ML17228A553: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DI UTION DEMONST.TION SYSTEM 4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9405180026 DOC.DATE: 9@/4~4.NOTARIZED:
{{#Wiki_filter:ACCELERATED DI                         UTION DEMONST.             TION SYSTEM 4
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION WHITE,C.D.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Florida Power&Light Co.SAGER,D.A.
ACCESSION NBR:9405180026               DOC.DATE: 9@/4~4. NOTARIZED: NO             DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power               & Light   Co.       05000335 50-389 St. Lucie Plant, Unit 2, Florida Power             & Light   Co.       05000389 AUTH. NAME             AUTHOR AFFILIATION WHITE,C.D.           Florida     Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
SAGER,D.A.           Florida     Power & Light Co.
RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Month o crating repts for Apr 1994 for St Lucie Units 1&2.W/940512 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTRI ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DS P/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL EG&G BRYCE i J~H NSIC COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/DOA RR~ORS OEAB REG FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
Month       o crating repts for Apr       1994 for St Lucie Units     1 &
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21  
2.W/940512     ltr.                                                                 D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTRI                 ENCL   J   SIZE:
.~P.O.Box 12S, Ft.Pierce, FL 34954-0128 May 12, 1994 L-94-120 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort=Attached are the April, 1994, Operating Status and Summary of Operating Experience Reports for St.Lucie, Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, D.A.Vice r St.L i ger sident e Plant DAS/CDW/kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL 81121-94 9405180026,940430
TITLE: Monthly Operating Report (per Tech Specs)
~~~o c''., PDR ADOCK 05000335'u<", R,-PDR an FPL Group company g)i
NOTES:
~(~~kj OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 5/9/94 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: APRIL 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON"LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNZT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 1 CYCLE 13 REFUELING OUTAGE SCHEDULED 719 710.2 0.0 659.4 0.0 1741819 572710 541166 91.7 91.7 89.7 90.7 8.3 2879 2772.4 0.0 2714.7 0.0 7229577 2374370 2246703 94.3 94.3 93.0 94.0 5.7 152159.0 118302.4 205.3 117069.6 39.3 302994878 99987660 94505065 76.9 77.0 76.4 75.7 4.0 TO BEGIN OCTOBER 15, 1994.25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
RECIPIENT                COPIES          RECIPIENT           COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL            D PD2-2 PD                     1    1    NORRIS,J                1    1 INTERNAL: ACRS                         10    10    AEOD/DOA                1    1              D AEOD/DS P/TPAB               1    1      RR~ORS OEAB            1    1 NRR/DRIL/RPEB                 1    1    REG  FILE      01      1    1 RGN2                         1    1 EXTERNAL   EG &G BRYCE i J ~ H           1     1     NRC PDR                 1     1 NSIC                          1     1 D
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO~.UNIT: DATE COMPLETED BY: TELEPHONE:
D NOTE TO ALL "RIDS" RECIPIENTS:
50-335 St.Lucie g1 05/09/94 C.D.White (407)468-4248 DAY MONTH APRIL 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)4/01/94 4/02/94 4/03/94 4/04/94 4/05/94 4/06/94 4/07/94 4/08/94 4/09/94 4/10/94 4/11/94 4/12/94 4/13/94 4/14/94 4/15/94 4/16/94 4/17/94 4/18/94 4/19/94 4/20/94 4/21/94 4/22/94 4/23/94 4/24/94 4/25/94 4/26/94 4/27/94 4/28/94 4/29/94 4/30/94-34 66-31 668 847 854 854 851 851 846 850 850 849 849 853 854 852 845 844 843 841 842 844 836 833 834 832 828 781 818 4l  
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               21   ENCL   21
 
                            .   ~                       P.O. Box 12S, Ft. Pierce, FL 34954-0128 May 12, 1994                         L-94-120 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:       St. Lucie Units         1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort               =
Attached are the April, 1994, Operating Status                                 and Summary       of Operating Experience Reports for St. Lucie, Units                           1   and 2.
