IR 05000346/2009406

From kanterella
Jump to navigation Jump to search
IR 05000346-09-406, (Drs), on 09/14/2009 - 09/17/2009, for Davis-Besse, Supplemental Inspection Report
ML093060365
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/29/2009
From: Boland A
Division of Reactor Safety III
To: Allen B
FirstEnergy Nuclear Operating Co
References
EA-08-326 IR-09-406
Download: ML093060365 (3)


Text

ber 29, 2009

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION NRC SUPPLEMENTAL INSPECTION REPORT 05000346/2009406(DRS)

Dear Mr. Allen:

On September 17, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection at your Davis-Besse Nuclear Power Station. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The enclosed inspection report documents the inspection results, which were discussed at the exit meeting on September 17, 2009, with Mr. V. Kaminskas and other members of your staff. The NRC was informed of your readiness for the inspection on August 13, 2009.

As required by the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was conducted to provide assurance that the root causes and contributing causes of the events resulting in a Greater than Green finding were understood, to independently assess the extent of condition and extent of cause, and to provide assurance that the corrective actions for significant performance issues were sufficient to address the root causes and contributing causes, and to prevent recurrence. The inspection consisted of plant walkdowns, a selected examination of representative records, and interviews with personnel.

Based on the results of this supplemental inspection, no findings of significance were identified.

EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5___________

Nuclear Regulatory Commission review required before Enclosure transmitted herewith contains public release. Safeguards Information. When separated from enclosure, this transmittal document is Donald Funk, RIII/DRS/PSB___________ decontrolled.

Name and organization of person making determination.

Date of determination: 10/26/09______ In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Anne T. Boland, Director Division of Reactor Safety Docket Nos. 50-346 License Nos. NPF-3 Nonpublic Enclosure: Inspection Report 05000346/2009406(DRS);

w/Attachment: Supplement Information ( )

cc w/encl ( ):

S. Coker, NSIR/DSO/DDSO/ST C. OClaire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ ( )