IR 05000346/2021403
| ML21286A775 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/14/2021 |
| From: | Steven Orth Plant Support Branch II |
| To: | Tony Brown Energy Harbor Nuclear Corp |
| Egan N | |
| References | |
| IR 2021403 | |
| Download: ML21286A775 (7) | |
Text
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000346/2021403
Dear Mr. Brown:
On September 16, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with Mr. J. Pry, Site Performance Improvement Director, and other members of your staff.
The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Steven K. Orth, Chief Plant Support Branch Division Reactor Safety Docket No. 05000346 License No. NPF-3
Enclosure:
As stated
Inspection Report
Docket Number:
05000346
License Number:
Report Number:
Enterprise Identifier:
I-2021-403-0019
Licensee:
Energy Harbor Nuclear Corp.
Facility:
Davis-Besse Nuclear Power Station
Location:
Oak Harbor, OH
Inspection Dates:
August 23, 2021 to September 16, 2021
Inspectors:
R. Cassara, Resident Inspector
N. Egan, Senior Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Davis-Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
On January 31, 2020, the Secretary of the United States Department of Health and Human Services declared a Public Health Emergency (PHE) on the public health risks of the COVID-19 coronavirus. In response to the PHE, Davis-Besse Nuclear Power Station pursued an exemption to security officer training and requalification requirements (ML20345A205 for specific exemptions approved). In addition to these exemptions, licensees implemented additional actions or alternatives in response to health concerns. As described in existing regulatory guidance (e.g., Regulatory Guide 5.75), licensees implemented measures to ensure annual Force-on-Force exercises were conducted as safely as possible while maintaining the requirements to simulate as closely as practicable site specific conditions and minimizing the number and effects of artificialities associated with these exercises (Part 73, Appendix B, VI.C.3).
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (2 Samples)
- (1) Tier I: All Requirements
Tier II: 02.05 a, 02.06 a-i, 02.06 m-n, 02.07 a, 02.07 d-e
Tier III: 02.09 a-b, 02.10 a, 02.11 a
- (2) Observed annual Force-on-Force exercises conducted on 08/25/2021.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On September 16, 2021, the inspectors presented the security baseline inspection results to Mr. J. Pry, Site Performance Improvement Director, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-2020-06552
COVID-19 PHE Training Exemption Tracking
08/20/2020
Davis-Besse Nuclear Power Station Protective Strategy
Manual
Physical Security Plan, Training and Qualification Plan, and
Safeguards Contingency Plan, for the Davis-Besse Nuclear
Power Station
Miscellaneous
Davis-Besse Nuclear Power Station Law Enforcement
Response Plan
NOBP-LP-1112
Training, Drills, and Exercise Risk Management
NOBP-LP-1114
Adversary Team Program
NOBP-LP-1122
Preparing for a Triennial Force-On-Force (FOF) Evaluation
NOP-LP-1401
Security Training Program
Procedures
NOP-LP-1402
Performance Evaluation Program
Self-Assessments
ATL-2020-0888-
ATA-20
21 Security Protective Strategy Evaluation
08/06/2021