{{Adams|number = ML091620529}}
{{Adams
| number = ML091620529
| issue date = 06/09/2009
| title = IR 05000346-09-502 on 05/11/2009 - 05/15/2009 for Davis-Besse, Baseline Emergency Preparedness Biennial Exercise Inspection
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Allen B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| license number = NPF-003
| contact person =
| document report number = IR-09-502
| document type = Inspection Report, Letter
| page count = 13
}}


{{IR-Nav| site = 05000346 | year = 2009 | report number = 502 }}
{{IR-Nav| site = 05000346 | year = 2009 | report number = 502 }}
Line 16: Line 30:
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA by B. Palagi for/
Sincerely,/RA by B. Palagi for/  
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3  
 
Hironori Peterson, Chief Operations Branch Division of Reactor Safety  
 
Docket No. 50-346 License No. NPF-3  


===Enclosure:===
===Enclosure:===
Line 23: Line 40:


===w/Attachment:===
===w/Attachment:===
Supplemental Information See Attached Distribution Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/20009502 Dear M
Supplemental Information See Attached Distribution
 
Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
 
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/20009502 Dear M


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
Line 31: Line 52:


===A. NRC-Identified===
===A. NRC-Identified===
and Self-Revealed Findings  
and Self-Revealed Findings


===Cornerstone: Emergency Preparedness===
===Cornerstone: Emergency Preparedness===
Line 37: Line 58:


===B. Licensee-Identified Violations===
===B. Licensee-Identified Violations===
None.
None.


Line 93: Line 115:
==4OA5 Other Activities==
==4OA5 Other Activities==


===.1 (Closed) NRC Temporary Instruction (TI) 2515/175 "Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review" The inspector performed TI 2515/175, ensured the completeness of the TI's Attachment 1, and then forwarded the data to NRC, Headquarters. 4OA6===
===.1 (Closed) NRC Temporary Instruction (TI) 2515/175 "Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review"===
Management Meetings
 
The inspector performed TI 2515/175, ensured the completeness of the TI's Attachment 1, and then forwarded the data to NRC, Headquarters.
{{a|4OA6}}
==4OA6 Management Meetings==
 
===.1 Exit Meeting Summary===
 
On May 15, 2009, the inspectors presented the inspection results to Mr. B. Allen and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.


===.1 Exit Meeting Summary On May 15, 2009, the inspectors presented the inspection results to Mr. B. Allen and other members of the licensee staff.===
ATTACHMENT:   
The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. ATTACHMENT:   


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
Licensee  
Licensee  
: [[contact::B. Allen]], Site Vice-President  
: [[contact::B. Allen]], Site Vice-President  
Line 124: Line 153:
: [[contact::J. Vetter]], Performance Improvement and Emergency Response Manager  
: [[contact::J. Vetter]], Performance Improvement and Emergency Response Manager  
: [[contact::M. Widner]], Site Projects Manager  
: [[contact::M. Widner]], Site Projects Manager  
: [[contact::D. Wuokko]], Regulatory Compliance Manager Nuclear Regulatory Commission  
: [[contact::D. Wuokko]], Regulatory Compliance Manager
Nuclear Regulatory Commission
: [[contact::J. Rutkowski]], Senior Resident Inspector  
: [[contact::J. Rutkowski]], Senior Resident Inspector  
: [[contact::A. Wilson]], Resident Inspector
: [[contact::A. Wilson]], Resident Inspector  
 
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
Opened, Closed, and Discussed None
 