Should there be any questions on                 this information, please contact us ~
Very     truly yours, D. A.           ger Vice       r sident St. L           ie  Plant DAS/CDW/kw cc:       Stewart D. Ebneter, Regional Administrator, Region                               II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL 81121-94 c''        9405180026,940430 PDR      ADOCK 05000335
~ ~~ o <      .,
R, g)i
                                              'u PDR an FPL Group company
 
    ~ (
~ ~
kj
 
OPERATING DATA REPORT DOCKET NO         50 - 335 DATE               5/ 9/94 COMPLETED BY   C. D. WHITE TELEPHONE     407/468/4248 OPERATING STATUS
: 1. UNIT NAME: ST. LUCIE     UNIT 1
: 2. REPORTING PERIOD:   APRIL 1994
: 3. LICENSED THERMAL POWER (MWT):                 2700
: 4. NAMEPLATE RATING (GROSS MWE):                 850
: 5. DESIGN ELECTRICAL RATING (NET MWE):           830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):       872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):         839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        719      2879        152159.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL           710.2    2772.4      118302.4
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0        205.3 14 'OURS GENERATOR ON"LINE                         659.4    2714.7      117069. 6
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0          39.3
: 16. GROSS THERMAL ENERGY GENERATED (MWH)         1741819  7229577    302994878
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       572710  2374370      99987660
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         541166  2246703      94505065
: 19. UNIT SERVICE FACTOR                             91.7      94.3          76.9
: 20. UNIT AVAILABILITYFACTOR                          91.7      94.3          77.0
: 21. CAPACITY FACTOR (USING MDC NET)                 89.7      93.0          76.4
: 22. CAPACITY FACTOR (USING DER NET)                 90.7      94.0          75.7
: 23. UNZT FORCED OUTAGE RATE                           8.3        5.7          4.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 1 CYCLE 13 REFUELING OUTAGE SCHEDULED TO BEGIN OCTOBER 15,   1994.
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET   NO ~ . 50-335 UNIT:          St. Lucie g1 DATE            05/09/94 COMPLETED BY:  C. D. White TELEPHONE:      (407) 468-4248 MONTH APRIL   1994 DAY      AVERAGE DAILY POWER LEVEL (MWe-Net) 4/01/94             -34 4/02/94               66 4/03/94             -31 4/04/94             668 4/05/94             847 4/06/94             854 4/07/94             854 4/08/94             851 4/09/94             851 4/10/94             846 4/11/94             850 4/12/94             850 4/13/94             849 4/14/94             849 4/15/94             853 4/16/94             854 4/17/94             852 4/18/94             845 4/19/94             844 4/20/94             843 4/21/94             841 4/22/94             842 4/23/94             844 4/24/94             836 4/25/94             833 4/26/94             834 4/27/94             832 4/28/94             828 4/29/94             781 4/30/94             818
 
4l


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO~.UNIT DATE: COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO ~ . 50-335 UNIT            St. Lucie g1 DATE:          05/09/94 COMPLETED BY:  C. D. White TELEPHONE:      (407) 468-4248 REPORT MONTH   APRIL 1994 Unit 1 was off-line until April 2,1994, to repair a shutdown cooling suction isolation valve. The repair was completed and reactor power was increased to approximately 204. On April 2, 1994, the unit was held at 204 to repair the 1A startup transformer breaker. On April 3, 1994, the unit tripped automatically due to a control element drive mechanism bus overcurrent and undervoltage transient caused by a procedural error. On April 4,1994, Unit 1 was increased in power and the average daily power level remained above 804 for the rest of the month.
50-335 St.Lucie g1 05/09/94 C.D.White (407)468-4248 REPORT MONTH APRIL 1994 Unit 1 was off-line until April 2,1994, to repair a shutdown cooling suction isolation valve.The repair was completed and reactor power was increased to approximately 204.On April 2, 1994, the unit was held at 204 to repair the 1A startup transformer breaker.On April 3, 1994, the unit tripped automatically due to a control element drive mechanism bus overcurrent and undervoltage transient caused by a procedural error.On April 4,1994, Unit 1 was increased in power and the average daily power level remained above 804 for the rest of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.  
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
'I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 05/09/94 COMPLETED BY: C.D.WHITE TELEPHONE:
 
(407)468-4248 REPORT MONTH APRIL 1 4 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Codes Component Codes Cause&Corrective Action to Prevent Recurrence 3/29/94 4/2/94 35.3 0.0 B N/A N/A CF EB VALVES TRANS F Unit 1 remained off-line to repair a shutdown cooling system suction isolation valve.Unit 1 remained at low power to repair the 1A startup transformer breaker.4/3/94 24.3 G LER 94-04 ED GENERA Unit 1 reactor/turbine trip due to procedural error.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training de License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Insttuctions for Preparation of Data Entry Shccts Licenscc Event Rcport (LER)File (NUREG4161)
'I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                   50-335 UNIT NAME:                     ST LUCIE UNIT I DATE:                         05/09/94 COMPLETED BY:                 C. D. WHITE TELEPHONE:                     (407) 468-4248 REPORT MONTH APRIL                   1   4 No.         Date Type Duration   Reason         Method of         Licensee     System       Component                 Cause     & Corrective (Hours)                    Shutting        Event Report    Codes            Codes                        Action to Down                                                                    Prevent Recurrence Reactor 3/29/94       35.3         B                               N/A         CF           VALVES   Unit 1 remained off-line to repair       a shutdown cooling system suction isolation valve.
