Text

Jeremy S. Hauger Columbia Generating Station P.O. Box 968, PE30 Richland, WA 99352-0968 509.377.8727 jshauger@energy-northwest.com GO2-24-063 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 NOTIFICATION OF EXTENSION TO COLUMBIAS FOURTH 10-YEAR INTERVAL INSERVICE TESTING PROGRAM PLAN

Reference:

Letter from Energy Northwest to NRC, Submittal of Fourth 10-Year Inservice Testing (IST) Program Plan, dated April 23, 2015 (ADAMS Accession Number ML15113A503)

Dear Sir or Madam:

In the referenced letter, Energy Northwest submitted the fourth 10-year interval Inservice Testing (IST) Plan and identified the end date of the interval as December 12, 2024. Energy Northwest is informing the U.S. Nuclear Regulatory Commission (NRC) of the intent to extend the current fourth 10-year interval of the Columbia Generating Station IST Program past its planned end date of December 12, 2024, by one year. This notification is provided in accordance with the recommendation in Section 3.3.1 of NUREG-1482, Guidelines for Inservice Testing at Nuclear Power Plants, that a licensee inform the NRC of any extension before the date that would have been the end of the current interval.

Extension of the interval is allowed by the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code. This extension is made pursuant to ASME OM Code 2004 Edition, 2005 and 2006 Addenda, sub-article ISTA-3120(d),

Inservice Test Interval that is incorporated by reference in paragraph (a) of 10 CFR 50.55a and provides allowance for inservice test intervals to be extended or decreased by as much as one year. As required by the Code, this extension will not cause successive intervals to be altered by more than one year from the original pattern of intervals.

        



July 15, 2024 ENERGY NORTHWEST

GO2-24-063 Page 2 of 2 There are no regulatory commitments made in this submittal.

If you have any questions or require additional information, please contact Mr. R. M.

Garcia at 509-377-8463.

Executed this ____ day of July, 2024.

Respectfully, Jeremy S. Hauger Vice President, Engineering cc:

NRC RIV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C CD Sonoda - BPA/1399 EFSECutc.wa.gov - EFSEC E Fordham - WDOH R Brice - WDOH L Albin - WDOH