===Opened, Closed, and Discussed===
 
None
 
2
2
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
The following is a list of documents reviewed during the inspection.
The following is a list of documents reviewed during the inspection.
: Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
: Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1EP1 Exercise Evaluation
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1EP1 Exercise Evaluation Davis-Besse Nuclear Power Station Emergency Plan; Revision 26
: Davis-Besse Nuclear Power Station Emergency Plan; Revision 26
: Davis-Besse Nuclear Power Station Emergency Preparedness 2009 Evaluated Exercise; May 12, 2009
: Davis-Besse Nuclear Power Station Emergency Preparedness 2009 Evaluated Exercise; May 12, 2009
: RA-EP-02110; Emergency Notification; Revision 9
: RA-EP-02110; Emergency Notification; Revision 9
Line 164: Line 198:
: NOBP-LP-4012-55; Emergency Response Organization Drill Participation Records; January 2008 through March 2009
: NOBP-LP-4012-55; Emergency Response Organization Drill Participation Records; January 2008 through March 2009
: CR 09-51704; NRC Performance Indicator for ERO Participation Data Submittal Correction; dated January 5, 2009
: CR 09-51704; NRC Performance Indicator for ERO Participation Data Submittal Correction; dated January 5, 2009
: CR 09-51796; Misunderstanding of Impact of Changing Position Descriptions in FITS for ERO Participation Performance Indicator; dated January 5, 2009  
: CR 09-51796; Misunderstanding of Impact of Changing Position Descriptions in FITS for ERO Participation Performance Indicator; dated January 5, 2009  
: 4
: 4
==LIST OF ACRONYMS==
==LIST OF ACRONYMS==
Line 176: Line 210:
: [[EP]] [[Emergency Preparedness]]
: [[EP]] [[Emergency Preparedness]]
: [[ERO]] [[Emergency Response Organization]]
: [[ERO]] [[Emergency Response Organization]]
: [[IP]] [[Inspection Procedure KI Potassium Iodide]]
: [[IP]] [[Inspection Procedure]]
: [[KI]] [[Potassium Iodide]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NUREG]] [[Nuclear Regulatory Commission]]
: [[NUREG]] [[Nuclear Regulatory Commission]]
: [[NRC]] [[U. S. Nuclear Regulatory Commission]]
: [[NRC]] [[]]
: [[U.]] [[S. Nuclear Regulatory Commission]]
: [[OSC]] [[Operations Support Center]]
: [[OSC]] [[Operations Support Center]]
: [[PAR]] [[Protective Action Recommendation]]
: [[PAR]] [[Protective Action Recommendation]]
: [[PARS]] [[Publicly Available Records PI Performance Indicator]]
: [[PARS]] [[Publicly Available Records]]
: [[PI]] [[Performance Indicator]]
: [[SDP]] [[Significance Determination Process]]
: [[SDP]] [[Significance Determination Process]]
: [[TI]] [[Temporary Instruction TSC Technical Support Center]]
: [[TI]] [[Temporary Instruction]]
: [[TSC]] [[Technical Support Center]]
}}
}}

Revision as of 06:36, 26 August 2018

IR 05000346-09-502 on 05/11/2009 - 05/15/2009 for Davis-Besse, Baseline Emergency Preparedness Biennial Exercise Inspection
ML091620529
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/09/2009
From: Hironori Peterson
Operations Branch III
To: Allen B
FirstEnergy Nuclear Operating Co
References
IR-09-502
Download: ML091620529 (13)


Text

June 9, 2009

Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/20009502

Dear Mr. Allen:

On May 15, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Davis-Besse Nuclear Power Station. The enclosed inspection report documents the inspection findings which were discussed on May 15, 2009, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA by B. Palagi for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety

Docket No. 50-346 License No. NPF-3

Enclosure:

Inspection Report 05000346/2009502

w/Attachment:

Supplemental Information See Attached Distribution

Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000346/20009502 Dear M

SUMMARY OF FINDINGS

IR 05000346/2009502; 05/11/2009 - 05/15/2009; Davis-Besse Nuclear Power Station; Baseline Emergency Preparedness Biennial Exercise Inspection. This report covers a 1 week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination

Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified

and Self-Revealed Findings

Cornerstone: Emergency Preparedness

No findings of significance were identified.

B. Licensee-Identified Violations

None.

2

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness

1EP1 Exercise Evaluation

.1 Exercise Evaluation

a. Inspection Scope

The inspectors reviewed the May 12, 2009, biennial emergency preparedness exercise's objectives and scenario to ensure that the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2007, 2008, and 2009, to verify that those drills' scenarios were sufficiently different from the scenario used in the May 12, 2009, exercise. The inspectors evaluated the licensee's exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:

  • Control Room Simulator (CRS);
  • Emergency Operations Facility (EOF). The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan. The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator (PI) Verification

.1 Drill/Exercise Performance

a. Inspection Scope

The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the first quarter 2008 through first quarter 2009. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 5, were used. The inspectors reviewed the licensee's records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance.

Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, performance during the 2008 exercise, and performance during other drills. Documents reviewed are listed in the Attachment to this report. This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.

b. Findings

No findings of significance were identified.

.2 Emergency Response Organization Drill Participation

a. Inspection Scope

The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the first quarter 2008 through first quarter 2009. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 5, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2008 exercise and other drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the to this report. This inspection constituted one ERO drill participation sample as defined in IP 71151-05.

b. Findings

No findings of significance were identified.

4.3 Alert and Notification System

a. Inspection Scope

The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the first quarter 2008 through first quarter 2009. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 5, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; and results of periodic ANS operability tests. Documents reviewed are listed in the Attachment to this report. This inspection constituted one alert and notification system sample as defined in IP 71151-05.

b. Findings

No findings of significance were identified.

4OA5 Other Activities

.1 (Closed) NRC Temporary Instruction (TI) 2515/175 "Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review"

The inspector performed TI 2515/175, ensured the completeness of the TI's Attachment 1, and then forwarded the data to NRC, Headquarters.