Exhibit 1-Same Source OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 5/9/94 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCZE UNIT 2 2.REPORTING PERIOD: 'PRIL 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10 REASONS FOR RESTRICTIONS g ZF ANY'ONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVZCE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 719 192.3 0.0 82.6 0.0 105358 30760 13815 11.5 11.5 2.3 2.3 58.9 2879 1248.4 0.0 1138.7 0.0 2913584 941450 870046 39.6 39.6 36.0 36.4 9.4 94056.0 78412.1 0.0 77034.0 0.0 199874509 66451000 62771217 81.9 81.9 80.5 80.9 7.4 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTZMATED DATE OF STARTUP:  
4/2/94        0.0                                          N/A          EB          TRANSF  Unit 1 remained at low power to repair the 1A startup transformer breaker.
-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO~'NIT DATE: COMPLETED BY TELEPHONE:
4/3/94       24.3         G                           LER 94-04       ED         GENERA   Unit 1 reactor/turbine trip due to procedural error.
50-389 St.Lucie g2 05/09/94, C.D.White (407)468-4248 MONTH APRZL 1994 DAY 4/01/94 4/02/94 4/03/94 4/04/94 4/05/94 4/06/94 4/07/94 4/08/94 4/09/94 4/10/94 4/11/94 4/12/94 4/13/94 4/14/94 4/15/94 4/16/94 4/17/94 4/18/94 4/19/94 4/20/94 4/21/94 4/22/94 4/23/94 4/24/94 4/25/94 4/26/94 4/27/94 4/28/94 4/29/94 4/30/94 AVERAGE DAZLY POWER LEVEL (MWe-Net)-12-12-11-12-11-9-9-9-11-12-12-13-17-24-28-30-30-31-32-32-32 36 69-32-32-32-32 65 363 558  
F Forced                         Reason                                        Method                                    Exhibit G - Insttuctions for S Scheduled                     A - Equipment failure (explain)               1 - Manual                                Preparation of Data Entry B - Maintenance or Test                       2 - Manual Scram                          Shccts Licenscc Event Rcport C - Refueling                                 3 - Automatic Scram                        (LER) File (NUREG4161)
'I  
D - Regulatory restriction                     4 - Continued E - Operator Training de License Examination   5 - Load Reduction F - Administrative                             9 - Other (Explain)                       Exhibit  1 - Same Source G - Operational Error (Explain)
H - Other (Explain)
 
OPERATING DATA REPORT DOCKET NO           50 - 389 DATE                 5/ 9/94 COMPLETED BY   C. D. WHITE TELEPHONE     407/468/4248 OPERATING STATUS
: 1. UNIT NAME: ST. LUCZE     UNIT 2
: 2. REPORTING PERIOD:   'PRIL   1994
: 3. LICENSED THERMAL POWER (MWT):                 2700
: 4. NAMEPLATE RATING (GROSS MWE):                   850
: 5. DESIGN ELECTRICAL RATING (NET MWE):             830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):       882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):         839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED,   IF ANY (NET MWE) 10   REASONS FOR RESTRICTIONS g ZF ANY
                                      'ONTHLY               -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        719      2879          94056.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL           192.3    1248.4        78412.1
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0          0.0
: 14. HOURS GENERATOR ON-LINE                         82.6    1138.7        77034.0
: 15. UNIT RESERVE SHUTDOWN HOURS                       0.0        0.0          0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)           105358  2913584    199874509
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)         30760    941450      66451000
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           13815    870046      62771217
: 19. UNIT SERVZCE FACTOR                             11.5      39.6          81.9
: 20. UNIT AVAILABILITYFACTOR                          11. 5      39.6          81.9
: 21. CAPACITY FACTOR (USING MDC NET)                   2.3      36.0          80.5
: 22. CAPACITY FACTOR (USING DER NET)                   2.3      36.4          80.9
: 23. UNIT FORCED OUTAGE RATE                         58.9       9.4           7.4
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTZMATED DATE OF STARTUP:
 
-AVERAGE DAILY UNIT POWER   LEVEL DOCKET NO ~     50-389
