ML11230B089

From kanterella
Jump to navigation Jump to search

August 17, 2011, Summary of Conference Call Held, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA
ML11230B089
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/23/2011
From: Cunanan A
License Renewal Projects Branch 1
To:
Cunanan A
References
TAC ME3058
Download: ML11230B089 (5)


Text

",,,,jl.l\ REGU~ UNITED STATES

,;t~¥.~:~O~

... C'l NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 of . 0

... 3:

(/) ~

~ . Pi August 23, 2011

...;.... ~

-v? ~O APPLICANT: Energy Northwest FACILITY: Columbia Generating Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 17, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE RESPONSE TO THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NO. ME3058)

The U.S. Nuclear Regulatory Commission and representatives of Energy Northwest (the applicant), held a telephone conference call on August 17, 2011, to discuss and clarify the response to the request for additional information (RAI) concerning the Columbia Generating Station, license renewal application.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains the RAI discussed with the applicant, including a brief description on the status of the item.

The applicant had an opportunity to comment on this summary.

~~

Arthur D. Cunanan, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosures:

As stated cc w/encls: Listserv

TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS August 17, 2011 PARTICIPANTS: AFFILIATIONS:

Arthur Cunanan U,S. Nuclear Regulatory Commission (NRC)

Allen Hiser NRC Abbas Mostala Energy Northwest (EN)

Janet Worthington EN Scott Wood EN John Twomey EN Steven Richter EN ENCLOSURE 1

TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATIONS AUGUST 17, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest (the applicant), held telephone conference call on August 17, 2011, to discuss the following response to the request for additional information (RAI) concerning the Columbia Generating Station (Columbia) license renewal application (LRA).

Response to RAI B.2.1 0-2: Related to the core plate rim hold-down bolts The following discussion was related to a follow-up telephone conference call held on August 11, 2011.

Discussion:

The applicant clarified what prompted Columbia to verify that core plate wedges were not installed. The applicant will include in its LRA supplement on the core plate rim hold-down bolts time limited aging analysis disposition, a statement that it had reviewed the boiling water reactor vessel internals project (BWRVIP) inspection guidance and ensured that all other inspection guidance from the BWRVIP reports have been captured.

The staff will not send an additional RAI.

ENCLOSURE 2

ML11230B089 *concurrence via e-mail IloFFICE LA: DLR/RPB1* PM: DLR/RPB1 BC: DLRlRPB1 LA: DLR/RPB 1 PM: DLR/RPB1 I!

1 NAME SFigueroa ACunanan DMorey SFigueroa ACunanan i

I DATE 08/19/2011 08/19/2011 08/19/2011 08/22/2011 08/23/2011 i Letter to Energy Northwest from Arthur D. Cunanan dated August 23, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 17, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST, CONCERNING THE RESPONSE TO THE REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE COLUMBIA GENERATING STATION, LICENSE RENEWAL APPLICATION (TAC NO. ME3058)

DISTRIBUTION:

HARD COPY:

DLR RtF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource DDoyle MThadani WWalker, RIV RCohen, RIV LSubin,OGC