IR 05000346/2021501

From kanterella
Jump to navigation Jump to search
Emergency Preparedness Inspection Report 05000346/2021501
ML21165A101
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/2021
From: Patricia Pelke
Division of Reactor Safety III
To: Tony Brown
Energy Harbor Nuclear Corp
References
IR 2021501
Download: ML21165A101 (7)


Text

June 15, 2021

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - EMERGENCY PREPAREDNESS INSPECTION REPORT 05000346/2021501

Dear Mr. Brown:

On May 7, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety

Docket No. 05000346 License No. NPF-3

Enclosure:

As stated

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2021501

Enterprise Identifier: I-2021-501-0015

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

May 03, 2021 to May 07, 2021

Inspectors:

J. Beavers, Senior Resident Inspector

M. Garza, Emergency Preparedness Inspector

G. Hansen, Senior Emergency Preparedness Inspector

D. Mills, Senior Resident Inspector

Approved By:

Patricia J. Pelke, Chief

Operations Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the Biennial Emergency Plan Exercise on May 4, 2021.

The exercise scenario simulated an event at the Davis-Besse Nuclear Plant that initiated with the declaration and notification of an Alert in response to abnormal plant conditions. The scenario conditions simulated the escalation of the significance of the event requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on March 31,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 03.12)===

(1) January 1, 2020 through December 31, 2020

EP02: ERO Drill Participation (IP Section 03.13) (1 Sample)

(1) January 1, 2020 through December 31, 2020

EP03: Alert & Notification System Reliability (IP Section 03.14) (1 Sample)

(1) January 1, 2020 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 7, 2021, the inspectors presented the emergency preparedness inspection results to Terry Brown and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.01

Corrective Action

Documents

CR-2019-03589

EP Drill - Initial OSC teams delayed due to HIS-20 issue

04/16/2019

CR-2019-03603

EP Drill - Objective F.4 Met With Comments - RMT team

delayed in obtaining air sample

05/17/2019

CR-2019-03607

EP Drill - Objective F.6 Met With Comments - Dose

Assessment incorrectly manually entered values for rad

monitor

04/17/2019

CR-2019-03688

EP Drill: KI evaluation not properly documented

04/18/2019

CR-2019-07712

EP Drill - Dose Assessment Failed Drill Objectives F.6 and

Skill Objective U.12

09/18/2019

CR-2019-07833

EP Drill - EOF Summary of Issues

09/18/2019

CR-2019-08504

EP Drill - Controller provided incorrect coaching to Dose

Assessment

10/15/2019

Miscellaneous

DBNPS Emergency Plan

71114.08

Miscellaneous

DBNPS EP Evaluated Exercise Scenario

03/05/2021

71151

Miscellaneous

NRC Performance Indicator Data; Emergency Preparedness

- Alert and Notification System

1st quarter

20 through

4th quarter

20

NRC Performance Indicator Data; Emergency Preparedness

- ERO Participation

1st quarter

20 through

4th quarter

20

NRC Performance Indicator Data; Emergency Preparedness

- DEP

1st quarter

20 through

4th quarter

20