{{#Wiki_filter:SAFEGUARDS INFORMATIO N May 18, 2011 Mr. Robert J. Duncan, II, Vice President Carolina Power & Light Company H.B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, SC 29550
[[Issue date::May 18, 2011]]
 
Mr. Robert J. Duncan, II, Vice President Carolina Power & Light Company H.B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, SC 29550


SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2; NRC SECURITY INSPECTION REPORT 05000261/2011201
SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2; NRC SECURITY INSPECTION REPORT 05000261/2011201


==Dear Mr. Duncan:==
==Dear Mr. Duncan:==
On March 25, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 7, 2011, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified.
On March 25, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 7, 2011, with you and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
No findings of significance were identified.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). . Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/
Sincerely,/RA/
Line 36: Line 37:


===Enclosure:===
===Enclosure:===
As stated cc w/encl: C. Johnson, NSIR J. Curry, NSIR D. Brady, NSIR S. Kennedy, RI M. Ernstes, RII, via SLES R. Skokowski, RIII M. Shannon, RIV S. West, H.B. Robinson Steam Electric Plant, Unit 2
As stated  
 
cc w/encl: C. Johnson, NSIR J. Curry, NSIR D. Brady, NSIR S. Kennedy, RI M. Ernstes, RII, via SLES R. Skokowski, RIII M. Shannon, RIV S. West, H.B. Robinson Steam Electric Plant, Unit 2  
 
ML111250400 OFFICE NSIR/DSO NSIR/DSO/SPEBRII NSIR/DSO/SPEB NAME R. Gibson A. Rayland K. Davis C. Johnson DATE 05/11/11 05/11/11 05/9/11via email 0518 /11
}}
}}

Revision as of 09:31, 8 August 2018

H. B. Robinson Steam Electric Plant, Unit 1; NRC Security Inspection Report 05000261/2011201
ML111250400
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/18/2011
From: Johnson R C
NRC/NSIR/DSO/DDSO/SPEB
To: Duncan R J
Carolina Power & Light Co
References
IR-11-201
Download: ML111250400 (3)


Text

SAFEGUARDS INFORMATIO N May 18, 2011 Mr. Robert J. Duncan, II, Vice President Carolina Power & Light Company H.B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT: H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2; NRC SECURITY INSPECTION REPORT 05000261/2011201

Dear Mr. Duncan:

On March 25, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the Security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 7, 2011, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). . Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-261 License No.: DPR-23

Enclosure:

As stated

cc w/encl: C. Johnson, NSIR J. Curry, NSIR D. Brady, NSIR S. Kennedy, RI M. Ernstes, RII, via SLES R. Skokowski, RIII M. Shannon, RIV S. West, H.B. Robinson Steam Electric Plant, Unit 2

ML111250400 OFFICE NSIR/DSO NSIR/DSO/SPEBRII NSIR/DSO/SPEB NAME R. Gibson A. Rayland K. Davis C. Johnson DATE 05/11/11 05/11/11 05/9/11via email 0518 /11