL INSP WITH P/F RESULTS 2 2, 3 03/06/2017 03/10/2017 IP 7111111B Licensed Operator Requalification Program CBDI - COMPONENT DESIGN BASIS INSPECTION 6 2, 3 01/30/2017 02/03/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/13/2017 02/17/2017 IP 7111121 Component Design Bases Inspection 2, 3 02/27/2017 03/03/2017 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Peach Bottom 02/24/2016 16:00:45 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 1 2, 3 03/27/2017 03/31/2017 IP 7111402 Alert and Notification System Testing 2, 3 03/27/2017 03/31/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 03/27/2017 03/31/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification 71152B - PI&R BIENNIAL 2 2, 3 03/13/2017 03/17/2017 IP 71152B Problem Identification and Resolution 2, 3 03/27/2017 03/31/2017 IP 71152B Problem Identification and Resolution RS12 - HP INSPECTION 1 2, 3 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 2, 3 05/08/2017 05/12/2017 IP 60855 Operation Of An ISFSI 2, 3 05/08/2017 05/12/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RS34 - HP INSPECTION 1 2, 3 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 05/08/2017 05/12/2017 IP 71124.04 Occupational Dose Assessment 2 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 2, 3 07/17/2017 07/21/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS123 - HP INSPECTION 1 2, 3 10/23/2017 10/27/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/23/2017 10/27/2017 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/23/2017 10/27/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 10/23/2017 10/27/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 7111108G - U3 INSERVICE INSPECTION 1 3 10/30/2017 11/03/2017 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.