| {{#Wiki_filter:UNITED STATES .;:,vv "I), NUCLEAR REGULATORY COMMISSION t:! WASHINGTON, D.C. 20555*0001 << 0 : r4 November 16, 2012*,..,..*1' Energy Northwest Columbia Generating Station SUMMARY OF OCTOBER 18, 2012, MEETING WITH ENERGY NORTHWEST AND U.S. DEPARTMENT OF ENERGY ON POTENTIAL IMPACTS ON THE SITE FROM THE REMEDIATION OF WASTE BURIAL GROUND 618-11 (TAC NO. ME9721) On October 18, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), representatives of Energy Northwest, and the U.S. Department of Energy (DOE) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for the NRC staff to discuss potential impacts on the 618-11 site resulting from remediation activities that the DOE is undertaking in the controlled area at Columbia Generating Station (CGS). Energy Northwest, the licensee, plans to submit a license amendment request to address the impacts of the remediation activities. A list of attendees is provided as an Enclosure. The licensee's presentation slides on the status of the 618-11 Project are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 12292A 164. The 618-11 site is a waste burial ground adjacent to CGS that DOE plans to remediate shortly. The remediation will be done in two phases; the vertical pipe units and the trenches will be Phase 1 while the caissons will be Phase 2. The expected license amendment request would address the impacts on the site from Phase 1 of the remediation. Possible areas of impact include the emergency plan and control room habitability in case of an accident. The licensee will develop the license amendment request once DOE finalizes its Documented Safety Analysis, which is expected in the near future. Energy Northwest and the NRC staff then intend to have another pre-submittal meeting. The NRC staff queried Energy Northwest about the methods and engineering controls being planned for the remediation activities, the inventory in the burial ground, and the areas of impact that would be considered for the license amendment request. When appropriate, DOE contributed to the responses. Many of the NRC staff's questions and concerns will be better addressed after DOE finalizes its Documented Safety Analysis and after the memorandum of understanding currently under discussion concerning emergency plans, security, and other subjects is complete. The planned closed portion of the meeting was not held because the NRC staff did not have any questions that were not able to be addressed in the public forum. Prior to the public meeting, DOE and the NRC staff discussed the remediation effort and status without the licensee present. Beyond the information covered in the public meeting, DOE and the staff discussed the roles of the different federal agencies in relation to this project. | | {{#Wiki_filter:UNITED STATES .;:,vv "I), NUCLEAR REGULATORY COMMISSION t:! WASHINGTON, D.C. 20555*0001 |
| -Members of the public observed by teleconference. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-1056, or Lauren.Gibson@nrc.gov. Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. List of cc w/encl: Distribution via LIST OF ATTENDEES OCTOBER 18, 2012, MEETING WITH ENERGY NORTHWEST AND U.S. DEPARTMENT OF ENERGY 618-11 BURIAL GROUND REMEDIATION PROJECT AT COLUMBIA GENERATING STATION DOCKET NO. 50-397 U.S. Nuclear Regulatory Commission (*via teleconference) Lauren Gibson, Project Manager for Columbia Generating Station Michael T. Markley, Chief, Plant Licensing Branch IV Undine Shoop, Branch Chief, Health Physics and Human Performance Branch Mark Blumberg, Technical Reviewer, Accident Dose Branch Steven Garry, Technical Reviewer, Health Physics and Human Performance Branch Jennivine Rankin, Licensing Project Manager Jeremy Groom*, Sr. Resident Inspector, Columbia Generating Station Mahdi Hayes*, Resident Inspector, Columbia Generating Station Mike Norris*, Technical Reviewer for Emergency Planning (Office of Nuclear Security and Incident Response) Energy Northwest Mot Hedges Gary McNair Zach Dunham U.S. Department of Energy (via Video Teleconferencing) Mark French, Federal Project Director for the River Corridor Closure Project (RL-41) Catherine Louie, Deputy Federal Project Director for the River Corridor Project (RL-41) Jamie Zeisloft, River Corridor Project (RL-41) Mark Jackson, Team Lead, Authorization Basis Team, Safety and Engineering Division Paul MacBeth, Authorization Basis Team, Safety and Engineering Division Kyle Rankin, Authorization Basis Team, Safety and Engineering Division Warren Bryant, Contractor, Washington Closure Hanford Company John Darby, Contractor, Washington Closure Hanford Company Abdelhalim (Halim) Alsaed, Contractor, Washington Closure Hanford Company In addition, representatives of the State of Washington and the State of Oregon observed via teleconference. Enclosure | | << 0 : r4 November 16, 2012*,..,..*1' Energy Northwest Columbia Generating Station |
