VIRGI_NIA. ELECTRIC A.ND PowE:a COMPANY RICHMOND, VIRGINIA 23261 narch 1, 1979
!lr. James P. O'Reilly, Director Office of Inspection and Enforcement
- u. s. ~iuclear Regulatory Co~ission Region II 101 Marietta Street, Suite 3100 Atlanta, Geor6ia. 30303
Dear }1r~ O'Reilly:
Serfol Ho.
PO/DLB:scj Docket ~:os.:
License N'os.:
121 SC-280 50-281 DPR-32 DPR-37 Enclosed are the Annual Operating P.eport, the Report of Radioactivity in Effluent Releases and Solid Wastes, and the Report of Radiological Environmental :!onitoring for Surry Power Station Unit Nos.land 2 as required by Surry Technical Specifications 6.6.l.b, 6.6.3.b., and 6.6.3.c.,
respectively.
As explained in the Report of Radiological Environmental
~[onitoring, the operation of Surry Power Station has produced no detectable increase in off.site environmental dose rates.
The ?..eport of Non-P.adiological Environmental Monitoring required by
'!.'echnical Specification 6.6.3.d. will be forwarded by t!arch 15. 1979.
Attachments (2 copies) cc: ::r. John G. Davis, Acting Director Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations Office of Inspection and Enforcement (6 copiea) 7903 070 3 75"