4OA6 Management Meetings

.1 Exit Meeting Summary

On May 15, 2009, the inspectors presented the inspection results to Mr. B. Allen and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

B. Allen, Site Vice-President
B. Boles, Maintenance Director
C. Bleam, Design Engineering Supervisor
B. Cope, Emergency Response Senior Nuclear Specialist
J. Dominy, Maintenance Manager
S. Filipucci, Security Operations Supervisor
L. Griffith, Human Resources Manager
C. Hensee, Engineering Supervisor
B. Hovland, Training Manager
D. Imlay, Operations Manager
D. Moul, Engineering Director
D. Noble, Radiation Protection Manager
C. Pride, Performance Improvement Director
S. Plymale, Plant Engineering Manager
M. Roelant, Work Management Manager
C. Steagall, Fleet Oversight Manager
P. Smith, Emergency Response Specialist
J. Sturdavant, Regulatory Compliance Senior Specialist
G. Van Wey, Emergency Response Nuclear Specialist
J. Vetter, Performance Improvement and Emergency Response Manager
M. Widner, Site Projects Manager
D. Wuokko, Regulatory Compliance Manager

Nuclear Regulatory Commission

J. Rutkowski, Senior Resident Inspector
A. Wilson, Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed

None

2

LIST OF DOCUMENTS REVIEWED

The following is a list of documents reviewed during the inspection.

Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1EP1 Exercise Evaluation Davis-Besse Nuclear Power Station Emergency Plan; Revision 26
Davis-Besse Nuclear Power Station Emergency Preparedness 2009 Evaluated Exercise; May 12, 2009
RA-EP-02110; Emergency Notification; Revision 9
RA-EP-02220; Emergency Operations Facility Activation and Response; Revision 6
RA-EP-02245; Protective Action Guidelines; Revision 5
RA-EP-02260; Radiological Controls in the DBAB; Revision 5
RA-EP-02310; Technical Support Center Activation and Response; Revision 7
RA-EP-02320; Emergency Technical Assessment; Revision 6
RA-EP-02620; Emergency Dose Control and Potassium Iodide Distribution, Revision 5
RA-EP-02720; Recovery Organization; Revision 9
CR 09-59213; EP Drill - GE Notification Form Accuracy; dated May 15, 2009
CR 09-59215; EP Drill - FEMA Question on Initial Notification Form; dated May 14, 2009
CR 09-59142; EP Drill - Potential Training Opportunity for Rarely Used EALs; dated May 13, 2009
CR 09-59151; EP Drill - Simulator Improvement during E-Plan Drills Opportunity; dated May 12, 2009
CR 09-59153; EP Drill - Simulator Crew Improvement Opportunity - SCM; dated May 12, 2009
CR 09-59154; EP Drill - Emergency Dosimetry Distribution for Security Personnel; dated May 12, 2009
CR 09-59162; EP Drill - Unauthorized Simulation; dated May 12, 2009
CR 09-59161; EP Drill - Evaluated Exercise - Loss of Station Vent Flow Undetected; dated May 12, 2009
CR 09-59164; EP Drill - Evaluated Exercise - Dose Projection Incorrect Release Data; dated May 12, 2009
CR 09-59179; EP Drill - OSC Manager Notification - Assembly and Accountability Not Communicated; dated May 12, 2009
CR 09-55865; Inconsistent Interpretation of Reference Material Regarding Release in Progress; dated March 22, 2009
CR 07-20671; EP Evaluated Exercise (5/15/07) - Dose Assessment Center Critique Items; dated May 15, 2007
CR 07-19084; EP Drill: Emergency Operations Facility Critique Items; dated April 19, 2007
CR 07-20661; EP Drill - Scenario/Drill Conduct Improvement Opportunities; dated May 16, 2007 4OA1 Performance Indicator Verification
RA-EP-04400; Prompt Notification System Test, Revision 11
DBBP-EMER-0003; NRC Performance Indicator Alert and Notification System (ANS) Reliability; Revision 7
DBEP-085-03; Alert and Notification (ANS) Reliability Test Documentation; January 2008 through March 2009
DBEP-082-02; NRC Performance Indicator Documentation Sheet for Classification, Notification, and Protective Action Recommendations; January 2008 through March 2009
NOBP-LP-4012-55; Emergency Response Organization Drill Participation Records; January 2008 through March 2009
CR 09-51704; NRC Performance Indicator for ERO Participation Data Submittal Correction; dated January 5, 2009
CR 09-51796; Misunderstanding of Impact of Changing Position Descriptions in FITS for ERO Participation Performance Indicator; dated January 5, 2009
4

LIST OF ACRONYMS

USED [[]]
ADAMS Agency-wide Documents Access and Management System
ANS Alert and Notification System
CFR Code of Federal Regulations
CR Condition Report
CRS Control Room Simulator
EOF Emergency Operations Facility
EP Emergency Preparedness
ERO Emergency Response Organization
IP Inspection Procedure
KI Potassium Iodide
NEI Nuclear Energy Institute
NUREG Nuclear Regulatory Commission
NRC [[]]
U. S. Nuclear Regulatory Commission
OSC Operations Support Center
PAR Protective Action Recommendation
PARS Publicly Available Records
PI Performance Indicator
SDP Significance Determination Process
TI Temporary Instruction
TSC Technical Support Center