| -Members of the public observed by teleconference. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-1056, or Lauren.Gibson@nrc.gov. Docket No. List of cc w/encl: Distribution via DISTRIBUTION: PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrDraAadb Resource RidsNrrDraAhpb Resource RidsNrrLABurkhardt Resource RidsNrrPMColumbia Resource RidsNsirDdep Resource RidsOgcRp Resource IRA! Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn4MailCenter Resource TWertz, NRR MBlumberg, NRR/DRAlAADB SGarry, NRR/DRAlAHPB ,IRankin, NRR/DORLlLPL4 JGroom, RIVlDRP/PRB-AlCGS MHayes, RIVIDRP/PRB-AlCGS MNorris, NSIRIDPR/DDEP/ORLB SKennedy, EDO RIV ADAMS Accession Nos.: Mtg. Notice ML12278A121, Summary ML12306A333; Slides ML12292A164 *via email OFFiCi: DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORL/LPL4/PM NAME MMarkley (CFLyon LKGibson (BBenney LKGibson JBurkhardt* for) for) DATE 11/15/12 11/15/12 11/16/12 11/16/12 OFFICIAL RECORD COpy | | |
| }} | | ==SUMMARY== |
| | OF OCTOBER 18, 2012, MEETING WITH ENERGY NORTHWEST AND U.S. DEPARTMENT OF ENERGY ON POTENTIAL IMPACTS ON THE SITE FROM THE REMEDIATION OF WASTE BURIAL GROUND 618-11 (TAC NO. ME9721) On October 18, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), representatives of Energy Northwest, and the U.S. Department of Energy (DOE) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. |
| | The purpose of the meeting was for the NRC staff to discuss potential impacts on the 618-11 site resulting from remediation activities that the DOE is undertaking in the controlled area at Columbia Generating Station (CGS). Energy Northwest, the licensee, plans to submit a license amendment request to address the impacts of the remediation activities. |
| | A list of attendees is provided as an Enclosure. |
| | The licensee's presentation slides on the status of the 618-11 Project are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 12292A 164. The 618-11 site is a waste burial ground adjacent to CGS that DOE plans to remediate shortly. The remediation will be done in two phases; the vertical pipe units and the trenches will be Phase 1 while the caissons will be Phase 2. The expected license amendment request would address the impacts on the site from Phase 1 of the remediation. |
| | Possible areas of impact include the emergency plan and control room habitability in case of an accident. |
| | The licensee will develop the license amendment request once DOE finalizes its Documented Safety Analysis, which is expected in the near future. Energy Northwest and the NRC staff then intend to have another pre-submittal meeting. The NRC staff queried Energy Northwest about the methods and engineering controls being planned for the remediation activities, the inventory in the burial ground, and the areas of impact that would be considered for the license amendment request. When appropriate, DOE contributed to the responses. |
| | Many of the NRC staff's questions and concerns will be better addressed after DOE finalizes its Documented Safety Analysis and after the memorandum of understanding currently under discussion concerning emergency plans, security, and other subjects is complete. |
| | The planned closed portion of the meeting was not held because the NRC staff did not have any questions that were not able to be addressed in the public forum. Prior to the public meeting, DOE and the NRC staff discussed the remediation effort and status without the licensee present. Beyond the information covered in the public meeting, DOE and the staff discussed the roles of the different federal agencies in relation to this project. |
| | -Members of the public observed by teleconference. |
| | Public Meeting Feedback forms were not received. |
