June 15, 2021
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION - EMERGENCY PREPAREDNESS INSPECTION REPORT 05000346/2021501
Dear Mr. Brown:
On May 7, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety
Docket No. 05000346 License No. NPF-3
Enclosure:
As stated
Inspection Report
Docket Number:
05000346
License Number:
Report Number:
Enterprise Identifier: I-2021-501-0015
Licensee:
Energy Harbor Nuclear Corp.
Facility:
Davis-Besse Nuclear Power Station
Location:
Oak Harbor, OH
Inspection Dates:
May 03, 2021 to May 07, 2021
Inspectors:
J. Beavers, Senior Resident Inspector
M. Garza, Emergency Preparedness Inspector
G. Hansen, Senior Emergency Preparedness Inspector
D. Mills, Senior Resident Inspector
Approved By:
Patricia J. Pelke, Chief
Operations Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the Biennial Emergency Plan Exercise on May 4, 2021.
The exercise scenario simulated an event at the Davis-Besse Nuclear Plant that initiated with the declaration and notification of an Alert in response to abnormal plant conditions. The scenario conditions simulated the escalation of the significance of the event requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on March 31,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 03.12)===
- (1) January 1, 2020 through December 31, 2020
EP02: ERO Drill Participation (IP Section 03.13) (1 Sample)
- (1) January 1, 2020 through December 31, 2020
EP03: Alert & Notification System Reliability (IP Section 03.14) (1 Sample)
- (1) January 1, 2020 through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 7, 2021, the inspectors presented the emergency preparedness inspection results to Terry Brown and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-2019-03589
EP Drill - Initial OSC teams delayed due to HIS-20 issue
04/16/2019
CR-2019-03603
EP Drill - Objective F.4 Met With Comments - RMT team
delayed in obtaining air sample
05/17/2019
CR-2019-03607
EP Drill - Objective F.6 Met With Comments - Dose
Assessment incorrectly manually entered values for rad
monitor
04/17/2019
CR-2019-03688
EP Drill: KI evaluation not properly documented
04/18/2019
CR-2019-07712
EP Drill - Dose Assessment Failed Drill Objectives F.6 and
Skill Objective U.12
09/18/2019
CR-2019-07833
EP Drill - EOF Summary of Issues
09/18/2019
CR-2019-08504
EP Drill - Controller provided incorrect coaching to Dose
Assessment
10/15/2019
Miscellaneous
Miscellaneous
DBNPS EP Evaluated Exercise Scenario
03/05/2021
71151
Miscellaneous
NRC Performance Indicator Data; Emergency Preparedness
- Alert and Notification System
1st quarter
20 through
4th quarter
20
NRC Performance Indicator Data; Emergency Preparedness
- ERO Participation
1st quarter
20 through
4th quarter
20
NRC Performance Indicator Data; Emergency Preparedness
- DEP
1st quarter
20 through
4th quarter
20