                              'NIT St. Lucie g2 DATE:            05/09/94, COMPLETED BY      C. D. White TELEPHONE:        (407) 468-4248 MONTH APRZL   1994 DAY       AVERAGE DAZLY POWER LEVEL (MWe-Net) 4/01/94             -12 4/02/94             -12 4/03/94             -11 4/04/94             -12 4/05/94             -11 4/06/94               -9 4/07/94               -9 4/08/94               -9 4/09/94             -11 4/10/94             -12 4/11/94             -12 4/12/94             -13 4/13/94             -17 4/14/94             -24 4/15/94             -28 4/16/94             -30 4/17/94             -30 4/18/94             -31 4/19/94             -32 4/20/94             -32 4/21/94             -32 4/22/94               36 4/23/94               69 4/24/94             -32 4/25/94             -32 4/26/94             -32 4/27/94             -32 4/28/94               65 4/29/94             363 4/30/94             558
 
'I


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.: UNIT0 DATE COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.:   50-389 UNIT0          St. Lucie g2 DATE          05/09/94 COMPLETED BY:  C. D. White TELEPHONE:    (407) 468-4248 REPORT MONTH   APRIL 1994 Unit 2 continued its Cycle 8 refueling outage until April 22, 1994.
50-389 St.Lucie g2 05/09/94 C.D.White (407)468-4248 REPORT MONTH APRIL 1994 Unit 2 continued its Cycle 8 refueling outage until April 22, 1994.The unit was then operated at low power for post refueling outage testing until April 23, 1994.The unit automatically tripped on April 23, 1994 during testing due to a wiring error in the RPS channel B bypass circuit.On April 26, 1994, the unit was operated at low power during repairs to the turbine steam bypass system.From April 28, 1994, until April 30, 1994, power was increased and then held at approximately 50%for physics testing.Power was then increased to approximately 65~and held for chemistry purposes for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
The unit was then operated at low power for post refueling outage testing until April 23, 1994. The unit automatically tripped on April 23, 1994 during testing due to a wiring error in the RPS channel B bypass circuit. On April 26, 1994, the unit was operated at low power during repairs to the turbine steam bypass system.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME DATE COMPLETED BY: TELEPHONE:
From April 28, 1994, until April 30, 1994, power was increased and then held at approximately 50% for physics testing. Power was then increased to approximately 65~ and held for chemistry purposes for the remainder of the month.
50-389 ST LUCIE UNIT 2.05/09/94 C.D.WHITE~(407)468-4248 REPORT MONTH APRIL 1 4 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee Event Report System Codes Component Codes Cause&Corrective Action to Prevent Recurrence 2/14/94 4/22/94 513.9 0.0 B N/A N/A RC RC FUELXX Unit 2 operated at reduced power for post refueling tests.FUELXX Unit 2 was off-line for Cycle 8 refueling.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
4/23/94 4/27/94 4/29/94 4/30/94~F 82.7 35.7 0.0 0.0 A B B B LER 94-03 N/A N/A N/A IA RC PC INSTRU VALVES FUELXX zzzzzz Unit 2 tripped during testing due to an improperly wired RPS channel B bypass circuit.Unit 2 remained at reduced power due to a problem with the turbine steam bypass system Unit 2 was held at approximately 50%power for physics testing.Unit 2 was held at approximately 65%power for chemistry testing.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 8h Liccnsc Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for preparation of Data Entry Sheets Licenscc Event Report (LER)File (NUREG4161)
 
Exhibit 1-Same Source I l~~~}}
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:                   50-389 UNIT NAME                      ST LUCIE UNIT 2 .
DATE                          05/09/94 COMPLETED BY: C. D. WHITE                           ~
TELEPHONE:                    (407) 468-4248 REPORT MONTH APRIL                   1   4 No.         Date Type Duration   Reason         Method of         Licensee     System       Component                 Cause   & Corrective (Hours)                    Shutting        Event Report    Codes            Codes                        Action to Down                                                                    Prevent Recurrence Reactor 2/14/94       513.9                                        N/A          RC          FUELXX  Unit 2 was off-line for Cycle      8  refueling.