| | Please direct any inquiries to me at 301-415-1056, or Lauren.Gibson@nrc.gov. |
| | Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. |
| | List of cc w/encl: Distribution via LIST OF ATTENDEES OCTOBER 18, 2012, MEETING WITH ENERGY NORTHWEST AND U.S. DEPARTMENT OF ENERGY 618-11 BURIAL GROUND REMEDIATION PROJECT AT COLUMBIA GENERATING STATION DOCKET NO. 50-397 U.S. Nuclear Regulatory Commission |
| | (*via teleconference) |
| | Lauren Gibson, Project Manager for Columbia Generating Station Michael T. Markley, Chief, Plant Licensing Branch IV Undine Shoop, Branch Chief, Health Physics and Human Performance Branch Mark Blumberg, Technical Reviewer, Accident Dose Branch Steven Garry, Technical Reviewer, Health Physics and Human Performance Branch Jennivine Rankin, Licensing Project Manager Jeremy Groom*, Sr. Resident Inspector, Columbia Generating Station Mahdi Hayes*, Resident Inspector, Columbia Generating Station Mike Norris*, Technical Reviewer for Emergency Planning (Office of Nuclear Security and Incident Response) |
| | Energy Northwest Mot Hedges Gary McNair Zach Dunham U.S. Department of Energy (via Video Teleconferencing) |
| | Mark French, Federal Project Director for the River Corridor Closure Project (RL-41) Catherine Louie, Deputy Federal Project Director for the River Corridor Project (RL-41) Jamie Zeisloft, River Corridor Project (RL-41) Mark Jackson, Team Lead, Authorization Basis Team, Safety and Engineering Division Paul MacBeth, Authorization Basis Team, Safety and Engineering Division Kyle Rankin, Authorization Basis Team, Safety and Engineering Division Warren Bryant, Contractor, Washington Closure Hanford Company John Darby, Contractor, Washington Closure Hanford Company Abdelhalim (Halim) Alsaed, Contractor, Washington Closure Hanford Company In addition, representatives of the State of Washington and the State of Oregon observed via teleconference. |
| | Enclosure |
| | -Members of the public observed by teleconference. |
| | Public Meeting Feedback forms were not received. |
| | Please direct any inquiries to me at 301-415-1056, or Lauren.Gibson@nrc.gov. |
| | Docket No. |
| | List of cc w/encl: Distribution via DISTRIBUTION: |
| | PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrDraAadb Resource RidsNrrDraAhpb Resource RidsNrrLABurkhardt Resource RidsNrrPMColumbia Resource RidsNsirDdep Resource RidsOgcRp Resource IRA! Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn4MailCenter Resource TWertz, NRR MBlumberg, NRR/DRAlAADB SGarry, NRR/DRAlAHPB ,IRankin, NRR/DORLlLPL4 JGroom, RIVlDRP/PRB-AlCGS MHayes, RIVIDRP/PRB-AlCGS MNorris, NSIRIDPR/DDEP/ORLB SKennedy, EDO RIV AD AMS Accession Nos.: Mtg. Notice ML12278A121, Summary ML12306A333; Slides ML12292A164 |
| | *via email OFFiCi: DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORL/LPL4/PM NAME MMarkley (CFLyon LKGibson (BBenney LKGibson JBurkhardt* |
| | for) for) DATE 11/15/12 11/15/12 11/16/12 11/16/12 OFFICIAL RECORD COpy}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML12278A1212012-10-0404 October 2012 Notice of Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station Project stage: Meeting ML12292A1642012-10-18018 October 2012 Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 Project stage: Request ML12306A3332012-11-16016 November 2012 Summary of 10/18/12 Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station Project stage: Meeting 2012-10-04
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML24142A4982024-05-22022 May 2024 Summary of April 17, 2024, Partially Closed Pre-Application Meeting with Energy Northwest Regarding an Extended Power Uprate Combined with Maximum Load Line Limit Analysis Plus for Columbia Generating Station ML23297A2642023-11-0606 November 2023 October 5, 2023, Summary of Teleconference with Energy Northwest Regarding Proposed License Amendment Request to Revise the Emergency Plan for Columbia Generating Station ML23156A2822023-06-0505 June 2023 Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22067A1832022-03-10010 March 2022 Summary of Energy Northwest Regulatory Conference Columbia Generating Station, Airborne Radioactivity Event Resulting in Preliminary White Finding, March 1, 2022 ML21321A0422021-12-13013 December 2021 Summary of October 22, 2021, Teleconference Meeting with Energy Northwest Regarding Proposed License Amendment Requests