IR 05000346/2009403

From kanterella
Jump to navigation Jump to search
IR 05000346-09-403(DRS), on 06/15/2009 - 06/19/2009; Davis-Besse Nuclear Power Station; Routine Security Baseline Inspection - Cover Letter
ML092160493
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/30/2009
From: Eric Duncan
Plant Support Branch II
To: Allen B
FirstEnergy Nuclear Operating Co
References
IR-09-403
Download: ML092160493 (5)


Text

uly 30, 2009

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000346/2009403(DRS)

Dear Mr. Allen:

On June 19, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on June 19, 2009, with Mr. V. Kaminskas and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of Human Performance, Resources,

H.2(c) because the licensee failed to maintain, complete, accurate, and up-to-date records. If you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Davis-Besse Nuclear Power Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305.

Additionally, a licensee-identified violation which was determined to be of very low security significance is listed in this report. However, because of its very low security significance, and because they are entered into your corrective action program, the NRC is treating these violations as Non-Cited Violations (NCVs) consistent with Section VI.A.1 of the NRC Enforcement Policy.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.:

Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Davis-Besse Nuclear Power Station.

The findings were both NRC-identified and licensee-identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1)..

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by Don Funk Acting for/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic Enclosure: Inspection Report 05000346/2009403(DRS)

w/Attachment: Supplemental Information DISTRIBUTION:

See next page