{{#Wiki_filter:VIRGI_NIA.
{{#Wiki_filter:VIRGI_NIA. ELECTRIC A.ND PowE:a COMPANY RICHMOND, VIRGINIA 23261 narch 1 , 1979
ELECTRIC A.ND PowE:a COMPANY RICHMOND, VIRGINIA 23261 narch 1 , 1979 !lr. James P. O'Reilly, Director Office of Inspection and Enforcement
!lr. James P. O'Reilly, Director                       Serfol Ho. 121 Office of Inspection and Enforcement                   PO/DLB:scj
: u. s. ~iuclear Regulatory Co~ission Region II 101 Marietta Street, Suite 3100 Atlanta, Geor 6 ia. 30303  
: u. s. ~iuclear Regulatory Co~ission                     Docket ~:os.: SC-280 Region II                                                             50-281 101 Marietta Street, Suite 3100                       License N'os.: DPR-32 Atlanta, Geor 6 ia. 30303                                             DPR-37


==Dear }1r~ O'Reilly:==
==Dear }1r~ O'Reilly:==


Serfol Ho. PO/DLB:scj Docket ~:os.: License N'os.: 121 SC-280 50-281 DPR-32 DPR-37 Enclosed are the Annual Operating P.eport, the Report of Radioactivity in Effluent Releases and Solid Wastes, and the Report of Radiological Environmental
Enclosed are the Annual Operating P.eport, the Report of Radioactivity in Effluent Releases and Solid Wastes, and the Report of Radiological Environmental :!onitoring for Surry Power Station Unit Nos.land 2 as required by Surry Technical Specifications 6.6.l.b, 6.6.3.b., and 6.6.3.c.,
:!onitoring for Surry Power Station Unit Nos.land 2 as required by Surry Technical Specifications 6.6.l.b, 6.6.3.b., and 6.6.3.c., respectively.
respectively. As explained in the Report of Radiological Environmental
As explained in the Report of Radiological Environmental  
~[onitoring, the operation of Surry Power Station has produced no detectable increase in off.site environmental dose rates.
~[onitoring, the operation of Surry Power Station has produced no detectable increase in off.site environmental dose rates.
* The ?..eport of Non-P.adiological Environmental Monitoring required by '!.'echnical Specification 6.6.3.d. will be forwarded by t!arch 15. 1979. Attachments (2 copies) cc: ::r. John G. Davis, Acting Director Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations Office of Inspection and Enforcement (6 copiea) 7903 070 3 75"}}
* The ?..eport of Non-P.adiological Environmental Monitoring required by
'!.'echnical Specification 6.6.3.d. will be forwarded by t!arch 15. 1979.
Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations Attachments (2 copies) cc:   ::r. John G. Davis, Acting Director Office of Inspection and Enforcement (6 copiea) 7903 070 3   75"}}

Latest revision as of 08:05, 21 October 2019

Forwards Annual Operating Rept,1978, Environ Monitoring Rept,1978, & Rept of Radioactivity in Effluent Releases & Solid Wastes,1978.
ML18113A886
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/01/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18113A887 List:
References
NUDOCS 7903070375
Download: ML18113A886 (1)


Text

VIRGI_NIA. ELECTRIC A.ND PowE:a COMPANY RICHMOND, VIRGINIA 23261 narch 1 , 1979

!lr. James P. O'Reilly, Director Serfol Ho. 121 Office of Inspection and Enforcement PO/DLB:scj

u. s. ~iuclear Regulatory Co~ission Docket ~:os.: SC-280 Region II 50-281 101 Marietta Street, Suite 3100 License N'os.: DPR-32 Atlanta, Geor 6 ia. 30303 DPR-37

Dear }1r~ O'Reilly:

Enclosed are the Annual Operating P.eport, the Report of Radioactivity in Effluent Releases and Solid Wastes, and the Report of Radiological Environmental :!onitoring for Surry Power Station Unit Nos.land 2 as required by Surry Technical Specifications 6.6.l.b, 6.6.3.b., and 6.6.3.c.,

respectively. As explained in the Report of Radiological Environmental

~[onitoring, the operation of Surry Power Station has produced no detectable increase in off.site environmental dose rates.

  • The ?..eport of Non-P.adiological Environmental Monitoring required by

'!.'echnical Specification 6.6.3.d. will be forwarded by t!arch 15. 1979.

Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations Attachments (2 copies) cc:  ::r. John G. Davis, Acting Director Office of Inspection and Enforcement (6 copiea) 7903 070 3 75"