to Adopt Technical Specifications Task Force (TSTF)-505, and 10 CFR 50.69 Categorization Program ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21112A3512021-05-0303 May 2021 Summary of March 31, 2021, Pre-Application Teleconference with Energy Northwest to Discuss a Planned LAR Deletion of Certain License Conditions Relating to License Renewal Commitments for Columbia Generating Station ML20322A0362020-11-19019 November 2020 Summary of October 19, 2020, Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML20314A0462020-11-0909 November 2020 Summary of November 4, 2020, NRC-NMFS Teleconference on Columbia Entrainment Study ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20101L5352020-04-14014 April 2020 Summary of April 6, 2020, Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Technical Specification Change License Amendment Request for the Columbia Generating Station ML19030A2152019-02-12012 February 2019 1/24/19, Summary of Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Shield Wall Deferral License Amendment Request for the Columbia Generating Station ML19030A3192019-02-12012 February 2019 1/17/2019, Summary of Presubmittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request at Columbia Generating Station ML18354B0992019-01-0303 January 2019 Summary of Pre-Submittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request for the Columbia Generating Station ML16266A3712016-09-29029 September 2016 Summary of Public Meeting with Energy Northwest to Discuss Upcoming License Amendment Request Regarding Change in Completion Time for Residual Heat Removal Pump a Repair for Columbia Generating Station ML16167A4602016-08-23023 August 2016 Summary of Closed Meeting with Representatives of the Us Army Corps of Engineers, Bureau of Reclamation, and Energy Northwest to Discuss the Flood Analysis Associated with Columbia Generating Station ML16193A0162016-07-14014 July 2016 Summary of 6/30/16 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 at Columbia Generating Station ML16138A3762016-05-25025 May 2016 Summary of 5/3/2016 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Regarding Emergency Control Room Chiller System at Columbia Generating Station ML16138A3292016-05-24024 May 2016 Summary of 5/2/2016 Prelicensing Meeting with Energy Northwest to Discuss Measurement Uncertainty Recapture Power Uprate License Amendment Request at Columbia Generating Station ML16126A4822016-05-17017 May 2016 Summary of Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Concerning Portional Reclassification of Reactor Water Cleanup System at Columbia Generating Station ML16138A1682016-05-0202 May 2016 Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR ML15187A4442015-07-0606 July 2015 Summary of a Regulatory Conference to Discuss the Safety Significance of a Columbia Finding Emergency Plan Implementing Procedures Did Not Implement Some Protective Action Recommendations Required by the Emergency Plan ML15173A2732015-06-30030 June 2015 Summary of June 4, 2015, Category 1 Public Meeting with Energy Northwest to Discussion Columbia Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1, ML15069A5162015-03-17017 March 2015 2/24/2014 Summary of Presubmittal Meeting with Energy Northwest to Discuss Relief Request for Radwaste Cleanup Piping for Columbia Generating Station ML14168A0452014-07-0808 July 2014 Summary of 6/10/14 Closed Meeting Between U.S. Army Corps of Engineers, U.S. Dept of Interior Bureau of Reclamation, and Energy Northwest to Discuss Flooding Analysis for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML12306A3332012-11-16016 November 2012 Summary of 10/18/12 Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML11350A0562011-12-21021 December 2011 12/15/11, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal Safety Evaluation Repo ML11339A0872011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 28, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Upper Shelf Energy Open Item in the Columbia License Renewal Safety Evaluation Report with O ML11339A0852011-12-12012 December 2011 November 8, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open Items ML11336A1502011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 14, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open I ML11249A0132011-11-21021 November 2011 