Summary of April 6, 2020, Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Technical Specification Change License Amendment Request for the Columbia Generating Station
ML20101L535
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/14/2020
From: Klos L
Plant Licensing Branch IV
To: Sawatzke B
Energy Northwest
Klos L, 301-415-5136
References
EPID L-2020-LRM-0022
Download: ML20101L535 (4)


Text

April 14, 2020 LICENSEE: Energy Northwest FACILITY: Columbia Generating Station

SUBJECT:

SUMMARY

OF APRIL 6, 2020, PRESUBMITTAL TELECONFERENCE MEETING WITH ENERGY NORTHWEST, TO DISCUSS A TECHNICAL SPECIFICATION CHANGE LICENSE AMENDMENT REQUEST FOR COLUMBIA GENERATING STATION (EPID L-2020-LRM-0022)

On April 6, 2020, a Category 1 public meeting was held by teleconference between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest (the licensee). The purpose of the meeting was to discuss a planned license amendment request (LAR) regarding a change to Technical Specification (TS) 3.8.7 Distribution Systems -

Operating, for Columbia Generating Station (Columbia). The meeting notice and agenda, dated March 24, 2020, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20084N951. Enclosed is a list of attendees at the meeting.

During the meeting, the licensee presented information which was meant to further define the pending future submission. The licensees presentation used for the meeting is available in ADAMS at Accession No. ML20093F016. The licensees presentation outlined the licensing and technical aspects of the upcoming LAR including the scope of work, key features, and intended schedule plan for the amendment.

Also during the meeting, the NRC staff and the licensee discussed sufficiency items that should be considered as part of the upcoming submittal. Those items include:

1. a description of the TS completion time change and its basis reflective of operational experience;
2. a complete list of any and all compensatory measures associated with this license amendment;
3. a description of why the bucket could not be replaced online;
4. a description of why this LAR request is not applicable to other, similar control power transformers in the plant;
5. a clear description of whether the TS completion time request applies to the replacement of the electrical bucket or its starter coil, or both.

Members of the public were not in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-5136, or by e-mail at John.Klos@nrc.gov.

/RA/

L. John Klos, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES APRIL 6, 2020, PRESUBMITTAL TELECONFERENCE MEETING WITH ENERGY NORTHWEST REGARDING A PROPOSED LICENSE AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATION 3.8.7 FOR COLUMBIA GENERATING STATION NAME ORGANIZATION Steve Smith NRC1 (NRR2)

Mehdi Reisi Fard NRC (NRR)

John Klos NRC (NRR)

Charles Moulton NRC (NRR)

Jorge Cintron-Rivera NRC (NRR)

Khoi Nguyen NRC (NRR)

Richard Garcia Energy Northwest Desiree Wolfgramm Energy Northwest Mike Pezzetti Energy Northwest Keven Van Speybroeck Energy Northwest David Clymer Energy Northwest Woody Layne Energy Northwest James Darling Energy Northwest Habib Shtaih Energy Northwest 1

U.S. Nuclear Regulatory Commission 2

Office of Nuclear Reactor Regulation Enclosure

Meeting Notice ML20084N951 Meeting Summary ML20101L535 *via e-mail OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME JKlos PBlechman JDixon-Herrity JKlos DATE 04/09/2020 04/14/2020 04/14/2020 04/14/2020