4/22/94       0.0           B                             N/A           RC         FUELXX   Unit 2 operated at reduced power for post refueling tests.
4/23/94 ~ F   82.7         A                           LER 94-03       IA         INSTRU   Unit 2 tripped during testing due to an improperly wired RPS channel B bypass circuit .
4/27/94      35.7          B                              N/A                      VALVES  Unit 2 remained at reduced power due to           a problem with the turbine steam bypass system 4/29/94        0.0          B                              N/A          RC          FUELXX  Unit 2 was held at approximately 50% power for physics testing.
4/30/94        0.0          B                              N/A          PC          zzzzzz  Unit 2 was held at approximately 65% power for chemistry testing.
F Forced                         Reason                                        Method                                    Exhibit G - Instructions for S Scheduled                     A - Equipment failure (explain)               1 - Manual                                preparation of Data Entry B - Maintenance or Test                       2- Manual Scram                            Sheets Licenscc Event Report C - Refueling                                 3 - Automatic Scram                        (LER) File (NUREG4161)
D - Regulatory restriction                     4 - Continued E - Operator Training 8h Liccnsc Examination   5 - Load Reduction F - Administrative                             9 - Other (Explain)                       Exhibit  1 - Same Source G - Operational Error (Explain)
H - Other (Explain)
 
I l ~ ~ ~}}

Latest revision as of 12:35, 4 February 2020

Monthly Operating Repts for Apr 1994 for St Lucie Units 1 & 2.W/940512 Ltr
ML17228A553
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/30/1994
From: Sager D, Charlotte White
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-120, NUDOCS 9405180026
Download: ML17228A553 (15)


Text

ACCELERATED DI UTION DEMONST. TION SYSTEM 4

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9405180026 DOC.DATE: 9@/4~4. NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WHITE,C.D. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Month o crating repts for Apr 1994 for St Lucie Units 1 &

2.W/940512 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTRI ENCL J SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 D AEOD/DS P/TPAB 1 1 RR~ORS OEAB 1 1 NRR/DRIL/RPEB 1 1 REG FILE 01 1 1 RGN2 1 1 EXTERNAL EG &G BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

. ~ P.O. Box 12S, Ft. Pierce, FL 34954-0128 May 12, 1994 L-94-120 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort =

Attached are the April, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie, Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, D. A. ger Vice r sident St. L ie Plant DAS/CDW/kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL 81121-94 c 9405180026,940430 PDR ADOCK 05000335

~ ~~ o < .,

R, g)i

'u PDR an FPL Group company

~ (

~ ~

kj

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 5/ 9/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: APRIL 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 719 2879 152159.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 710.2 2772.4 118302.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3 14 'OURS GENERATOR ON"LINE 659.4 2714.7 117069. 6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1741819 7229577 302994878
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 572710 2374370 99987660
18. NET ELECTRICAL ENERGY GENERATED (MWH) 541166 2246703 94505065
19. UNIT SERVICE FACTOR 91.7 94.3 76.9
20. UNIT AVAILABILITYFACTOR 91.7 94.3 77.0
21. CAPACITY FACTOR (USING MDC NET) 89.7 93.0 76.4
22. CAPACITY FACTOR (USING DER NET) 90.7 94.0 75.7
23. UNZT FORCED OUTAGE RATE 8.3 5.7 4.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 1 CYCLE 13 REFUELING OUTAGE SCHEDULED TO BEGIN OCTOBER 15, 1994.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ . 50-335 UNIT: St. Lucie g1 DATE 05/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 MONTH APRIL 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 4/01/94 -34 4/02/94 66 4/03/94 -31 4/04/94 668 4/05/94 847 4/06/94 854 4/07/94 854 4/08/94 851 4/09/94 851 4/10/94 846 4/11/94 850 4/12/94 850 4/13/94 849 4/14/94 849 4/15/94 853 4/16/94 854 4/17/94 852 4/18/94 845 4/19/94 844 4/20/94 843 4/21/94 841 4/22/94 842 4/23/94 844 4/24/94 836 4/25/94 833 4/26/94 834 4/27/94 832 4/28/94 828 4/29/94 781 4/30/94 818

4l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ . 50-335 UNIT St. Lucie g1 DATE: 05/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 REPORT MONTH APRIL 1994 Unit 1 was off-line until April 2,1994, to repair a shutdown cooling suction isolation valve. The repair was completed and reactor power was increased to approximately 204. On April 2, 1994, the unit was held at 204 to repair the 1A startup transformer breaker. On April 3, 1994, the unit tripped automatically due to a control element drive mechanism bus overcurrent and undervoltage transient caused by a procedural error. On April 4,1994, Unit 1 was increased in power and the average daily power level remained above 804 for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

'I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 05/09/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH APRIL 1 4 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Report Codes Codes Action to Down Prevent Recurrence Reactor 3/29/94 35.3 B N/A CF VALVES Unit 1 remained off-line to repair a shutdown cooling system suction isolation valve.