08/29/2011-Summary of Tele Conf Call Between the USNRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11311A2662011-11-10010 November 2011 Summary of Tele Conf Call Held on 11/2/11, Between the USNRC and Energy Northwest, Concerning the Core Plate Hold-Down Bolts Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11305A1762011-11-0303 November 2011 Summary of Tele Conf Call Held on 10/27/11, Between the USNRC and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11291A0792011-11-0101 November 2011 09/27/2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Columbia Generating Station License Renewal Application (Tac No. ME3121) ML11273A0012011-10-0404 October 2011 Summary of Teleconf Call Held on Sept. 28, 2011, Between the USNRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11273A0662011-10-0404 October 2011 Summary of the Telephone Conference Call Held on September 29, 2011, Concerning the Inspection Report Pertaining to the Columbia Generating Station, License Renewal Application ML11256A3002011-09-23023 September 2011 Summary of Telephone Conference Call Held on September 12, 2011, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11238A1582011-09-14014 September 2011 8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML11250A0152011-09-0808 September 2011 Summary of Tele Conf Call Held on August 22, 2011, Btw the USNRC and Energy Northwest, Concerning Topics Pertaining to the Columbia Generating Station, License Renewal Application ML11223A3512011-08-23023 August 2011 Summary of Telephone Conference Call Held on August 11, 2011, Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generation Station, LRA ML11230B0892011-08-23023 August 2011 August 17, 2011, Summary of Conference Call Held, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11216A2532011-08-11011 August 2011 August 3, 2011, Summary of Telephone Conference Call Held Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11217A0222011-08-11011 August 2011 8/3-4/11, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11220A0102011-08-11011 August 2011 February 3, 2011, Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to the RAI Pertaining to the Columbia Generating Station, LRA 2024-06-28
[Table view] Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] |
Text
UNITED STATES .;:,vv "I), NUCLEAR REGULATORY COMMISSION t:! WASHINGTON, D.C. 20555*0001
<< 0 : r4 November 16, 2012*,..,..*1' Energy Northwest Columbia Generating Station
SUMMARY
OF OCTOBER 18, 2012, MEETING WITH ENERGY NORTHWEST AND U.S. DEPARTMENT OF ENERGY ON POTENTIAL IMPACTS ON THE SITE FROM THE REMEDIATION OF WASTE BURIAL GROUND 618-11 (TAC NO. ME9721) On October 18, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), representatives of Energy Northwest, and the U.S. Department of Energy (DOE) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was for the NRC staff to discuss potential impacts on the 618-11 site resulting from remediation activities that the DOE is undertaking in the controlled area at Columbia Generating Station (CGS). Energy Northwest, the licensee, plans to submit a license amendment request to address the impacts of the remediation activities.
A list of attendees is provided as an Enclosure.
The licensee's presentation slides on the status of the 618-11 Project are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 12292A 164. The 618-11 site is a waste burial ground adjacent to CGS that DOE plans to remediate shortly. The remediation will be done in two phases; the vertical pipe units and the trenches will be Phase 1 while the caissons will be Phase 2. The expected license amendment request would address the impacts on the site from Phase 1 of the remediation.
Possible areas of impact include the emergency plan and control room habitability in case of an accident.
The licensee will develop the license amendment request once DOE finalizes its Documented Safety Analysis, which is expected in the near future. Energy Northwest and the NRC staff then intend to have another pre-submittal meeting. The NRC staff queried Energy Northwest about the methods and engineering controls being planned for the remediation activities, the inventory in the burial ground, and the areas of impact that would be considered for the license amendment request. When appropriate, DOE contributed to the responses.