4/2/94 0.0 N/A EB TRANSF Unit 1 remained at low power to repair the 1A startup transformer breaker.

4/3/94 24.3 G LER 94-04 ED GENERA Unit 1 reactor/turbine trip due to procedural error.

F Forced Reason Method Exhibit G - Insttuctions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Licenscc Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training de License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 5/ 9/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCZE UNIT 2
2. REPORTING PERIOD: 'PRIL 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS g ZF ANY

'ONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 719 2879 94056.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 192.3 1248.4 78412.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 82.6 1138.7 77034.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 105358 2913584 199874509
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 30760 941450 66451000
18. NET ELECTRICAL ENERGY GENERATED (MWH) 13815 870046 62771217
19. UNIT SERVZCE FACTOR 11.5 39.6 81.9
20. UNIT AVAILABILITYFACTOR 11. 5 39.6 81.9
21. CAPACITY FACTOR (USING MDC NET) 2.3 36.0 80.5
22. CAPACITY FACTOR (USING DER NET) 2.3 36.4 80.9
23. UNIT FORCED OUTAGE RATE 58.9 9.4 7.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTZMATED DATE OF STARTUP:

-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-389

'NIT St. Lucie g2 DATE: 05/09/94, COMPLETED BY C. D. White TELEPHONE: (407) 468-4248 MONTH APRZL 1994 DAY AVERAGE DAZLY POWER LEVEL (MWe-Net) 4/01/94 -12 4/02/94 -12 4/03/94 -11 4/04/94 -12 4/05/94 -11 4/06/94 -9 4/07/94 -9 4/08/94 -9 4/09/94 -11 4/10/94 -12 4/11/94 -12 4/12/94 -13 4/13/94 -17 4/14/94 -24 4/15/94 -28 4/16/94 -30 4/17/94 -30 4/18/94 -31 4/19/94 -32 4/20/94 -32 4/21/94 -32 4/22/94 36 4/23/94 69 4/24/94 -32 4/25/94 -32 4/26/94 -32 4/27/94 -32 4/28/94 65 4/29/94 363 4/30/94 558

'I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT0 St. Lucie g2 DATE 05/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 REPORT MONTH APRIL 1994 Unit 2 continued its Cycle 8 refueling outage until April 22, 1994.

The unit was then operated at low power for post refueling outage testing until April 23, 1994. The unit automatically tripped on April 23, 1994 during testing due to a wiring error in the RPS channel B bypass circuit. On April 26, 1994, the unit was operated at low power during repairs to the turbine steam bypass system.

From April 28, 1994, until April 30, 1994, power was increased and then held at approximately 50% for physics testing. Power was then increased to approximately 65~ and held for chemistry purposes for the remainder of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME ST LUCIE UNIT 2 .

DATE 05/09/94 COMPLETED BY: C. D. WHITE ~

TELEPHONE: (407) 468-4248 REPORT MONTH APRIL 1 4 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Report Codes Codes Action to Down Prevent Recurrence Reactor 2/14/94 513.9 N/A RC FUELXX Unit 2 was off-line for Cycle 8 refueling.

4/22/94 0.0 B N/A RC FUELXX Unit 2 operated at reduced power for post refueling tests.

4/23/94 ~ F 82.7 A LER 94-03 IA INSTRU Unit 2 tripped during testing due to an improperly wired RPS channel B bypass circuit .

4/27/94 35.7 B N/A VALVES Unit 2 remained at reduced power due to a problem with the turbine steam bypass system 4/29/94 0.0 B N/A RC FUELXX Unit 2 was held at approximately 50% power for physics testing.

4/30/94 0.0 B N/A PC zzzzzz Unit 2 was held at approximately 65% power for chemistry testing.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual preparation of Data Entry B - Maintenance or Test 2- Manual Scram Sheets Licenscc Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training 8h Liccnsc Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

I l ~ ~ ~