Many of the NRC staff's questions and concerns will be better addressed after DOE finalizes its Documented Safety Analysis and after the memorandum of understanding currently under discussion concerning emergency plans, security, and other subjects is complete.
The planned closed portion of the meeting was not held because the NRC staff did not have any questions that were not able to be addressed in the public forum. Prior to the public meeting, DOE and the NRC staff discussed the remediation effort and status without the licensee present. Beyond the information covered in the public meeting, DOE and the staff discussed the roles of the different federal agencies in relation to this project.
-Members of the public observed by teleconference.
Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1056, or Lauren.Gibson@nrc.gov.
Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
List of cc w/encl: Distribution via LIST OF ATTENDEES OCTOBER 18, 2012, MEETING WITH ENERGY NORTHWEST AND U.S. DEPARTMENT OF ENERGY 618-11 BURIAL GROUND REMEDIATION PROJECT AT COLUMBIA GENERATING STATION DOCKET NO. 50-397 U.S. Nuclear Regulatory Commission
(*via teleconference)
Lauren Gibson, Project Manager for Columbia Generating Station Michael T. Markley, Chief, Plant Licensing Branch IV Undine Shoop, Branch Chief, Health Physics and Human Performance Branch Mark Blumberg, Technical Reviewer, Accident Dose Branch Steven Garry, Technical Reviewer, Health Physics and Human Performance Branch Jennivine Rankin, Licensing Project Manager Jeremy Groom*, Sr. Resident Inspector, Columbia Generating Station Mahdi Hayes*, Resident Inspector, Columbia Generating Station Mike Norris*, Technical Reviewer for Emergency Planning (Office of Nuclear Security and Incident Response)
Energy Northwest Mot Hedges Gary McNair Zach Dunham U.S. Department of Energy (via Video Teleconferencing)
Mark French, Federal Project Director for the River Corridor Closure Project (RL-41) Catherine Louie, Deputy Federal Project Director for the River Corridor Project (RL-41) Jamie Zeisloft, River Corridor Project (RL-41) Mark Jackson, Team Lead, Authorization Basis Team, Safety and Engineering Division Paul MacBeth, Authorization Basis Team, Safety and Engineering Division Kyle Rankin, Authorization Basis Team, Safety and Engineering Division Warren Bryant, Contractor, Washington Closure Hanford Company John Darby, Contractor, Washington Closure Hanford Company Abdelhalim (Halim) Alsaed, Contractor, Washington Closure Hanford Company In addition, representatives of the State of Washington and the State of Oregon observed via teleconference.
Enclosure
-Members of the public observed by teleconference.
Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1056, or Lauren.Gibson@nrc.gov.
Docket No.
List of cc w/encl: Distribution via DISTRIBUTION:
PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrDraAadb Resource RidsNrrDraAhpb Resource RidsNrrLABurkhardt Resource RidsNrrPMColumbia Resource RidsNsirDdep Resource RidsOgcRp Resource IRA! Lauren K. Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsRgn4MailCenter Resource TWertz, NRR MBlumberg, NRR/DRAlAADB SGarry, NRR/DRAlAHPB ,IRankin, NRR/DORLlLPL4 JGroom, RIVlDRP/PRB-AlCGS MHayes, RIVIDRP/PRB-AlCGS MNorris, NSIRIDPR/DDEP/ORLB SKennedy, EDO RIV AD AMS Accession Nos.: Mtg. Notice ML12278A121, Summary ML12306A333; Slides ML12292A164
- via email OFFiCi: DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORL/LPL4/PM NAME MMarkley (CFLyon LKGibson (BBenney LKGibson JBurkhardt*
for) for) DATE 11/15/12 11/15/12 11/16/12 11/16/12 OFFICIAL RECORD COpy